Hapur Pilakhua Development Authority Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Hapur Pilakhua Development Authority - HPDA Tender
Civil And Construction
Road Construction
Eprocure
Opening Date4 May 2025
Closing Date20 May 2025
Tender Amount₹ 55,55,595
Costs
EMD
₹ 2,77,800Document Cost
₹ 3,540Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_HPDA_1035994_1Tender No
37/SE/HPDA/2025Tender Authority
Hapur Pilakhua Development Authority ViewPurchaser Address
-Website
http://https://hpdaonline.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of granular sub-base by providing coarse graded material, spreading in uniform layer with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401, MORT&H - 401.
250
3692
923200
... More
Construction of dry lean cement concrete sub base over a prepared sub-grade with coarse and fine aggregate conforming to IS:383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per specifications, cement content not to be less than 150 Kg/cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, for all leads & lifts, laid with a mechanical paver, compacting with 8-10 tonne vibratory roller, finishing and curing etc. complete as per direction of Engineer-in- charge.
165
3498
577330.0499999999
... More
Supply & fixing of Sepreation membren of permaiable Plastic Sheet 125 micron thick i/c supply of all meteriels & labours as per direction of E/I
1645
12
20809.25
... More
Providing and laying design mix cement concrete of M-40 grade, in roads/ taxi tracks/ runways, using cement content as per design mix, using coarse sand and graded stone aggregate of 40 mm nominal size in appropriate proportions as per approved & specified design criteria, providing dowel bars with sleeve/ tie bars wherever required, laying at site, spreading and compacting mechanically by using needle and surface vibrators, levelling to required slope/ camber, finishing with required texture, including steel form work with sturdy M.S. channel sections, curing, making provision for contraction/ expansion, construction & longitudinal joints (10 mm wide x 50 mm deep) by groove cutting machine, providing and filling joints with approved joint filler and sealants, complete all as per direction of Engineer-in-charge (Item of joint fillers, sealants, dowel bars with sleeve/ tie bars to be paid separately). Note:- Cement content considered in M-30 is @ 340 kg/cum. Excess/ less cement used as per design mix is payable/ recoverable separately. Cement concrete prepared with batch mixing machine & Cement concrete manufactured in automatic batching plant (RMC plant) i/c transportation to site in transit mixer
329
9251
3043796.14
... More
Extra for providing and mixing hardening compound of approved quality as per manufacturer's specification in cement concrete.
823
46
38524.630000000005
... More
M.S (tor steel or plain ) in work such as RCC or RB work including bending for proper
shape and including supply of steel & its wastage, bend, hooks, and authories overlaping shall be measured and including cost of binding wire
52
7502
390105.04000000004
... More
PART (B) :- CULVERT WORK
-
-
-
... More
Earthwork in Foundation in ordinary soil (loam, clay or sand) including lift upto 1.50m and lead upto 30m. and including filling watering and ramming of excavated earth into the trenches or into space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30m from the foundation trenches.
83
110
9130
... More
Cement concrete with 4 cm gauge approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials , labour, tools & plants etcc required for proper completion of the work.In bedding of RCC pipes,including cost of form work in the
trenches
5
4300
21500
... More
M-150 Brick work in 1:4 ( 1cement : 4 coarse sand) in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work
9
5170
46530
... More
Cement concrete with 2cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.
3
7050
21150
... More
12mm thick plaster with cement and coarse sand in 1:4 over brick work minimum thickness not to be less than 10mm thick including supply of all materials, labour and T & P etc.
required for proper completion of the work.
78
200
15600
... More
R.C.C work with cement , approved coarse sand & 2cm gauge approved slone grit in proportions of 1:1.5:3 in slab excluding supply of reinforcement andits bending , but including its fixing and binding the same with 24 B.W. G.G.I binding wire and shuttering tetc and supply of all materials labour tools & plants etc required for proper completion of the work including cost of binding wire .
25
9030
225750
... More
M.S (tor steel or plain ) in work such as RCC or RB work including bending for proper
shape and including supply of steel & its wastage, bend, hooks, and authories overlaping shall be measured and including cost of binding wire
20
7502
150040.40000000002
... More
Supply of Sweeper (Lump Sum Qty)
20
400
8000
... More
Pumping out water caused by spring ,tidal or river seepage , broken water mains or drain or well point pumping and the like .
30
308
9240
... More
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar
8.47
600
5082
... More
Demolishing reinforced cement concrete or reinforced brick work including stacking of material as direction by Engineer-in-charge. Within a distance of 60 metres(200feet)
5
1340
6700