Gorakhpur Development Authority Tender
... More
The GDA has issued a formal invitation for competitive bids for the Gorakhpur Development Authority project, for Construction Work Of Rcc Drain And Road From Sangam Square Laxmipur Road In Ward No. 35 Jungle Salik Village To Virendra Gupta House Via Udaybhan Pandey Vp Tiwari House In Manas Vihar Colony Lane No. 2c. in Gorakhpur, Uttar Pradesh, with an estimated contract value of Rs. 65,53,948. The bid opening date for this tender is 10-02-2024 and the last date for bid submission is 20-02-2024. Interested bidders for Gorakhpur Development Authority tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Gorakhpur Development Authority - GDA Tender
Opening Date10 Feb 2024
Closing Date20 Feb 2024
Tender Amount₹ 65,53,948
Costs
EMD
₹ 3,28,000Document Cost
₹ 1,770Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_GORDA_893793_5Bid Award Id
ViewTender No
41/GDA/2023-24/30012024Tender Authority
Gorakhpur Development Authority ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
P/L of factory made 80mm thick rubber moulded interlocking C.C. paver block (30Mdia) including 25mm thick complete bed of fine sand etc complete. (PWD SOR- New Item/19)
1200
972000
810
... More
R.C.C. work with cement approved coarse sand and 2.0cm (3/4") gauge approved stone grit in the proportion of 1:1½:3 in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and biding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all material, labour and T&P etc. required for proper completion of the work. binding wire cost being included in the item. (S.I.No-284A)
16
140800
8800
... More
Concrete with 4.00cm (1½") gauge approved stone ballast, approved coarse sand and cement in the proportion of 8:4:1 including supply of materials, labour T&P etc. required for the proper completion of the work. (S.I.NO-281)
45
244575
5435
... More
Mild steel or iron work in plain work such as in reinforced concrete or reinforced brick work (when not included in over all r ates) wrought to required shapes as necessary and bending for the proper completion of the work and including supply of steel and its wastage etc. and all labour and plants required for proper completion of work note: the steel shall be bent cold and all bends hooks and authorised over lapping shall be measured. (SOR No-504) Analysis Rate)
13
99060
7620
... More
S/F of PVC pipe 160mm/Kg pressure. (SOR 2020/SI No-Mat/30)
35
17325
495
... More
Centering and shuttering including strutting, propping etc. and removal of form for undations, footings, bases of columns, etc. for mass concrete. (D.S.R. No-5.9.1)
1080
294300
272.5
... More
Earth work in filling in embankment up to 8 Km distance. (A.R.)
60
12540
209
... More
Mild steel or iron work in plain work such as in reinforced concrete or reinforced brick work (when not included in over all r ates) wrought to required shapes as necessary and bending for the proper completion of the work and including supply of steel and its wastage etc. and all labour and plants required for proper completion of work note: the steel shall be bent cold and all bends hooks and authorised over lapping shall be measured. (SOR No-504) Analysis Rate)
94
716280
7620
... More
Supply fixing and left on expension joint required commercial ply of 6mm (Approved Rate)
49
28420
580
... More
Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5m. & lead upto 30m. Including filling , watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30m from the foundation trenches. (Excluding Royalty) (S.I.No-251)
324
38880
120
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements