Greater Noida Industrial Development Authority Tender

... More
The GNIDA has issued a formal invitation for competitive bids for the Greater Noida Industrial Development Authority project, for Operation And Maintenance Work Of 137 Mld Stp Including Mps O And M (for 60 Months) At Kasna, Greater Noida in Gautam Buddha Nagar, Uttar Pradesh, with an estimated contract value of Rs. 21,82,34,481. The bid opening date for this tender is 25-03-2025 and the last date for bid submission is 08-04-2025. Interested bidders for Greater Noida Industrial Development Authority tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Greater Noida Industrial Development Authority - GNIDA Tender

Opening Date25 Mar 2025
Closing DateCancelled
Tender Amount₹ 21,82,34,481 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free

GEM & Bid Advisory Services

Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Operation and maintenance of the various units of 137 mld stp plant based on sequential bach reactor (SBR) technology for 5 Years as a whole including supply of chemical and consumables disposal of plant residuals (eg. screening , grit, and dewatered sludge ) manpower required complete maintenance of civil structure preventive and complete maintenance of mechanical equipment, electrical item field instrument, Horticulture & Landscapping etc. cost of collection analysis reporting monitoring and maintaining.

-

-

-

... More
Operational Staff

1

5528571

5528571.42

... More
A-Variable Cost for IIIrd Year Dewatering polymer @ 1.2 kg/ton of dry Solids

9636

358

3455469.6

... More
B-Fix Cost For IIIrd Year Civil, E&M Maintenance Work

1

24604722

24604722.24

... More
Above Monitoring System shall comprise Local Real Time Data Acquisition Unit with Backlight LCD display with the provision of up linking the data intermittently during the day via SMS/ GPRS to Mobile/s or the Centralized Monitoring Station (Client’s Scope) in CSV format. (a) including O & M for Ist year 137 MLD STP Kasna

1

2562000

2562000

... More
Operation and maintenance of the various units of 137 mld stp plant based on sequential bach reactor (SBR) technology for 5 Years as a whole including supply of chemical and consumables disposal of plant residuals (eg. screening , grit, and dewatered sludge ) manpower required complete maintenance of civil structure preventive and complete maintenance of mechanical equipment, electrical item field instrument, Horticulture & Landscapping etc. cost of collection analysis reporting monitoring and maintaining.

-

-

-

... More
Operational Staff

1

5528571

5528571.42

... More
Operation and maintenance of the various units of MPS Kasna and consumables disposal of plant residuals (eg. screening sludge ), manpower required as per CPHEEO Mannual, complete maintenance of civil structure preventive and complete maintenance of mechanical equipment, electrical item field instrument, Rising main line from mps to 137 mld stp, DG Sets, flow meter, Horticulture & Landscapping, Road etc. cost of collection analysis reporting monitoring and maintaining log book of pumps & record of outgoing sewage daily collected at least for twice time a day from the entry and exit of the MPS Units there on (Including Diesel & Consumable for Weekly trial of DG Set, Excluding power and diesel for DG Set to running Plant) Civil, E&M, Rising Main upto STP Maintenance Work

-

-

-

... More
(.c) O & M for 3rd year 137 MLD STP Kasna

1

76860

76860

... More
Chlorine @ 5mg/l

200750

16

3250142.5

... More
Chlorine @ 5mg/l

164250

16

2659207.5

... More
Operation and maintenance of the various units of 137 mld stp plant based on sequential bach reactor (SBR) technology for 5 Years as a whole including supply of chemical and consumables disposal of plant residuals (eg. screening , grit, and dewatered sludge ) manpower required complete maintenance of civil structure preventive and complete maintenance of mechanical equipment, electrical item field instrument, Horticulture & Landscapping etc. cost of collection analysis reporting monitoring and maintaining.

