GAIL Gas Limited Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
GAIL Gas Limited Tender
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date7 Mar 2025
Closing Date2 Apr 2025
Tender AmountRefer Documents
Costs
EMD
₹ 26,60,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_GAILG_228044_1Bid Award Id
ViewTender No
GAIL GAS/NOIDA/5674/2024-25/101Tender Authority
GAIL Gas Limited ViewPurchaser Address
-Website
http://etenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Atterberg's Limit (Liquid Limit & Plastic Limit)
20
-
-
... More
Direct Shear Test
20
-
-
... More
Ground Water level
20
-
-
... More
Number of permissions shall be considered based on number of Applications made to various authorities. Application shall be put up as per Approval of owner's representative.
-
-
-
... More
Conducting the following laboratory tests as specified as decided by EIC in NABL accredated labarotary
-
-
-
... More
PERMISSIONS
-
-
-
... More
GEOTECHNICAL INVESTIGATION IN RIVERS
-
-
-
... More
1. Survey for individual river / water body crossing would be carried out and drawings for each crossing shall be submitted on separate sheets.
-
-
-
... More
Soil Stratification along Pipe Route Carrying out Soil Startification work along the pipeline route as per specification including and providing all men, tools, tackles, materials, testing equipment and other equipment other support facilities including mobilization and demobilization etc as per tender document, The boring shall be either terminated at a depth of 3 M below NGL or on top of bed rock if rock is encountered at a depth of less than 3 M. and Boreholes shall be made at intervals of 500 M along the pipeline route, at all intermediate points where there is apparently a change in the type of soil and at any other place as directed by direction of Engineer-in-Charge.
120
-
-
... More
CORROSION SURVEY
-
-
-
... More
In Major water bodies for carrying out Hydrographic survey and Geotechnical Investigations
15
-
-
... More
Crossing Survey (To carry out a detailed survey covering a proposed crossing for Gas Pipeline using survey instruments and giving Planimetry and ground profile (Section) details and levels at 5m interval as per technical specification, tender document and direction of EIC ) Through a large carriageway, water body, railways, flyover /over bridge, subways, and similar obstructions - covering at least a width of
35 m on either side of proposed crossing including marking of Crossing drwings required for obtaining crossing permissions, all complete as per specifications and the direction of Engineer-in-charge.
20
-
-
... More
On River/ Water Bodies Bank
110
-
-
... More
Social Forest
15
-
-
... More
Nallah/ Drain
5
-
-
... More
Detailed Grid Line Survey Carrying out detailed survey along existing gas pipeline routes for a width of 30m on either side as per specifications and tender document, approved route and submit all Reports and drawingsalong with original editableCAD outputincluding all data.
90
-
-
... More
District/ Gram Panchayat Roads
15
-
-
... More
Nagar Palika/ Municipal Corporation
69
-
-
... More
Collecting 100 mm dia undisturbed sample form boreholes as specified as decided by EIC.
35
-
-
... More
State PWD
8
-
-
... More
Chemical Analysis of Soil & Sub-soil water- pH, Chloride & Sulphate
20
-
-
... More
Carrying out complete Geotechnical Investigation for the depth specified or as per Engineer-In-Charge in Receiving Terminal/SV Station /IP Station/ Despatch Station or as per direction of Engineer-In- Charge as enlisted in the tender in scope of work including providing borehole location coordinates, manpower, tools, tackles, materials, survey equipments, drilling rigs, soil testing equipment, other equipments, other support facilities necessary for the survey and associated work and submitting Final Geotechnical Report (along with the soft copy) incorporating all field and laboratory data and recommending the type of foundation and the safe bearing pressure for the proposed sites, Drawings, Data etc. (One Lot) in an approved format drawings, approved QAP, implementation schedule and other provisions of the Tender Document and instructions of the Engineer-in-charge.
-
-
-
... More
Ground Penetration Radar (GPR) Survey.
