Directorate Of Urban Local Bodies Tender
... More
The DOLBU has issued a formal invitation for competitive bids for the Directorate Of Urban Local Bodies project, for Ward-08 Gulab Nagar Me Pappu Ke Ghar Se Fultan Ke Ghar Tak Aur Doli Ke Ghar Tak Pipe Line Work in Agra, Uttar Pradesh, with an estimated contract value of Rs. 8,45,379. The bid opening date for this tender is 12-03-2025 and the last date for bid submission is 31-03-2025. Interested bidders for Directorate Of Urban Local Bodies tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Directorate Of Urban Local Bodies - DOLBU Tender
Opening Date12 Mar 2025
Closing Date31 Mar 2025
Tender Amount₹ 8,45,379
Costs
EMD
₹ 84,538Document Cost
₹ 928Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_DOLBU_1015318_6Bid Award Id
ViewTender No
877/NPP-nivida/2024-25Tender Authority
Directorate Of Urban Local Bodies ViewPurchaser Address
-Website
http://http://localbodies.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Interconnection between following dia of pipe including cutting of old pipe line, dewatering, making proper space to work, including supply of all labour, material & T/P etc. complete required for proper completion of work. Interconnection 160x160(160x110) mm dia
4
4170
16682.4
... More
Add 18% GST
1
120010
120010.19
... More
Lowering, laying and jointing of HDPE pipe in proper position using electrofusion specials including supply of all Electrofusion specials & hydraulic testing as per relevent IS Code complete with all accessories like Electrofusion machine, power arrangements, hydraulic testing arrangements, labours, material etc. complete. 110 mm dia HDPE pipe PN-6 ISI marked.
490
118
58226.7
... More
Dismantling of following type of road surfaces for laying of pipe line and house connection work including sorting out of serviceable materials and disposal of unserviceable materials.Interlocking Tiles Road
294
161
47569.2
... More
110 MM Connection with GST
50
1172
58646
... More
Supply of High Density Polyethelene Pipes (HDPE (PN-6)/PE-100), conforming to IS 4984 / 14151 / 12786 / 13488 in coils/ standard lengths F.O.R. desination rates per meter (exclusive of GST) in Rs. every where in UP upto stores of consignees inclusive of third party inspection charges, packing and forwarding charges, transit insurance charges, road transportation chaloading & stacking the same etc. complete. 110 mm dia HDPE pipe PN-6 ISI marked.
490
270
132584.2
... More
Disposal of surplus earth and other similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, etc complete required for proper competion of the work.
4.65
267
1242.7
... More
Re-instatement of following type of road surfaces after laying of pipe line and house connection work including supply of all materials, C.C. Interlocking Tiles Road Type A Construction of C.C. Interlocking Tile road including supply of all materials, labour, T&P etc. required for proper completion of work as per following thickness:-
294
1135
333692.94