GAIL India Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

GAIL India Limited - GAIL Tender

Goods
Energy, Oil and Gas
Eprocure
Opening Date7 Oct 2024
Closing Date28 Oct 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
INSTALLATION, COMMISSIONING, TESTING ETC

-

-

-

... More
Installation, commissioning & Field performance test of Compressor Package including air compressor system at different sites.

35

-

-

... More
Per DIEM rate towards Extra visits to various Geographical Areas (GAs). Rate to be inclusive of expenses towards boarding, lodging, travel, tools & tackles etc. Note: 1) Bidder to note that "Extra Visit" charges shall be payable only against visits made at sites at various GAs due to reasons directly attributable to the owner such as non-availability of Gas, infrastructure or any other reason which is not-attributable to the bidder. 2) No. of days considered for payment against this item shall be no. of days spent at site(s), as certified by Engineer-in-charge/ site-in-charge. The same shall be payed on actual basis.

40

-

-

... More
Lump sum Annual operation, repair & comprehensive maintenance etc. [Bidder to quote Percentage Rate for the following] (Note: Bidder to enter percentage rate in numbers. For Example, if bidder wants to quote 26% then enter 26.00, if bidder wants to quote 27.85% then enter 27.85 etc. Total Value will be automatcially calculated based on the same)

-

-

-

... More
Lump sum Annual operation, repair & comprehensive maintenance charges per Booster Compressor Package including air compressor for 1st year warrantee period inclusive of all manpower, spare parts, lubricants etc. Note: The quoted percentage(%) rate for this item must be equal to or more than 25% of unit price of Item no. A.1.1 quoted by the bidder. Bidder quotting less than the specified minimum percentage, shall be rejected.

35

-

-

... More
Lump sum annual operation, repair & comprehensive maintenance charges per Booster Compressor Package including air compressor for second year i.e. after first year of warranty period inclusive of all manpower, spare parts, lubricants etc. Note: The quoted percentage(%) rate for this item must be equal to or more than 27.5% of unit price of Item no.A. 1.1 quoted by the bidder. Bidder quotting less than the specified minimum percentage, shall be rejected.

35

-

-

... More
Lump sum annual operation, repair & comprehensive maintenance charges per Booster Compressor Package including air compressor for third year i.e. after second year of AMC inclusive of all manpower, spare parts, lubricants etc. Note: The quoted percentage(%) rate for this item must be equal to or more than 30.25% of unit price of Item no. A.1.1 quoted by the bidder.Bidder quotting less than the specified minimum percentage, shall be rejected.

35

-

-

... More
Lump sum annual operation, repair & comprehensive maintenance charges per Booster Compressor Package including air compressor for fourth year i.e. after third year of AMC inclusive of all manpower, spare parts, lubricants etc. Note: The quoted percentage(%) rate for this item must be equal to or more than 33.3% of unit price of Item no. A.1.1 quoted by the bidder.Bidder quotting less than the specified minimum percentage, shall be rejected.

35

-

-

... More
Note: The rate mentioned for items in Sl. No. 8 to 11 shall be for a 3-shift per day duty. If, in any case, the EIC decides to operate the annual operation in 2 shifts per day as per site conditions, the billed amount shall be charged on a pro-rata basis. Pro- rata basis shall be calculated for each compressor package= (((Quoted price/365**) / 3***) X Actual no. of shifts per month)

-

-

-

... More
Notes: i) Refer MR (Material Requisition), Vol. II for location-wise tentative break-up of Qty. & other details. The location wise quantities may vary considering project requirement. Actual delivery location will be mentioned at the time of the released order/P.O. ii) Considering large size of GA's involving multiple districts/cities in each GA, as per requirement, supplies shall be made to designated sites/ stores which may be located anywhere within the GA. Exact location of stores shall be intimated prior to dispatch of material. iii)Operations & Annual comprehensive Maintenance etc. shall be extendable for another 1 years as per owner’s requirement (at sole discretion of Owner) at the rates as quoted by the bidder for fourth year operations & Annual comprehensive Maintenance inclusive of all manpower, spare parts charges (Item no. A.3.4). iv) Bidders are required to quote charges for item nos. A. 3.1 to A.3.4 of MR will be equal or more based on item-wise percentages specified above. v) ** refers to 365 days in a year & *** refers to 3 no. of shifts. vi) GA wise locations tentative quantity are as Varanasi- 07 Nos, Patna-10 Nos, Ranchi-06 nos, Jamshedpur-04 Nos, Cuttack-02 Nos, and Bhubaneswar-06 nos.

-

-

-

... More
Total amount excluding GST

-

-

-

... More
GST (CGST&SGST/UTGST or IGST) in percentage (%) on Net Total Amount

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.