-
-
-
... More
River/ Water Body Crossing
5
-
-
... More
Nagar Palika/ Municipal Corporation
13
-
-
... More
CROSSING PERMISSIONS
-
-
-
... More
Social Forest
10
-
-
... More
ROUTE SURVEY FOR STEEL PIPELINE
-
-
-
... More
Natural Moisture Content
20
-
-
... More
Railways
10
-
-
... More
Ground Water level
25
-
-
... More
Collecting Disturbed samples from Bore Holes
35
-
-
... More
Protected Reserved Forest
35
-
-
... More
MOBILIZATION & DEMOBILIZATION
-
-
-
... More
3. Actual bank to bank width of rivers may change depending on the crossing locations at the time of survey.
-
-
-
... More
Area Survey for MDPE Network To carryout Area survey and propose a feasible route for laying the proposed pipeline network and to identify and record all the features of the area surveyed along with building, structures, drains pavements, roads etc. and including those likely to have bearing on alignment of proposed pipeline and to propose a pipeline route with respect to plot boundary giving offset from the nearest boundary which will have least obstruction, marking obstruction, if any, identify the type of building type of road back lanes required to be cut to lay the pipelines, all the field data to be collected, superimposing the same on digitized satellite high resolution image (as mentioned in item no. K ) and developing the drawings / maps in scale 1:250 with full details marked, check and confirm completeness of data all complete as per specifications drawings and direction of the engineer-in-charge and giving drawings in 4 copies along with original editable CAD output including all data.
225
-
-
... More
Direct Shear Test
25
-
-
... More
Detailed Grid Line Survey Carrying out detailed survey along proposed gas pipeline routes for a width of 30m on either side as per specifications and tender document, approved route and submit all Reports and drawingsalong with original editableCAD outputincluding all data.
90
-
-
... More
Specific gravity and Void ratio
25
-
-
... More
Laboratory test on rock sample as specified/ as decided by EIC
-
-
-
... More
Collecting 100 mm dia undisturbed sample form boreholes as specified as decided by EIC.
20
-
-
... More
Factory License for COCO CNG/LNG/LCNG Stations.
17
-
-
... More
Core Recovery (RQD)
15
-
-
... More
Point Load Test
15
-
-
... More
Carrying out complete Geotechnical Investigation for the depth specified against each crossing as specified or as per Engineer-In-Charge at various major/minor water bodies crossing sites as enlisted in the tender in scope of work including providing borehole location coordinates, manpower, tools, tackles, materials, survey boats, echo-sounder, drilling rigs, soil testing equipment, other equipment, other support facilities necessary for the survey and associated work and submitting Final Geotechnical Report (along with soft copy) incorporating all field and laboratory data, Drawings, Maps, Data etc. (One Lot) in an approved format with full scale for Soil Investigation, Scour Depth etc. (including Hydrologicalstudies as per Technical Specification) in accordance with the Technical Specification, Drawings, approved QAP, implementation schedule and other provisions of the Tender Document and instructions of the Engineer-in-charge.
-
-
-
... More
National Highway
10
-
-
... More
Chemical Analysis of Soil & Sub-soil water- pH, Chloride & Sulphate
25
-
-
... More
State Highway
6
-
-
... More
AREA SURVEY
-
-
-
... More
Note:-
-
-
-
... More
Survey of pipe line and Area
-
-
-
... More
Natural Moisture Content
25
-
-
... More
Conducting the following laboratory tests as specified as decided by EIC in NABL accredated labarotary
-
-
-
... More
2. The numbers of Boreholes as well as depth may vary depending on site condition / direction of Engineering - In-charge. The depth of Borehole inside water bodies shall be from the bed level.
-
-
-
... More
Field Investigations
-
-
-
... More
State Highway
90
-
-
... More
Protected Reserved Forest
5
-
-
... More
Grain Size Analysis and IS Classification
25
-
-
... More
Preliminary route survey (Reconnaissance Survey): Carrying out reconnaissance survey as per Specification/Scope of work in the tender and instructions of Engineer-in-Charge and submissin of four coloured drawings and report.