-

-

-

... More
Chlorine @ 5mg/l

182500

16

2954675

... More
Operational Staff

1

5528571

5528571.42

... More
Operation and maintenance of the various units of MPS Kasna and consumables disposal of plant residuals (eg. screening sludge ), manpower required as per CPHEEO Mannual, complete maintenance of civil structure preventive and complete maintenance of mechanical equipment, electrical item field instrument, Rising main line from mps to 137 mld stp, DG Sets, flow meter, Horticulture & Landscapping, Road etc. cost of collection analysis reporting monitoring and maintaining log book of pumps & record of outgoing sewage daily collected at least for twice time a day from the entry and exit of the MPS Units there on (Including Diesel & Consumable for Weekly trial of DG Set, Excluding power and diesel for DG Set to running Plant) Civil, E&M, Rising Main upto STP Maintenance Work

-

-

-

... More
Operational Staff

1

2239285

2239285.71

... More
Operational Staff

1

2239285

2239285.71

... More
B-Fix Cost For IInd Year Civil, E&M Maintenance Work

1

24604722

24604722.24

... More
Operational Staff

1

5528571

5528571.42

... More
A-Variable Cost for Vth Year Dewatering polymer @ 1.2 kg/ton of dry Solids

12001.2

358

4303630.32

... More
Carriage of Sludge, Grit, Floating particle from STP to Dumping Ground/Low line area Lead upto 5KM

7043.86

127

900205.31

... More
Carriage of Sludge, Grit, Floating particle from STP to Dumping Ground/Low line area Lead upto 5KM

6403.51

127

818368.58

... More
(b) O & M for 2nd year 137 MLD STP Kasna

1

76860

76860

... More
Carriage of Sludge, Grit, Floating particle from STP to Dumping Ground/Low line area Lead upto 5KM

8772.81

127

1121165.12

... More
Chlorine @ 5mg/l

219000

16

3545610

... More
A-Variable Cost for IVth Year Dewatering polymer @ 1.2 kg/ton of dry Solids

10512

358

3769603.2

... More
(d) O & M for 4th year 137 MLD STP Kasna

1

76860

76860

... More
B-Fix Cost For Ist Year Civil, E&M Maintenance Work

1

24604722

24604722.24

... More
Operation and maintenance of the various units of 137 mld stp plant based on sequential bach reactor (SBR) technology for 5 Years as a whole including supply of chemical and consumables disposal of plant residuals (eg. screening , grit, and dewatered sludge ) manpower required complete maintenance of civil structure preventive and complete maintenance of mechanical equipment, electrical item field instrument, Horticulture & Landscapping etc. cost of collection analysis reporting monitoring and maintaining.

-

-

-

... More
Civil, E&M, Rising Main upto STP Maintenance Work

1

2892810

2892810.02

... More
(e) O & M for 5th year 137 MLD STP Kasna

1

76860

76860

... More
Civil, E&M, Rising Main Maintenance Work

1

2892810

2892810.02

... More
Civil, E&M, Rising Main Maintenance Work

1

2892810

2892810.02

... More
Operation and maintenance of the various units of MPS Kasna and consumables disposal of plant residuals (eg. screening sludge ), manpower required as per CPHEEO Mannual, complete maintenance of civil structure preventive and complete maintenance of mechanical equipment, electrical item field instrument, Rising main line from mps to 137 mld stp, DG Sets, flow meter, Horticulture & Landscapping, Road etc. cost of collection analysis reporting monitoring and maintaining log book of pumps & record of outgoing sewage daily collected at least for twice time a day from the entry and exit of the MPS Units there on (Including Diesel & Consumable for Weekly trial of DG Set, Excluding power and diesel for DG Set to running Plant) Civil, E&M, Rising Main upto STP Maintenance Work

-

-

-

... More
Labour cess and GST will be paid extra as per Govt. orders.

-

-

-

... More
Supply Installation Testing Commissioning of Online open channel microprocessor based ultrasonic type Flow meter along with following features: 1) Type of Display: 2-Line LCD display with operational Key. 2) Transmeter type: Remote wall mounted with cable gland.3) Unit of display: Flow rate : m3/hr, Totalizer flow : m3 4) Accuracy: +/- 0.5% of measured value. 5) Power Supply: 0-50VAC,45-65Hz, optinal : 11-40VDC 6) Self diagnostic features 7) Transmitter enclosure material : Non-corrosive, Die cast aluminium/Polycarbonate 8) Memory: 100% secure data storage 9) Communication: Suitable for wired communication. 10) Protection class:IP67 including O & M for five year 137 MLD STP Kasna

2

262500

525000

... More
137 MLD STP O&M Operation and maintenance of the various units of 137 mld stp plant based on sequential bach reactor (SBR) technology for 5 Years as a whole including supply of chemical and consumables disposal of plant residuals (eg. screening , grit, and dewatered sludge ) manpower required complete maintenance of civil structure preventive and complete maintenance of mechanical equipment, electrical item field instrument, Horticulture & Landscapping etc. cost of collection analysis reporting monitoring and maintaining.

-

-

-

... More
Operational Staff

1

2239285

2239285.71

... More
B-Fix Cost For Vth Year Civil, E&M Maintenance Work

1

24604722

24604722.24

... More
Operation and maintenance of the various units of MPS Kasna and consumables disposal of plant residuals (eg. screening sludge ), manpower required as per CPHEEO Mannual, complete maintenance of civil structure preventive and complete maintenance of mechanical equipment, electrical item field instrument, Rising main line from mps to 137 mld stp, DG Sets, flow meter, Horticulture & Landscapping, Road etc. cost of collection analysis reporting monitoring and maintaining log book of pumps & record of outgoing sewage daily collected at least for twice time a day from the entry and exit of the MPS Units there on (Including Diesel & Consumable for Weekly trial of DG Set, Excluding power and diesel for DG Set to running Plant) Civil, E&M, Rising Main upto STP Maintenance Work

-

-

-

... More
Carriage of Sludge, Grit, Floating particle from STP to Dumping Ground/Low line area Lead upto 5KM

7684.21

127

982042.04

... More
OCEMS WORK "Supply, Installation, Testing & Commissioning of Effluent Quality Monitoring System at Designated Location for Real Time based continuous measurement using chemical free common / separate sensors for following parameters within their specified measuring ranges. COD, BOD, TSS,Nitrate, Total Nitrogen Total Phosphorus, pH and temperature as per the attached Annexure ""A"". Complete all work, including one year Operation and Maintenance.Online Effluent monitoring data to be connect with servers of the concerned SPCB/PCC and CPCB in a time bound manner.

-

-

-

... More
MPS Kasna O&M Operation and maintenance of the various units of MPS Kasna and consumables disposal of plant residuals (eg. screening sludge ), manpower required as per CPHEEO Mannual, complete maintenance of civil structure preventive and complete maintenance of mechanical equipment, electrical item field instrument, Rising main line from mps to 137 mld stp, DG Sets, flow meter, Horticulture & Landscapping, Road etc. cost of collection analysis reporting monitoring and maintaining log book of pumps & record of outgoing sewage daily collected at least for twice time a day from the entry and exit of the MPS Units there on (Including Diesel & Consumable for Weekly trial of DG Set, Excluding power and diesel for DG Set to running Plant)

-

-

-

... More
Operational Staff

1

2239285

2239285.71

... More
Operational Staff

1

2239285

2239285.71

... More
A-Variable Cost for IInd Year Dewatering polymer @ 1.2 kg/ton of dry Solids

8760

358

3141336

... More
B-Fix Cost For IVth Year Civil, E&M Maintenance Work

1

24604722

24604722.24

... More
Carriage of Sludge, Grit, Floating particle from STP to Dumping Ground/Low line area Lead upto 5KM

5763.16

127

736531.85

... More
Chlorine @ 5mg/l

250025

16

4047904.75

... More
A-Variable Cost for Ist Year Dewatering polymer @ 1.2 kg/ton of dry Solids

7884

358

2827202.4



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.