Dakshinanchal Vidyut Vitran Nigam Limited Tender

... More
The DVVNL has issued a formal invitation for competitive bids for the Dakshinanchal Vidyut Vitran Nigam Limited project, for Repairing Of Damaged Transformer At Workshop Mathura And Mainpuri Under Ewd, Agra in Agra, Uttar Pradesh, with an estimated contract value of Rs. 2,17,62,000. The bid opening date for this tender is 03-09-2019 and the last date for bid submission is 09-09-2019. Interested bidders for Dakshinanchal Vidyut Vitran Nigam Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender

Opening Date3 Sep 2019
Closing DateCancelled
Tender Amount₹ 2,17,62,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(B) Painting of 50 mm. wide strip by Green paint on HT /LT side of T/F and writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**

800

-

-

... More
Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).

800

-

-

... More
(B) Re-Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with old wire. Approx 55 KG as per GTP which ever is more Transformer for 160 KVA Cu. T/F respectively (Per Kg. rate to be Quoted).

20

-

-

... More
Continous Welding of top cover plate of repaired Transformer by electric welding and filling gaps wherever necessary.

700

-

-

... More
(A) Punching of MS plate for unique no. 75x200x3 mm. size containing following information:-

1400

-

-

... More
(A) Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 10 KG as per GTP which ever is more Transformer for 10/16 KVA T/F respectively (Per Kg. rate to be Quoted).

700

-

-

... More
Dragging out clean empty tank from yard to repairing hall.

700

-

-

... More
Tightening of top cover plate of repaired Transformer by using nut, bolts and washers with proper gasket sheet.

20

-

-

... More
(A) Punching of MS plate for unique no. 75x200x3 mm. size containing following information:-

800

-

-

... More
(A) Painting of T/F outside with super enemal synthetic paint of YELLOW color in two coats after de-rusting and providing primer of red oxide paint etc. Paint & Painting Material shall be arranged by the contractor.

700

-

-

... More
(A) Painting of T/F outside with super enemal synthetic paint of YELLOW color in two coats after de-rusting and providing primer of red oxide paint etc. Paint & Painting Material shall be arranged by the contractor.

1500

-

-

... More
Tightening of top cover plate of repaired Transformer by using nut, bolts and washers with proper gasket sheet.

800

-

-

... More
Dragging out clean empty tank from yard to repairing hall.

1400

-

-

... More
(B) Clear punching of computerized unique no. on top cover plate of T/F with continuous welding (welding rod & required material shall be provided by contractor).

50

-

-

... More
Taking out assembled core and coils assembly from the "OVEN" after proper magger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.)

50

-

-

... More
(B) Re-Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with old wire. Approx 10 KG as per GTP which ever is more Transformer for 10/16 KVA T/F respectively (Per Kg. rate to be Quoted).

800

-

-

... More
Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations,if required. (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).

800

-

-

... More
Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations,if required. (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).

20

-

-

... More
(A) Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 70 KG as per GTP which ever is more Transformer for 250 KVA Alu. Wound T/F respectively (Per Kg. rate to be Quoted)

50

-

-

... More
Dragging out clean empty tank from yard to repairing hall.

1500

-

-

... More
Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).

1500

-

-

... More
(B) Making of LV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 17 KG as per GTP which ever is more Transformer for 63 KVA T/F respectively (Per Kg. rate to be Quoted)

800

-

-

... More
Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.

800

-

-

... More
(A) Painting of T/F outside with super enemal synthetic paint of YELLOW color in two coats after de-rusting and providing primer of red oxide paint etc. Paint & Painting Material shall be arranged by the contractor.

1400

-

-

... More
Opening of top cover plate by cutting of sealed Transformer top cover plate by chisel Hammer Process and taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area.

50

-

-

... More
Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.

1000

-

-

... More
(B) Making of LV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 24 KG as per GTP which ever is more Transformer for 100 KVA Alu. Wound T/F respectively (Per Kg. rate to be Quoted)

800

-

-

... More
Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.

800

-

-

... More
63 KVA THREE PHASE (WORKSHOP MAINPURI)- Dragging, Shifting, Handling of Transformer from stacking yard to repairing hall and draining of Oil into pit/drum and opening of all its accessories etc.