90
-
-
... More
Bulk and Dry Density
20
-
-
... More
PIPELINE LAYING
-
-
-
... More
Statutory Clearance for PESO approval to set-up and operate DCU/LCNG Station/COCO CNG Station/Steel Pipeline.
18
-
-
... More
TOPOGRAPHICAL SURVEY
-
-
-
... More
Bulk and Dry Density
25
-
-
... More
National Highway
50
-
-
... More
In Plots / terminals for carrying Topgraphic survey & Geo technical investigations
15
-
-
... More
CROSSING SURVEY
-
-
-
... More
District/ Gram Panchayat Roads
70
-
-
... More
NOTE: Above Pipeline Laying Includes Multiple Crossing in Particular Line segment. However, standalone crossing permissions should be processed with a separate SOR.
-
-
-
... More
Note :-
-
-
-
... More
In River / Water Bodies Bed including making necessary arrangement for supplying floating plate form, boring / drilling/ other associated equipment & shifting etc all complete.
110
-
-
... More
By Boring of minimum 150 mm dia boreholes as specified in specific requirement through all kinds of soil excluding hard rock
-
-
-
... More
Mobilization and demobilization and relocation of equipments, necessary plant and personnel at the test stations on land and in water for carrying out complete Geotechnical, Topographical & Hydrological
Investigation as described in specification for various plots / terminals and for rivers/water bodies crossing sites as enlisted in the tender and listed out in details in scope of work.
-
-
-
... More
Grain Size Analysis and IS Classification
20
-
-
... More
On River/ Water Bodies Bank
70
-
-
... More
To carry out detailed Topographic Survey at different locations of Plots/Area of SV Station/CNG Stations etc. along with survey of the approaches of these stations from the nearest roads using survey instruments and giving complete details in the form of drawings (in the scale of 1:100) and reports in 4 copies on white paper sheets and editable CAD output on CD/DVD all complete as per specifications, drawings and direction of the Engineer-in-charge.
1500
-
-
... More
State PWD
70
-
-
... More
Local Development Authority
20
-
-
... More
Collecting Disturbed samples from Bore Holes
20
-
-
... More
Drilling through rock/boulder strata (where SPT value is greater than 100) with minimum Nx size bit as per instruction of Engineer-in-charge.
-
-
-
... More
Conducting Standard Penetration Tests in Boreholes as specified as decided by EIC.
20
-
-
... More
Atterberg's Limit (Liquid Limit & Plastic Limit)
25
-
-
... More
SARAIKELA-KHARSAWAN/ WEST SINGHBHUM and GIRIDIH-DHANBAD
-
-
-
... More
Field Investigations
-
-
-
... More
Carrying out subsurface utility survey along the proposed pipeline route and/or as specified by Eingineer -In-Charge for 5 m corridor using Ground Penetrating Radar (GPR) for depth upto 5 m below the existing ground level to locate and identify all existing underground utilities /buried objects including but not limited to pipelines , sewers, conduits, cables, drain, manholes , appurtenances etc in the proposed corridor along with location ,DGPS coordinates,depth,shape and dimensional detals of utilities . Four (4) copies of report and drawing incorporating all collected datas shall be submitted as per scope of work and direction of Engineer-in-charge .Scale of drawing shall be Planimetry (X axis 1:1000,Y axis 1:100),Longitudnal Section (Z axis 1:100) and Transverse section at critical location.
60
-
-
... More
Local Development Authority
10
-
-
... More
In River / Water bodies bed including making necessary arrangement for supplying floating plate form, boring / drilling/ other associated equipment & shifting etc all complete. Note: Measurement should be for actual depth from bed level.
100
-
-
... More
GEOTECHNICAL INVESTIGATION IN PLOTS
-
-
-
... More
Conducting Standard Penetration Tests in Boreholes as specified as decided by EIC.
35
-
-
... More
By Boring of minimum 150 mm dia boreholes upto a max. depth as specified or refusal strata (REFUSAL means when N 100 for 30 cms of penetration) in all type of soil.
100
-
-
... More
Specific gravity and Void ratio
20
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements