Gorakhpur Industrial Development Authority Tender
... More
The Gorakhpur Industrial Development Authority has issued a formal invitation for competitive bids for Construction Of 60 Mtr Wide Road R4 Drain And Culvert Box Culvert In Sector 6a Industrial Area Dhuriyapar Gida Gorakhpur Lhs in Gorakhpur, Uttar Pradesh, with an estimated contract value of Rs. 6,28,56,761. The bid opening date for this tender is 27-10-2026 and the last date for bid submission is 17-11-2026. Interested bidders for Gorakhpur Industrial Development Authority tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Gorakhpur Industrial Development Authority Tender - UP Tender
Opening Date27 Oct 2026
Closing Soon17 Nov 2026
Tender Amount₹ 6,28,56,761
Costs
EMD
₹ 12,58,000Document Cost
₹ 2,650Tender Fee
Refer Documents
Description
Construction Of 60 Mtr Wide Road R4 Drain And Culvert Box Culvert In Sector 6a Industrial Area Dhuriyapar Gida Gorakhpur Lhs
AI Insights
Unlock AI Insights for this Tender
Sign in to request AI-powered insights, eligibility criteria and automated analysis for this tender.
Contact
Tender Id
2026_UGIDA_1201647_1Tender No
3865/GIDA/2026-27 DT. 14.10.2026Tender Authority
Gorakhpur Industrial Development Authority ViewPurchaser Address
-Website
https://bidplus.gem.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Morth Specification 4.10
1242.33
4615
5733352.95
... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.complete as per clause 406.
973.29
4819
4690284.51
... More
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.complete as per clause 502. Morth Specification 5.01
4736.55
40
189462
... More
Providing and laying dense graded bituminous macadam with 100 TPH HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification 5.04 clause No. 505
359.3
13197
4741682.1
... More
Providing and applying tack coat with bitumen VG 10 using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. MoRTH specification 5.02 clause No. 503
4901.75
13
63722.75
... More
Providing and laying bituminous concrete with 100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification 5.05 clause No. 507 complete in all respects.
195.68
14640
2864755.2
... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.compaction as per MoRTH specification 8.13 clause No. 803 complete in all respects.Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.compaction as per MoRTH specification 8.13 clause No. 803 complete in all respects.
197
618
121746
... More
S/F of Pavement Maker (Cat Eye) Type X-ASTMD-4956-04 Avery Dimenson/3-M (USA Make) consisting of ASA plastic housing fitted with tightly adherent plotting compound. The housing shall contain prismatic two glass covered prismatic reflective face to reflect incident light I/C all tax.
690
325
224250
... More
Drain & Culvert Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 m. & lead upto 30 m. Including filling watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth removal & disposal of surplus earth as directed by engineer in charge upto a distance of 30m from the foundation trenches. SOR SNO- 251
560.1
120
67212
... More
Cement concrete with 4 cm. (1½") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. (SOR SNO-280)
218.4
5960
1301664
... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. R.C.C. Grade M20 compaction as per SOR 287 complete in all respects.
1178.3
8720
10274776
... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks.
924.97
6124
5664516.28
... More
Box Culvert Work Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 m. & lead upto 30 m. Including filling watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth removal & disposal of surplus earth as directed by engineer in charge upto a distance of 30m from the foundation trenches. (Excluding Royality). SOR SNO- 251
1152.5
120
138300
... More
Cement concrete with 4 cm. (1½") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. (SOR SNO-280)
209.46
5960
1248381.6
... More
Brick masonary work in cement motar (in 1:3 cement and coarse sand) in foundation complete excluding pointing and plastering as per drawing and technical specification. (SOR ch.6-307)
164.34
5065
832382.1
... More
Sand Filling in foundation trench as per drawing and technical specification SOR 255
58.91
870
51251.7
... More
Providing Concrete for preinforced concrete M-25 in open foundations complete as per drawing and technical specification. MoRTH Clauses 12.08 E Case II.
106.03
9666
1024885.98
... More
Providing Concrete for preinforced concrete M-25 in open foundations complete as per drawing and technical specification. MoRTH Clauses 12.08 E Case II.
282.89
9666
2734414.74
... More
Providing Concrete for preinforced concrete M-25 in open foundations complete as per drawing and technical specification. MoRTH Clauses 12.08 E Case II.
128.85
9666
1245464.1
... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks.
690.97
6124
4231500.28
... More
Providing & laying cement Concrete wearing coarse M-30 grade including reinforcement complete as per drawing and technical specification. Morth Clauses 13.05 G
15.59
10271
160124.89
... More
Providing Weep holes in Brick masonary/plain/reinforced concrete abutment, wing wall return wall with 100 mm dia AC Pipe, extending through the full width of the structure with slope of 1V:20H towords drawing foce. Complete as per drawing and technical specification. MoRTH clauses 2706 & 2200
60
153
9180
... More
Back filling behind abutment, wing wall & return wall plinth complete as per drawing and technical specification MoRTH clause 710.1.4of IRC 78 & 2200
71.4
2503
178714.2
... More
Protection Work
Providing and laying Filter material underneath pitching in slope as per drawing and technical specification 16.05 2504
16.65
4889
81415
... More
Providing and laying Pitching Boulder on slopes laid over prepared filter media as per drawing and technicl specification 16.04 2504
33.3
4376
145753.43
... More
Earthwork in excavtion for structure as per drawing and technical specification Clause 305.1 including setting out construction of shoring and bracing removel of stump and construction of embankment with as per tecnical clause 11.1 300
22.2
120
2664
... More
Providing and laying stone Boulder in apron/Toe wall and packed and top finished to grade required including cost of all materials labour and T&P atc. Required for proper completion of the work.
147.6
4375
645778.04

