Directorate Of Urban Local Bodies Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Directorate Of Urban Local Bodies - DOLBU Tender
Eprocure
Opening Date20 Oct 2023
Closing Date9 Nov 2023
Tender Amount₹ 3,81,545
Costs
EMD
₹ 38,500Document Cost
₹ 472Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_DOLBU_852443_1Bid Award Id
ViewTender No
225 Date 16-10-2023Tender Authority
Directorate Of Urban Local Bodies ViewPurchaser Address
-Website
http://http://localbodies.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earth work in filling with ordanry soil including lead up to 30 mtr and lift up to 1.5 mtr, including extra cartage up to 8.00 km
57.04
17739
311
... More
With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 24405.90X0.85=20745.01
1
20745
20745.04
... More
Dismantiling of old RCC Coverd slab /Ramp including stacking of all materialat site
1.76
1408
800
... More
12 mm thick plaster with cement & course sand of 1.25 FM mortar in 1 : 4
27
5400
200
... More
Providing and laying cement concrete in 1:6:12 (1 cement : 6 Fine sand : 12 Brick ballast 40 mm gauge)
4.73
18920
4000
... More
GST 18 %
1
58197
58197.05
... More
Providing and laying cement concrete with 1:2:4 (1cement 2 coarse sand and 4 graded stone ballast 20 mm nominal size) and curing complete, supply of all materials, curing, labour and T&P etc. required for proper completion of work as per direction of E/I) As per SI. No.279(a)
2.36
16638
7050
... More
Constructing brick masonry manhole in cement mortar 1:4 ( 1 cement : 4 coarse sand ) with R.C.C. top slab with 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), foundation concrete 1:4:8 mix (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size), inside plastering 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand) finished with floating coat of neat cement and making channels in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) finished with a floating coat of neat cement complete as per standard design :Inside size 120x90 cm and 90 cm deep including C.I. cover with frame (medium duty) 500 mm internal diameter, total weight of cover and frame to be not less than 116 kg (weight of cover 58 kg and weight of frame 58 kg) :
63.25
43642
690
... More
First class brick work in 1:4 cement and coarse sand mortar in Super Structure & Filling one brick thick including supply of all materials, labour and T & P etc. required for proper completion of work.
14.97
88772
5930
... More
Supply, Fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications including supply of all material, labour, Tools & Plants etc. required for proper completion of work
0.5
4315
8631
... More
Excavation in foundations in ordinary soil ( Loam clay or sand ) including lift up to 1.5 m and lead up to 30.o meter and including filling, watering and ramming of excavated earth in to the trenches or into the space between the building and the sides of foundation trenches or in to the plinth and removal and disposal of surplus earth as directed by the Engineer- in charges up to a distance of 30 m from the foundation trenches
6.21
683
110