Directorate Of Urban Local Bodies Tender

... More
The DOLBU has issued a formal invitation for competitive bids for the Directorate Of Urban Local Bodies project, for Ward No. 12 In Moh. Shiva Park, From Amit Guptas House To Rameshs House, Vibrated Rubbedmolded Color Cc Interlocking Tiles Road And Drain Construction in Ghaziabad, Uttar Pradesh, with an estimated contract value of Rs. 24,16,600. The bid opening date for this tender is 13-12-2018 and the last date for bid submission is 25-12-2018. Interested bidders for Directorate Of Urban Local Bodies tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Directorate Of Urban Local Bodies - DOLBU Tender

Works
Civil And Construction
Eprocure
Opening Date13 Dec 2018
Closing Date25 Dec 2018
Tender Amount₹ 24,16,600 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.

25.92

75168

2900

... More
M-150 Brick work in one cement & Four Fine sand mortar in foundation and plinth including supply of all materials labour, Tools & plants etc. required for proper completion of the work. (S.I.305)

83.84

373065

4450

... More
Supply and Laying of 80 mm thick interlocking tiles I shaped mechanically compressed inter loking paver blocks manufactured by high pressure and compressed interloking paver blocks manufactured by high pressure and control vibration machine having plan dimension 200*(160+120mm) with minimum 5mm thick topping of O.P. cement mixed with 25% marble powder. The Compressive strength of concrete paver block shall not be less than 30 Mpa and 4.50kg per No. including cost of all materials labour, T&P etc. Also including leveling and dressing of surface up to required level and slopes filling joints with local sand.

1203

902250

750

... More
12 mm thick plaster with cement and fine sand of 1:25 fineness modules in 1:4 over brick work minimum thickness not to be less than 1cm.including supply of all materals labour t&p etc.(S.I. 584)

540

89100

165

... More
Reinforced Cement Concrete with 2c.m.gauge approved slone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (S.I.283)

1.58

11025

7000

... More
Reinforcement and its bending, but including its fixing and binding centering and shuttering etc. and supply of all materials, Labor ,Tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra.S.I.504

148.37

8308

56

... More
Cement Concrete with 2c.m.gauge approved slone balliast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. S.I.279A

17.12

106987

6250

... More
Site Clearence

1

10000

10000

... More
Earth work in filling in ordinary soil by carted earth beyond 5.00Km.extra lead from site(as per analysis)

710.52

203919

287

... More
Extra For Color Tiles as per Deference New Item No -10 of chapter no - 20

1203

84210

70



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.