800

-

-

... More
25 KVA THREE PHASE (WORKSHOP MAINPURI)-Dragging, Shifting, Handling of Transformer from stacking yard to repairing hall and draining of Oil into pit/drum and opening of all its accessories etc.

1400

-

-

... More
Continous Welding of top cover plate of repaired Transformer by electric welding and filling gaps wherever necessary.

800

-

-

... More
(B) Making of LV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 5 KG as per GTP which ever is more Transformer for 10/16, KVA T/F respectively (Per Kg. rate to be Quoted).

800

-

-

... More
Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor).

500

-

-

... More
250 KVA THREE PHASE Alu. Wound(WORKSHOP MAINPURI)-Dragging, Shifting, Handling of Transformer from stacking yard to repairing hall and draining of Oil into pit/drum and opening of all its accessories etc.

50

-

-

... More
(B) Clear punching of computerized unique no. on top cover plate of T/F with continuous welding (welding rod & required material shall be provided by contractor).

800

-

-

... More
Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality. Fitting of all accessories of the transformer including fixing of pressure release valve/bend pipe for fixing of silica gel breather and filling of oil in transformer after check of BDV as per norms. (Bend Pipe wiil be arranged by the contractor at his own cost.)

50

-

-

... More
(A) Reconditioning of the damaged LV leg coils (3Nos.) of T/F, old and damage DPC insulation is to removed and new DPC insulation confirming to IS: 1271/53 is to be provided on LV strip after cleaning of strip LV coil should be made as per original design/design approved by concern JE/AE. Approx 24 KG as per GTP which ever is more Transformer for 100 KVA Alu. wound T/F respectively (Per Kg. rate to be Quoted)

500

-

-

... More
(A) Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 32 KG as per GTP which ever is more Transformer for 63 KVA T/F respectively (Per Kg. rate to be Quoted)

1000

-

-

... More
Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).

700

-

-

... More
Dragging out clean empty tank from yard to repairing hall.

20

-

-

... More
Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.

800

-

-

... More
(A) Reconditioning of the damaged LV leg coils (3Nos.) of T/F, old and damage DPC insulation is to removed and new DPC insulation confirming to IS: 1271/53 is to be provided on LV strip after cleaning of strip LV coil should be made as per original design/design approved by concern JE/AE. Approx 9 KG as per GTP which ever is more Transformer for 25 KVA T/F respectively (Per Kg. rate to be Quoted)

1400

-

-

... More
Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor).

1000

-

-

... More
(B) Re-Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with old wire. Approx 70 KG as per GTP which ever is more Transformer for 250 KVA Au. T/F respectively (Per Kg. rate to be Quoted).

50

-

-

... More
Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.

800

-

-

... More
63 KVA THREE PHASE(WORKSHOP MATHURA)- Dragging, Shifting, Handling of Transformer from stacking yard to repairing hall and draining of Oil into pit/drum and opening of all its accessories etc.

1000

-

-

... More
Opening of top cover plate by cutting of sealed Transformer top cover plate by chisel Hammer Process and taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area.

800

-

-

... More
Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.

500

-

-

... More
Dragging of tank from the repair hall to yard and cleaning oil and dust etc. and scrapping the rust etc. Repairing of burst body & radiator properly with welding including repairing of bended base channel.

500

-

-

... More
Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.

50

-

-

... More
(B) Re-Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with old wire. Approx 17 KG as per GTP which ever is more Transformer for 25 KVA T/F respectively (Per Kg. rate to be Quoted).

1500

-

-

... More
(A) Painting of T/F outside with super enemal synthetic paint of YELLOW color in two coats after de-rusting and providing primer of red oxide paint etc. Paint & Painting Material shall be arranged by the contractor.

20

-

-

... More
Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality. Fitting of all accessories of the transformer including fixing of pressure release valve/bend pipe for fixing of silica gel breather and filling of oil in transformer after check of BDV as per norms. (Bend Pipe wiil be arranged by the contractor at his own cost.)

500

-

-

... More
(A) Painting of T/F outside with super enemal synthetic paint of YELLOW color in two coats after de-rusting and providing primer of red oxide paint etc. Paint & Painting Material shall be arranged by the contractor.

800

-

-

... More
(B) Painting of 50 mm. wide strip by Green paint on HT /LT side of T/F and writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**

800

-

-

... More
(A) Punching of MS plate for unique no. 75x200x3 mm. size containing following information.

800

-

-

... More
Dragging out clean empty tank from yard to repairing hall.

800

-

-

... More
(A) Reconditioning of the damaged LV leg coils (3Nos.) of T/F, old and damage DPC insulation is to removed and new DPC insulation confirming to IS: 1271/53 is to be provided on LV strip after cleaning of strip LV coil should be made as per original design/design approved by concern JE/AE. Approx 17 KG as per GTP which ever is more Transformer for 63 KVA T/F respectively (Per Kg. rate to be Quoted)

800

-

-

... More
(A) Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 10 KG as per GTP which ever is more Transformer for 10/16 KVA T/F respectively (Per Kg. rate to be Quoted).

800

-

-

... More
(B) Painting of 50 mm. wide strip by Green paint on HT /LT side of T/F and writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**

1000

-

-

... More
(B) Re-Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with old wire. Approx 10 KG as per GTP which ever is more Transformer for 10/16 KVA T/F respectively (Per Kg. rate to be Quoted).

700

-

-

... More
(A) Reconditioning of the damaged LV leg coils (3Nos.) of T/F, old and damage DPC insulation is to removed and new DPC insulation confirming to IS: 1271/53 is to be provided on LV strip after cleaning of strip LV coil should be made as per original design/design approved by concern JE/AE. Approx 9 KG as per GTP which ever is more Transformer for 25 KVA T/F respectively (Per Kg. rate to be Quoted)

1500

-

-

... More
(B) Making of LV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 39 KG as per GTP which ever is more Transformer for 160 KVA Alu. Wound T/F respectively (Per Kg. rate to be Quoted)

20

-

-

... More
Dragging out clean empty tank from yard to repairing hall.

800

-

-

... More
Opening of top cover plate by cutting of sealed Transformer top cover plate by chisel Hammer Process and taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area.

500

-

-

... More
(B) Clear punching of computerized unique no. on top cover plate of T/F with continuous welding (welding rod & required material shall be provided by contractor).

500

-

-

... More
Taking out assembled core and coils assembly from the "OVEN" after proper magger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.)

500

-

-

... More
(B) Clear punching of computerized unique no. on top cover plate of T/F with continuous welding (welding rod & required material shall be provided by contractor).

20

-

-

... More
Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations,if required. (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).

1000

-

-

... More
Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality. Fitting of all accessories of the transformer including fixing of pressure release valve/bend pipe for fixing of silica gel breather and filling of oil in transformer after check of BDV as per norms. (Bend Pipe wiil be arranged by the contractor at his own cost.)

20

-

-

... More
10/16 KVA SINGLE PHASE (WORKSHOP MATHURA) – Dragging, Shifting, Handling of Transformer from stacking yard to repairing hall and draining of Oil into pit/drum and opening of all its accessories etc.

800

-

-

... More
Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.

800

-

-

... More
Taking out assembled core and coils assembly from the "OVEN" after proper magger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.)

20

-

-

... More
(B) Making of LV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 17 KG as per GTP which ever is more Transformer for 63 KVA T/F respectively (Per Kg. rate to be Quoted)

1000

-

-

... More
Washing of Transformer tank with castic soda & water. Castic soda shall be provided by contractor.

50

-

-

... More
Tightening of top cover plate of repaired Transformer by using nut, bolts and washers with proper gasket sheet.

50

-

-

... More
(B) Clear punching of computerized unique no. on top cover plate of T/F with continuous welding (welding rod & required material shall be provided by contractor).

800

-

-

... More
(A) Punching of MS plate for unique no. 75x200x3 mm. size containing following information:-

800

-

-

... More
Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.

1400

-

-

... More
Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 32 KG as per GTP which ever is more Transformer for 63 KVA T/F respectively (Per Kg. rate to be Quoted)

800

-

-

... More
(A) Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 45 KG as per GTP which ever is more Transformer for 100 KVA Alu.wound T/F respectively (Per Kg. rate to be Quoted)

500

-

-

... More
160 KVA THREE PHASE Alu. Wound (WORKSHOP MAINPURI)-Dragging, Shifting, Handling of Transformer from stacking yard to repairing hall and draining of Oil into pit/drum and opening of all its accessories etc.

20

-

-

... More
Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations,if required. (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).

50

-

-

... More
Opening of top cover plate by cutting of sealed Transformer top cover plate by chisel Hammer Process and taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area.

20

-

-

... More
Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor).

20

-

-

... More
Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.

50

-

-

... More
Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.

800

-

-

... More
Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).

500

-

-

... More
Opening of top cover plate by cutting of sealed Transformer top cover plate by chisel Hammer Process and taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area.

800

-

-

... More
(A) Reconditioning of the damaged LV leg coils (3Nos.) of T/F, old and damage DPC insulation is to removed and new DPC insulation confirming to IS: 1271/53 is to be provided on LV strip after cleaning of strip LV coil should be made as per original design/design approved by concern JE/AE. Approx 45 KG as per GTP which ever is more Transformer for 250 KVA Alu. wound T/F respectively (Per Kg. rate to be Quoted)

50

-

-

... More
(A) Punching of MS plate for unique no. 75x200x3 mm. size containing following information.

1000

-

-

... More
Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality. Fitting of all accessories of the transformer including fixing of pressure release valve/bend pipe for fixing of silica gel breather and filling of oil in transformer after check of BDV as per norms. (Bend Pipe wiil be arranged by the contractor at his own cost.)

1400

-

-

... More
(B) Re-Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with old wire. Approx 45 KG as per GTP which ever is more Transformer for 100 KVA T/F Alu. Wound respectively (Per Kg. rate to be Quoted).

800

-

-

... More
Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.

1000

-

-

... More
Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.

800

-

-

... More
(A) Reconditioning of the damaged LV leg coils (3Nos.) of T/F, old and damage DPC insulation is to removed and new DPC insulation confirming to IS: 1271/53 is to be provided on LV strip after cleaning of strip LV coil should be made as per original design/design approved by concern JE/AE. Approx 17 KG as per GTP which ever is more Transformer for 63 KVA T/F respectively (Per Kg. rate to be Quoted)

1000

-

-

... More
Dragging out clean empty tank from yard to repairing hall.

1000

-

-

... More
Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations,if required. (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).

800

-

-

... More
(B) Re-Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with old wire. Approx 17 KG as per GTP which ever is more Transformer for 25 KVA Cu. T/F respectively (Per Kg. rate to be Quoted).

1400

-

-

... More
(B) Painting of 50 mm. wide strip by Green paint on HT /LT side of T/F and writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**

1500

-

-

... More
(A) Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 45 KG as per GTP which ever is more Transformer for 100 KVA Alu.wound T/F respectively (Per Kg. rate to be Quoted)

800

-

-

... More
Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.

20

-

-

... More
Dragging out clean empty tank from yard to repairing hall.

800

-

-

... More
Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.

500

-

-

... More
Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations,if required. (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).

700

-

-

... More
(A) Punching of MS plate for unique no. 75x200x3 mm. size containing following information:-

20

-

-

... More
Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor).

1400

-

-

... More
Taking out assembled core and coils assembly from the "OVEN" after proper magger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.)

1400

-

-

... More
(B) Painting of 50 mm. wide strip by Green paint on HT /LT side of T/F and writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**

50

-

-

... More
(B) Clear punching of computerized unique no. on top cover plate of T/F with continuous welding (welding rod & required material shall be provided by contractor).

1000

-

-

... More
Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.

1500

-

-

... More
Continous Welding of top cover plate of repaired Transformer by electric welding and filling gaps wherever necessary.

1500

-

-

... More
Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).

800

-

-

... More
Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations,if required. (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).

1500

-

-

... More
(B) Painting of 50 mm. wide strip by Green paint on HT /LT side of T/F and writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**

700

-

-

... More
Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.

800

-

-

... More
(B) Re-Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with old wire. Approx 32 KG as per GTP which ever is more Transformer for 63 KVA T/F respectively (Per Kg. rate to be Quoted).

1000

-

-

... More
Continous Welding of top cover plate of repaired Transformer by electric welding and filling gaps wherever necessary.

800

-

-

... More
Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.

700

-

-

... More
Tightening of top cover plate of repaired Transformer by using nut, bolts and washers with proper gasket sheet.

500

-

-

... More
(B) Clear punching of computerized unique no. on top cover plate of T/F with continuous welding (welding rod & required material shall be provided by contractor).

800

-

-

... More
(B) Clear punching of computerized unique no. on top cover plate of T/F with continuous welding (welding rod & required material shall be provided by contractor).

1500

-

-

... More
Dragging of tank from the repair hall to yard and cleaning oil and dust etc. and scrapping the rust etc. Repairing of burst body & radiator properly with welding including repairing of bended base channel.

1400

-

-

... More
Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations,if required. (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).

500

-

-

... More
Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).

1000

-

-

... More
Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality. Fitting of all accessories of the transformer including fixing of pressure release valve/bend pipe for fixing of silica gel breather and filling of oil in transformer after check of BDV as per norms. (Bend Pipe wiil be arranged by the contractor at his own cost.)

1500

-

-

... More
Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely bu using nut bolts and spring washer of good quality. Fitting of all accessories of the transformer including fixing of pressure release valve/bend pipe for fixing of silica gel breather and filling of oil in transformer after check of BDV as per norms. (Bend Pipe wiil be arranged by the contractor at his own cost.)

1000

-

-

... More
(A) Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 17 KG as per GTP which ever is more Transformer for 25 KVA T/F respectively (Per Kg. rate to be Quoted)

1400

-

-

... More
Dragging of tank from the repair hall to yard and cleaning oil and dust etc. and scrapping the rust etc. Repairing of burst body & radiator properly with welding including repairing of bended base channel.

800

-

-

... More
Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor).

700

-

-

... More
(A) Punching of MS plate for unique no. 75x200x3 mm. size containing following information:-

500

-

-

... More
(A) Reconditioning of the damaged LV leg coils (3Nos.) of T/F, old and damage DPC insulation is to removed and new DPC insulation confirming to IS: 1271/53 is to be provided on LV strip after cleaning of strip LV coil should be made as per original design/design approved by concern JE/AE. Approx 5 KG as per GTP which ever is more Transformer for 10/16, KVA T/F respectively (Per Kg. rate to be Quoted).

800

-

-

... More
Opening of top cover plate by cutting of sealed Transformer top cover plate by chisel Hammer Process and taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area.

800

-

-

... More
Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.

1500

-

-

... More
Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor).

800

-

-

... More
(B) Making of LV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire Approx 9 KG as per GTP which ever is more Transformer for 25 KVA T/F respectively (Per Kg. rate to be Quoted)

1500

-

-

... More
(B) Making of LV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 5 KG as per GTP which ever is more Transformer for 10/16, KVA T/F respectively (Per Kg. rate to be Quoted).

700

-

-

... More
(B) Re-Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with old wire. Approx 45 KG as per GTP which ever is more Transformer for 100 KVA Alu. T/F respectively (Per Kg. rate to be Quoted).

500

-

-

... More
Dragging of tank from the repair hall to yard and cleaning oil and dust etc. and scrapping the rust etc. Repairing of burst body & radiator properly with welding including repairing of bended base channel.

700

-

-

... More
Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality. Fitting of all accessories of the transformer including fixing of pressure release valve/bend pipe for fixing of silica gel breather and filling of oil in transformer after check of BDV as per norms. (Bend Pipe wiil be arranged by the contractor at his own cost.)

700

-

-

... More
(B) Making of LV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire Approx 9 KG as per GTP which ever is more Transformer for 25 KVA T/F respectively (Per Kg. rate to be Quoted)

1400

-

-

... More
Taking out assembled core and coils assembly from the "OVEN" after proper magger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.)

800

-

-

... More
Opening of top cover plate by cutting of sealed Transformer top cover plate by chisel Hammer Process and taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area.

700

-

-

... More
Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 17 KG as per GTP which ever is more Transformer for 25 KVA T/F respectively (Per Kg. rate to be Quoted)

1500

-

-

... More
Washing of Transformer tank with castic soda & water. Castic soda shall be provided by contractor.

800

-

-

... More
Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.

1000

-

-

... More
Washing of Transformer tank with castic soda & water. Castic soda shall be provided by contractor.

1500

-

-

... More
Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).

800

-

-

... More
(A) Painting of T/F outside with super enemal synthetic paint of YELLOW color in two coats after de-rusting and providing primer of red oxide paint etc. Paint & Painting Material shall be arranged by the contractor.

50

-

-

... More
(A) Reconditioning of the damaged LV leg coils (3Nos.) of T/F, old and damage DPC insulation is to removed and new DPC insulation confirming to IS: 1271/53 is to be provided on LV strip after cleaning of strip LV coil should be made as per original design/design approved by concern JE/AE. Approx 5 KG as per GTP which ever is more Transformer for 10/16, KVA T/F respectively (Per Kg. rate to be Quoted).

700

-

-

... More
Dragging out clean empty tank from yard to repairing hall.

500

-

-

... More
Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor).

800

-

-

... More
(A) Reconditioning of the damaged LV leg coils (3Nos.) of T/F, old and damage DPC insulation is to removed and new DPC insulation confirming to IS: 1271/53 is to be provided on LV strip after cleaning of strip LV coil should be made as per original design/design approved by concern JE/AE. Approx 24 KG as per GTP which ever is more Transformer for 100 KVA Alu. wound T/F respectively (Per Kg. rate to be Quoted)

800

-

-

... More
Dragging of tank from the repair hall to yard and cleaning oil and dust etc. and scrapping the rust etc. Repairing of burst body & radiator properly with welding including repairing of bended base channel.

20

-

-

... More
Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.

1500

-

-

... More
(A) Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 55 KG as per GTP which ever is more Transformer for 160 KVA Alu. Wound T/F respectively (Per Kg. rate to be Quoted)

20

-

-

... More
(B) Re-Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with old wire. Approx 32 KG as per GTP which ever is more Transformer for 63 KVA Cu. T/F respectively (Per Kg. rate to be Quoted).

800

-

-

... More
(B) Clear punching of computerized unique no. on top cover plate of T/F with continuous welding (welding rod & required material shall be provided by contractor).

700

-

-

... More
(B) Painting of 50 mm. wide strip by Green paint on HT /LT side of T/F and writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**

500

-

-

... More
Washing of Transformer tank with castic soda & water. Castic soda shall be provided by contractor.

20

-

-

... More
Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely bu using nut bolts and spring washer of good quality. Fitting of all accessories of the transformer including fixing of pressure release valve/bend pipe for fixing of silica gel breather and filling of oil in transformer after check of BDV as per norms. (Bend Pipe wiil be arranged by the contractor at his own cost.)

800

-

-

... More
Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.

800

-

-

... More
Washing of Transformer tank with castic soda & water. Castic soda shall be provided by contractor.

700

-

-

... More
Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality. Fitting of all accessories of the transformer including fixing of pressure release valve/bend pipe for fixing of silica gel breather and filling of oil in transformer after check of BDV as per norms. (Bend Pipe wiil be arranged by the contractor at his own cost.)

800

-

-

... More
Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).

50

-

-

... More
Washing of Transformer tank with castic soda & water. Castic soda shall be provided by contractor.

1400

-

-

... More
Dragging out clean empty tank from yard to repairing hall.

50

-

-

... More
Opening of top cover plate by cutting of sealed Transformer top cover plate by chisel Hammer Process and taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area.

1400

-

-

... More
Opening of top cover plate by cutting of sealed Transformer top cover plate by chisel Hammer Process and taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area.

1500

-

-

... More
Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.

500

-

-

... More
Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).

20

-

-

... More
Dragging of tank from the repair hall to yard and cleaning oil and dust etc. and scrapping the rust etc. Repairing of burst body & radiator properly with welding including repairing of bended base channel.

800

-

-

... More
(B) Clear punching of computerized unique no. on top cover plate of T/F with continuous welding (welding rod & required material shall be provided by contractor).

1400

-

-

... More
Continous Welding of top cover plate of repaired Transformer by electric welding and filling gaps wherever necessary.

1000

-

-

... More
Washing of Transformer tank with castic soda & water. Castic soda shall be provided by contractor.

800

-

-

... More
100 KVA THREE PHASE Alu. Wound (WORKSHOP MATHURA)-Dragging, Shifting, Handling of Transformer from stacking yard to repairing hall and draining of Oil into pit/drum and opening of all its accessories etc.

800

-

-

... More
Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor).

800

-

-

... More
Taking out assembled core and coils assembly from the "OVEN" after proper magger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.)

800

-

-

... More
Dragging of tank from the repair hall to yard and cleaning oil and dust etc. and scrapping the rust etc. Repairing of burst body & radiator properly with welding including repairing of bended base channel.

50

-

-

... More
(B) Making of LV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 45 KG as per GTP which ever is more Transformer for 250 KVA Alu. Wound T/F respectively (Per Kg. rate to be Quoted)

50

-

-

... More
(A) Punching of MS plate for unique no. 75x200x3 mm. size containing following information:-

50

-

-

... More
25 KVA THREE PHASE (WORKSHOP MATHURA)-Dragging, Shifting, Handling of Transformer from stacking yard to repairing hall and draining of Oil into pit/drum and opening of all its accessories etc.

1500

-

-

... More
Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor).

50

-

-

... More
Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.

20

-

-

... More
Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.

20

-

-

... More
(A) Painting of T/F outside with super enemal synthetic paint of YELLOW color in two coats after de-rusting and providing primer of red oxide paint etc. Paint & Painting Material shall be arranged by the contractor.

800

-

-

... More
(A) Painting of T/F outside with super enemal synthetic paint of YELLOW color in two coats after de-rusting and providing primer of red oxide paint etc. Paint & Painting Material shall be arranged by the contractor.

500

-

-

... More
100 KVA THREE PHASE Alu. Wound (WORKSHOP MAINPURI)-Dragging, Shifting, Handling of Transformer from stacking yard to repairing hall and draining of Oil into pit/drum and opening of all its accessories etc.

500

-

-

... More
(A) Reconditioning of the damaged LV leg coils (3Nos.) of T/F, old and damage DPC insulation is to removed and new DPC insulation confirming to IS: 1271/53 is to be provided on LV strip after cleaning of strip LV coil should be made as per original design/design approved by concern JE/AE. Approx 39 KG as per GTP which ever is more Transformer for 160 KVA Alu. Wound T/F respectively (Per Kg. rate to be Quoted)

20

-

-

... More
Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.

700

-

-

... More
Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations,if required. (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).

800

-

-

... More
Dragging of tank from the repair hall to yard and cleaning oil and dust etc. and scrapping the rust etc. Repairing of burst body & radiator properly with welding including repairing of bended base channel.

1000

-

-

... More
Dragging of tank from the repair hall to yard and cleaning oil and dust etc. and scrapping the rust etc. Repairing of burst body & radiator properly with welding including repairing of bended base channel.

800

-

-

... More
Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).

1400

-

-

... More
Continous Welding of top cover plate of repaired Transformer by electric welding and filling gaps wherever necessary.

1400

-

-

... More
(A) Painting of T/F outside with super enemal synthetic paint of YELLOW color in two coats after de-rusting and providing primer of red oxide paint etc. Paint & Painting Material shall be arranged by the contractor.

800

-

-

... More
10/16 KVA SINGLE PHASE (WORKSHOP MAINPURI)– Dragging, Shifting, Handling of Transformer from stacking yard to repairing hall and draining of Oil into pit/drum and opening of all its accessories etc.

700

-

-

... More
Washing of Transformer tank with castic soda & water. Castic soda shall be provided by contractor.

500

-

-

... More
Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality. Fitting of all accessories of the transformer including fixing of pressure release valve/bend pipe for fixing of silica gel breather and filling of oil in transformer after check of BDV as per norms. (Bend Pipe wiil be arranged by the contractor at his own cost.)

800

-

-

... More
(A) