The Gorakhpur Industrial Development Authority has issued a formal invitation for competitive bids for Construction Of C.c. Road And Boundary Wall In Sub Station Campus Sector 13, Gida, Gorakhpur. in Gorakhpur, Uttar Pradesh, with an estimated contract value of Rs. 72,51,132. The bid opening date for this tender is 02-09-2023 and the last date for bid submission is 18-09-2023. Interested bidders for Gorakhpur Industrial Development Authority tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Gorakhpur Industrial Development Authority Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date2 Sep 2023
Closing Date18 Sep 2023
Tender Amount₹ 72,51,132
Costs
EMD
₹ 5,63,000Document Cost
₹ 2,950Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_UGIDA_834242_1Bid Award Id
ViewTender No
2236/ABHI.NI.6/CIVIL/2023-24 DT. 25.08.2023Tender Authority
Gorakhpur Industrial Development Authority ViewPurchaser Address
-Website
http://bidplus.gem.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Mild steel or iron work in plain work such as reinforced cement concrete (when not included in over all rate) wrought to required shape as necessary including bending for proper completion of work, supply of steel, all labour etc. required and including wastage bend, hooks and authorised over lapping shall be measured. As per s.i.no. 504
133.86
644535
4815
... More
C.C Road
Clearing jungle including uprooting of rank vegetation grass, bush, wood, trees and saplings of girth up to 30cm., Measured at a height of 1 m. above ground level & removal of rubbish upto a distance of 50m. Outside the periphery of area cleared.
4772
14316
3
... More
Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 m. & lead upto 30 m. Including filling watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth removal & disposal of surplus earth as directed by engineer in charge upto a distance of 30m from the foundation trenches. (Excluding Royality). SOR SNO- 251
46.2
5544
120
... More
12 mm thick plaster with cement mortar inproportion of 1:4 cement and C/sand over brick work minium thickness not be less than 10 mm including supply of all materials, labour and T&P etc. required for proper, comletion of work. As per 584A+596
202.95
30239
149
... More
Fabrication supply and fixing of M.S.Angle iron (40x40x5mm) in chaukhats for door, windows and ventilators including using m.s.flat iron etc. and 3 mm thick gusset plates at corners and junctions including supply of steel cutting, drilling holes bending, moulding requried shap and welding, supply and fixing of necessary h.ings for doors 125mm of 14 gauge size, window and ventilator 100mm, 16mm gauge size, with cleats and stoppers etc. and 10 mm dia bottom tie rod etc. complete. 502(B)
1507.23
85912
57
... More
R.C.C.Work with cement approved coarse sand and 2cm gauge stone girt (Dala) in the propotion of 1:1.5:3 (M-20) in Column Footing excluding supply of reinforcement and its bending but including fixing and bending the same with 24 B.W.G.G.I. banding wire and including necessary centering and shuttring etc.& also including supply of all materilas, labour and T&P etc. required for proper completion of work.As per S.I.No.287
15.99
114968
7190
... More
Concrete with 40mm gauge Stone ballast, Coarse sand in 8:4:1 in foundation including supply of all materials labour and tools and plants etc. required for proper completion of work. 281
16.58
90112
5435
... More
Supply and filling of carted earth from a distance not exceeding 7 KM from the site of work and including cost of earth and all materials, labour T & P etc. Earth work in cutting or embankment in ordinary soil, excavation to be in the form of regular pits not exceeding 0.50mtr. in depth and earth work in embankment & subgrade and earthen shoulders to be in 20cm Layers, including ramming and dressing the surface to required levels and slops and also including 1.5 meter lift and 30 meter lead. (Good Earth brought from out side away from GIDA notified area) MORTH Srno. 3.16 Specification 305.
2867.9
909124
317
... More
Apply priming coat over new steel and other metal surface after and including preparing the surface throughly cleaning oil grease dirt and other foreign matter and scoured with wire brushes, fine steel/wood scrappers sand papering and knotting including cost of all materials, labour and T&P etc. required for proper completion of the work. S.I.No-1 Chapter 15 New Item
25.36
481
19
... More
Finising walls with water proof cement paint of approved make and on new work with 3 coat to give an even shade including supply of all materials labour and tools and plants etc. required for proper completon of the work. (S.I. No. 660 + 661)
1204.98
75913
63
... More
Cement concrete with 2 cm. gauge approved stone, ballast, approved coarse sand and cement in the proportion of 1:1.5:3 including supply of all materials, labour and T&P etc. required for proper completion of the work.
2.53
19000
7510
... More
M-150 class brick work in 1:4 and C/sand mortar in super structure including necessary cutting and moulding of bricks rquired and also including honeycomb brick work, supply of all material labour and tools and plants etc. required for proper completion of work but thickness of wall is one brick (230 mm) 305+309+310
105.05
529977
5045
... More
Painting two coat over priming coat (but excluding cost of priming cost) on wood or steel and other metal surface with superior synthetic enamel standard make brusing to give an even shade and finish and including cleaning the surface of all dirt dust and other foreign matter and papering and stripping including cost of all material, labour, T&P etc. required for the proper completion of the work. but for every subsequent coat after first coat on wood or steel surface with paint of (iii) Superior quality.S.I.No-2+4(III) Chapter 15 New Item
25.16
1258
50
... More
Plain Cement concrete with 4 cm. (1½") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. (SOR SNO-280)
123.2
734272
5960
... More
Total
-
7251132
-
... More
Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. R.C.C. Grade M20 compaction as per MoRTH specification clause No. Case II 12.08 complete in all respects.
220
2077460
9443
... More
R.C.C. Work with cement approved coarse sand and 20 mm gauge (nomianl size) dalla stone aggregate in the proporation of 1:1.5:3 M-20 in R.C.C. Plinth Beam excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B W.G.G.I. binding wire and as required supply of all materials, labour centering and shuttering and removal of the same after completion of work. S.I.No. 283A
19.02
150448
7910
... More
R.C.C. Work with cement approved coarse sand and 20 mm gauge (nomianl size) dalla stone aggregate in the proporation of 1:1.5:3 M-20 in R.C.C. Column excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B W.G.G.I. binding wire and as required supply of all materials, labour centering and shuttering and removal of the same after completion of work. S.I.No. 289
61.39
586888
9560