Gorakhpur Development Authority Tender
... More
The GDA has issued a formal invitation for competitive bids for the Gorakhpur Development Authority project, for Construction Work Of Rcc Drain And Road In Dhobi Gali And Surrounding Streets Via Mahendra Gas Godown In Ward No. 67 Mohaddipur. in Gorakhpur, Uttar Pradesh, with an estimated contract value of Rs. 41,89,038. The bid opening date for this tender is 10-02-2024 and the last date for bid submission is 20-02-2024. Interested bidders for Gorakhpur Development Authority tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Gorakhpur Development Authority - GDA Tender
Opening Date10 Feb 2024
Closing Date20 Feb 2024
Tender Amount₹ 41,89,038
Costs
EMD
₹ 2,09,500Document Cost
₹ 1,770Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_GORDA_893793_12Bid Award Id
ViewTender No
41/GDA/2023-24/30012024Tender Authority
Gorakhpur Development Authority ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Centering and shuttering including strutting, propping etc. and removal of form for undations, footings, bases of columns, etc. for mass concrete. (D.S.R. No-5.9.1)
1179
321277
272.5
... More
Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5m. & lead upto 30m. Including filling , watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30m from the foundation trenches. (Excluding Royalty) (S.I.No-251)
300
36000
120
... More
Mild steel or iron work in plain work such as in reinforced concrete or reinforced brick work (when not included in over all r ates) wrought to required shapes as necessary and bending for the proper completion of the work and including supply of steel and its wastage etc. and all labour and plants required for proper completion of work note: the steel shall be bent cold and all bends hooks and authorised over lapping shall be measured. (SOR No-504) Analysis Rate)
26
198120
7620
... More
R.C.C. work with cement approved coarse sand and 2.0cm (3/4") gauge approved stone grit in the proportion of 1:1½:3 in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and biding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all material, labour and T&P etc. required for proper completion of the work. binding wire cost being included in the item. (S.I.No-284A)
33
290400
8800
... More
S/F of PVC pipe 160mm/Kg pressure. (SOR 2020/SI No-Mat/30)
70
34650
495
... More
Mild steel or iron work in plain work such as in reinforced concrete or reinforced brick work (when not included in over all r ates) wrought to required shapes as necessary and bending for the proper completion of the work and including supply of steel and its wastage etc. and all labour and plants required for proper completion of work note: the steel shall be bent cold and all bends hooks and authorised over lapping shall be measured. (SOR No-504) Analysis Rate)
68
518160
7620
... More
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
75
311925
4159
... More
Providing and laying design mix cement concrete of M-30 grade, in roads/ taxi tracks/ runways, using cement content as per design mix, using coarse sand and graded stone aggregate of 40 mm nominal size in appropriate proportions as per approved & specified design criteria, providing dowel bars with sleeve/ tie bars wherever required, laying at site, spreading and compacting mechanically by using needle and surface vibrators, levelling to required slope/ camber,finishing with required texture, including steel form work with sturdy M.S. channel sections, curing, making provision for contraction/ expansion, construction & longitudinal joints (10 mm wide x 50 mm deep) by groove cutting machine, providing and filling joints with approved joint filler and sealants, complete all as per direction of Engineer-in-charge (Item of joint fillers, sealants, dowel bars with sleeve/ tie bars to be paid separately).Cement concrete prepared with batch mixing machine (D.S.R. No-16.43.1)
171
1436528
8400.75
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements