Greater Noida Industrial Development Authority Tender
... More
The GNIDA has issued a formal invitation for competitive bids for the Greater Noida Industrial Development Authority project, for Operation And Maintenance Work Of 137 Mld Stp Including Mps O And M (for 60 Months) At Kasna, Greater Noida in Gautam Buddha Nagar, Uttar Pradesh, with an estimated contract value of Rs. 21,82,34,481. The bid opening date for this tender is 25-03-2025 and the last date for bid submission is 08-04-2025. Interested bidders for Greater Noida Industrial Development Authority tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Greater Noida Industrial Development Authority - GNIDA Tender
Opening Date25 Mar 2025
Closing DateCancelled
Tender Amount₹ 21,82,34,481
Costs
EMD
₹ 31,83,000Document Cost
₹ 6,770Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_GNIDA_1020311_16Bid Award Id
ViewTender No
SM/(E-TENDER CELL)/2025/584 DATED-20.03.2025Tender Authority
Greater Noida Industrial Development Authority ViewPurchaser Address
-Website
http://https://www.greaternoidaauthority.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Operation and maintenance of the various units of 137 mld stp plant based on sequential bach reactor (SBR) technology for 5 Years as a whole including supply of chemical and consumables disposal of plant residuals (eg. screening , grit, and dewatered sludge ) manpower required complete maintenance of civil structure preventive and complete maintenance of mechanical equipment, electrical item field instrument, Horticulture & Landscapping etc. cost of collection analysis reporting monitoring and maintaining.
-
-
-
... More
Operational Staff
1
5528571
5528571.42
... More
A-Variable Cost for IIIrd Year
Dewatering polymer @ 1.2 kg/ton of dry Solids
9636
358
3455469.6
... More
B-Fix Cost For IIIrd Year
Civil, E&M Maintenance Work
1
24604722
24604722.24
... More
Above Monitoring System shall comprise Local Real Time Data Acquisition Unit with Backlight LCD display with the provision of up linking the data intermittently during the day via SMS/ GPRS to Mobile/s or the Centralized Monitoring Station (Client’s Scope) in CSV format. (a) including O & M for Ist year 137 MLD STP Kasna
1
2562000
2562000
... More
Operation and maintenance of the various units of 137 mld stp plant based on sequential bach reactor (SBR) technology for 5 Years as a whole including supply of chemical and consumables disposal of plant residuals (eg. screening , grit, and dewatered sludge ) manpower required complete maintenance of civil structure preventive and complete maintenance of mechanical equipment, electrical item field instrument, Horticulture & Landscapping etc. cost of collection analysis reporting monitoring and maintaining.
-
-
-
... More
Operational Staff
1
5528571
5528571.42
... More
Operation and maintenance of the various units of MPS Kasna and consumables disposal of plant residuals (eg. screening sludge ), manpower required as per CPHEEO Mannual, complete maintenance of civil structure preventive and complete maintenance of mechanical equipment, electrical item field instrument, Rising main line from mps to 137 mld stp, DG Sets, flow meter, Horticulture & Landscapping, Road etc. cost of collection analysis reporting monitoring and maintaining log book of pumps & record of outgoing sewage daily collected at least for twice time a day from the entry and exit of the MPS Units there on (Including Diesel & Consumable for Weekly trial of DG Set, Excluding power and diesel for DG Set to running Plant) Civil, E&M, Rising Main upto STP Maintenance Work
-
-
-
... More
(.c) O & M for 3rd year 137 MLD STP Kasna
1
76860
76860
... More
Chlorine @ 5mg/l
200750
16
3250142.5
... More
Chlorine @ 5mg/l
164250
16
2659207.5
... More
Operation and maintenance of the various units of 137 mld stp plant based on sequential bach reactor (SBR) technology for 5 Years as a whole including supply of chemical and consumables disposal of plant residuals (eg. screening , grit, and dewatered sludge ) manpower required complete maintenance of civil structure preventive and complete maintenance of mechanical equipment, electrical item field instrument, Horticulture & Landscapping etc. cost of collection analysis reporting monitoring and maintaining.
-
-
-
... More
Chlorine @ 5mg/l
182500
16
2954675
... More
Operational Staff
1
5528571
5528571.42
... More
Operation and maintenance of the various units of MPS Kasna and consumables disposal of plant residuals (eg. screening sludge ), manpower required as per CPHEEO Mannual, complete maintenance of civil structure preventive and complete maintenance of mechanical equipment, electrical item field instrument, Rising main line from mps to 137 mld stp, DG Sets, flow meter, Horticulture & Landscapping, Road etc. cost of collection analysis reporting monitoring and maintaining log book of pumps & record of outgoing sewage daily collected at least for twice time a day from the entry and exit of the MPS Units there on (Including Diesel & Consumable for Weekly trial of DG Set, Excluding power and diesel for DG Set to running Plant) Civil, E&M, Rising Main upto STP Maintenance Work
-
-
-
... More
Operational Staff
1
2239285
2239285.71
... More
Operational Staff
1
2239285
2239285.71
... More
B-Fix Cost For IInd Year
Civil, E&M Maintenance Work
1
24604722
24604722.24
... More
Operational Staff
1
5528571
5528571.42
... More
A-Variable Cost for Vth Year
Dewatering polymer @ 1.2 kg/ton of dry Solids
12001.2
358
4303630.32
... More
Carriage of Sludge, Grit, Floating particle from STP to Dumping Ground/Low line area Lead upto 5KM
7043.86
127
900205.31
... More
Carriage of Sludge, Grit, Floating particle from STP to Dumping Ground/Low line area Lead upto 5KM
6403.51
127
818368.58
... More
(b) O & M for 2nd year 137 MLD STP Kasna
1
76860
76860
... More
Carriage of Sludge, Grit, Floating particle from STP to Dumping Ground/Low line area Lead upto 5KM
8772.81
127
1121165.12
... More
Chlorine @ 5mg/l
219000
16
3545610
... More
A-Variable Cost for IVth Year
Dewatering polymer @ 1.2 kg/ton of dry Solids
10512
358
3769603.2
... More
(d) O & M for 4th year 137 MLD STP Kasna
1
76860
76860
... More
B-Fix Cost For Ist Year
Civil, E&M Maintenance Work
1
24604722
24604722.24
... More
Operation and maintenance of the various units of 137 mld stp plant based on sequential bach reactor (SBR) technology for 5 Years as a whole including supply of chemical and consumables disposal of plant residuals (eg. screening , grit, and dewatered sludge ) manpower required complete maintenance of civil structure preventive and complete maintenance of mechanical equipment, electrical item field instrument, Horticulture & Landscapping etc. cost of collection analysis reporting monitoring and maintaining.
-
-
-
... More
Civil, E&M, Rising Main upto STP Maintenance Work
1
2892810
2892810.02
... More
(e) O & M for 5th year 137 MLD STP Kasna
1
76860
76860
... More
Civil, E&M, Rising Main Maintenance Work
1
2892810
2892810.02
... More
Civil, E&M, Rising Main Maintenance Work
1
2892810
2892810.02
... More
Operation and maintenance of the various units of MPS Kasna and consumables disposal of plant residuals (eg. screening sludge ), manpower required as per CPHEEO Mannual, complete maintenance of civil structure preventive and complete maintenance of mechanical equipment, electrical item field instrument, Rising main line from mps to 137 mld stp, DG Sets, flow meter, Horticulture & Landscapping, Road etc. cost of collection analysis reporting monitoring and maintaining log book of pumps & record of outgoing sewage daily collected at least for twice time a day from the entry and exit of the MPS Units there on (Including Diesel & Consumable for Weekly trial of DG Set, Excluding power and diesel for DG Set to running Plant) Civil, E&M, Rising Main upto STP Maintenance Work
-
-
-
... More
Labour cess and GST will be paid extra as per Govt. orders.
-
-
-
... More
Supply Installation Testing Commissioning of Online open channel microprocessor based ultrasonic type Flow meter along with following features: 1) Type of Display: 2-Line LCD display with operational Key. 2) Transmeter type: Remote wall mounted with cable gland.3) Unit of display: Flow rate : m3/hr, Totalizer flow : m3 4) Accuracy: +/- 0.5% of measured value. 5) Power Supply: 0-50VAC,45-65Hz, optinal : 11-40VDC 6) Self diagnostic features 7) Transmitter enclosure material : Non-corrosive, Die cast aluminium/Polycarbonate 8) Memory: 100% secure data storage 9) Communication: Suitable for wired communication. 10) Protection class:IP67 including O & M for five year 137 MLD STP Kasna
2
262500
525000
... More
137 MLD STP O&M
Operation and maintenance of the various units of 137 mld stp plant based on sequential bach reactor (SBR) technology for 5 Years as a whole including supply of chemical and consumables disposal of plant residuals (eg. screening , grit, and dewatered sludge ) manpower required complete maintenance of civil structure preventive and complete maintenance of mechanical equipment, electrical item field instrument, Horticulture & Landscapping etc. cost of collection analysis reporting monitoring and maintaining.
-
-
-
... More
Operational Staff
1
2239285
2239285.71
... More
B-Fix Cost For Vth Year
Civil, E&M Maintenance Work
1
24604722
24604722.24
... More
Operation and maintenance of the various units of MPS Kasna and consumables disposal of plant residuals (eg. screening sludge ), manpower required as per CPHEEO Mannual, complete maintenance of civil structure preventive and complete maintenance of mechanical equipment, electrical item field instrument, Rising main line from mps to 137 mld stp, DG Sets, flow meter, Horticulture & Landscapping, Road etc. cost of collection analysis reporting monitoring and maintaining log book of pumps & record of outgoing sewage daily collected at least for twice time a day from the entry and exit of the MPS Units there on (Including Diesel & Consumable for Weekly trial of DG Set, Excluding power and diesel for DG Set to running Plant) Civil, E&M, Rising Main upto STP Maintenance Work
-
-
-
... More
Carriage of Sludge, Grit, Floating particle from STP to Dumping Ground/Low line area Lead upto 5KM
7684.21
127
982042.04
... More
OCEMS WORK
"Supply, Installation, Testing & Commissioning of Effluent Quality Monitoring System at Designated Location for Real Time based continuous measurement using chemical free common / separate sensors for following parameters within their specified measuring ranges. COD, BOD, TSS,Nitrate, Total Nitrogen Total Phosphorus, pH and temperature as per the attached Annexure ""A"". Complete all work, including one year Operation and Maintenance.Online Effluent monitoring data to be connect with servers of the concerned SPCB/PCC and CPCB in a time bound manner.
-
-
-
... More
MPS Kasna O&M
Operation and maintenance of the various units of MPS Kasna and consumables disposal of plant residuals (eg. screening sludge ), manpower required as per CPHEEO Mannual, complete maintenance of civil structure preventive and complete maintenance of mechanical equipment, electrical item field instrument, Rising main line from mps to 137 mld stp, DG Sets, flow meter, Horticulture & Landscapping, Road etc. cost of collection analysis reporting monitoring and maintaining log book of pumps & record of outgoing sewage daily collected at least for twice time a day from the entry and exit of the MPS Units there on (Including Diesel & Consumable for Weekly trial of DG Set, Excluding power and diesel for DG Set to running Plant)
-
-
-
... More
Operational Staff
1
2239285
2239285.71
... More
Operational Staff
1
2239285
2239285.71
... More
A-Variable Cost for IInd Year
Dewatering polymer @ 1.2 kg/ton of dry Solids
8760
358
3141336
... More
B-Fix Cost For IVth Year
Civil, E&M Maintenance Work
1
24604722
24604722.24
... More
Carriage of Sludge, Grit, Floating particle from STP to Dumping Ground/Low line area Lead upto 5KM
5763.16
127
736531.85
... More
Chlorine @ 5mg/l
250025
16
4047904.75
... More
A-Variable Cost for Ist Year
Dewatering polymer @ 1.2 kg/ton of dry Solids
7884
358
2827202.4
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements