The GDA has issued a formal invitation for competitive bids for the Ghaziabad Development Authority project, for Construction Of Raods At Madhuban Bapudham Pocket-a (part-i) in Ghaziabad, Uttar Pradesh, with an estimated contract value of Rs. 2,92,44,515. The bid opening date for this tender is 03-03-2020 and the last date for bid submission is 11-03-2020. Interested bidders for Ghaziabad Development Authority tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Ghaziabad Development Authority - GDA Tender
Road Construction
Eprocure
Opening Date3 Mar 2020
Closing Date11 Mar 2020
Tender Amount₹ 2,92,44,515
Costs
EMD
₹ 5,85,000Document Cost
₹ 11,800Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_GDAUP_442180_1Bid Award Id
ViewTender No
492/4/PA-T/2019-20 Dt. 27.02.2020 (S.no-5)Tender Authority
Ghaziabad Development Authority ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Construction of Raods at Madhuban Bapudham Pocket-A (Part-I)
BOQ Items
... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.(Morth 406)
2355
-
3583
... More
Earth work in cutting or in embankment in ordinary soil excavation to be in the from of regular pits not exceeding 0.50M. in depth and earth work in embankemnt to be in 20cm. layers including remmeing and dressing the surface to required levels and slopes and also including 1.50M lift and 30M. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with in 30M. distances as directed by the Engineer incharge. Excluding Royality. SI. 253(a)/SOR 19
2086
-
90
... More
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with at site, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 MORTH all complete of the work (Sanction Rate)
3462
-
3278
... More
Brick edeging on both side of the road of M-150 bricks 7 cm wide , 11 cm deep laid with mud mortar including dressing ,supply of brick finished to the required temlete and in proper alignment and also including dressing and ramming the excaveted earth as directed by E/I. . SI- 765/SOR 19
3.24
-
58500
... More
Providing and laying Compact bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 MT per hour using crushed aggregates of specified grading, premixed with 60/70 (VG-30) bituminous binder @ 5.00 per cent by weight of total mix and Hydragted lime @ 2.00 percent by weight of total mix, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. (Sanction Rate)