Ghaziabad Development Authority Tender

... More
The GDA has issued a formal invitation for competitive bids for the Ghaziabad Development Authority project, for Bequtification Of Green Belt Of C-block Of Madhuban-bapudham Yojna, Planting Of 379 Saplings, Installation Of Submersible Tubewell And Water Line For Grass Irrigation And Barbed Wire Fencing With Rcc Poles For Security. in Ghaziabad, Uttar Pradesh, with an estimated contract value of Rs. 4,53,972. The bid opening date for this tender is 07-04-2025 and the last date for bid submission is 28-04-2025. Interested bidders for Ghaziabad Development Authority tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Ghaziabad Development Authority - GDA Tender

Works
Civil And Construction
Irrigation Work
Agriculture or Forestry Works
Eprocure
Opening Date7 Apr 2025
Closing Date28 Apr 2025
Tender Amount₹ 4,53,972 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Bequtification of green belt of C-block of Madhuban-Bapudham yojna, planting of 379 saplings, installation of submersible tubewell and water line for grass irrigation and barbed wire fencing with RCC poles for security.
Bequtification of green belt of C-block of Madhuban-Bapudham yojna, planting of 379 saplings, installation of submersible tubewell and water line for grass irrigation and barbed wire fencing with RCC poles for security.
Bequtification of green belt of C-block of Madhuban-Bapudham yojna, planting of 379 saplings, installation of submersible tubewell and water line for grass irrigation and barbed wire fencing with RCC poles for security.
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Fencing with R.C.C. Post placed required ………………… barbed wire used. DSR 16.17.1/2023 (14.00x0.735=10.29x111/107 = 10.67)

1260

10

13444.2

... More
Grouting of pole Cement concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 1:2:4 including supply of all materials, labour, tools & plants etc. required for proper completion of the work. DSR 4.1.3/2023 (L= 0.45x B=0.45xH=0.50 =0.10 x 100 = 10.00) (7878.50x0.735 = 5790.70x111/107 = 6007.17)

10

6007

60071.7

... More
Supply of 3 phase 4 mm I.S.I. mark flate cable

80

72

5760

... More
Supply of 2 inch nipal 50 mm Q.

1

185

185

... More
Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20%: 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately): Holes 60 cm dia and 60 cm dep. 2.14.3/D.S.R. 2020 (43.75x0.90=39.375x111/100 = 43.70)

144

43

6292.8

... More
Rough dressing the trenching ground including breaking colds. 2.5/D.S.R. 2020 (1.50x0.90 = 1.35x111/100 =1.49)

2700

1

4023

... More
Providing & fixing G. I. fitting set Accessories with get wall connection with motor pump.

2

4180

8360

... More
Providing and stacking of Phyllanthus emblica (Amla) of height 150-165 cm. in Big HDPE Bag as per direction of the officer-in-charge. 7.64/D.S.R. 2020

72

90

6480

... More
Providing and fixing 2 inch boll Valve P.P.

2

1520

3040

... More
Supply of 110 mm Q 6 kg/sqm I.S.I. mark P.V.C. pipe including all taxes carteg. up to side including cord cape.

80

223

17892.8

... More
Supplying and laying of following size DWC HDPE pipe ISI marked along with all accessories like socket, bend, couplers etc. conforming to IS 14930, Part II complete with fitting and cutting, jointing etc. direct in ground (75 cm below ground level) including excavation and refilling the trench but exculding sand cushioning and protective covering etc.complete as required. 14.16.1/DSR 63 mm dia (OD-63mm & ID-51 mm nominal)

300

178

53400

... More
Supplying & Stacking of Selection No.1 doob grass turf at site fresh & free from weeds having proper roots in green including loading, unloading, carriage and all taxes paid etc.and as per direction of officer in charge2.35/DSR 2020 (50.80x0.90=45.72x111/100 = 50.75)

480

50

24360

... More
Synthetic paint asian/Berger of other equlat synthetic paint on the R.C.C. Pole in two coats. 641+642 SOR 2022 (Rs. 80+35= Rs. 115.00)

42.8

115

4922

... More
Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20%: 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately): Holes 45 cm dia and 45 cm dep. 2.14.4/D.S.R. 2020 (18.70x0.90=16.83x111/100 = 18.68)

235

18

4389.8

... More
Supply of filter cloth

1

850

850

... More
Supplying and stacking of well decayed cattle manure at site including royalty and carriage upto 5 km lead complete (Cattle manure measured in stacking will be reduced by 8% for payment). 2.25/D.S.R. 2020 (247.50x0.90=222.75x111/100 = 247.75)

67.5

247

16723.13

... More
Anti termite treatment of lawn area through premise 30.50% I P. one liter premise diluted in 499 liters water and applying solution @ 1.00 litre solution per sqm lawn or bed area.(two application) i/c cost of chemical)and as per direction of officer-in-charge. 2.56/DSR 2020 (7.55x0.90=6.795x111/100 = 7.54)

2700

7

20358

... More
Supply of Starter with overload reley I.S.I. mark Crompton.

1

7372

7372

... More
Excavating holes upto 0.10 cum, including getting out the excavated soil, then returning the soil as deported in layers not exceeding 20 cm in depth, including consolidating and deposited layer by ramming watering etc., disposing of surplus excavated soil as directed with in a lead of 50 mm and lift upto 1.5 m. All kind of soil DSR16.66.1/2023 (L= 0.45x B=0.45xH=0.50) (27.50x0.735=20.21x111/107 = 20.96)

100

20

2096

... More
Hand Boring with 150 mm Q Buro hole by casing pipe method in ordinary soil including correction................ leveling of side complete.

80

243

19440

... More
Supply of Karonda height 2’ to 2.5’ in ploy begs.

235

20

4700

... More
Supply of 2 inch albow.

1

220

220

... More
Providing & fixing 1 inch Double acting Aluminum Q.R.C. with Accessories

10

945

9450

... More
Supply of Citrus sps (Nimboo, Grape fruit and sweet orange) height 4’ to 5’ well developed in ploy begs.

72

80

5760

... More
Supply of Solvent/Sutli

1

245

245

... More
Surface dressing of the ground including removing vegetation in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50m and lift upto 1.5m: 2.28.1 All kinds of soil. DSR 2020 (23.80x0.90=21.42x111/100 = 23.77)

2700

23

64179

... More
Plantation of Trees, Shrubs, and Hedge at site i/c watering and removal of unsaverieable material’s as per direction of officer in charge (excluding cost of plant & water) 2.57.1/2020 Cost of plantation per Trees (7.30x0.90=6.57x111/100 = 7.29)

144

7

1049.76

... More
Providing & fixing self closing Q.R.C. key complete.

4

166

665

... More
Fine dressing the grounding. 2.7/D.S.R. 2020 (3.70x0.90=3.11x111/100 = 3.69)

2400

3

8856



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.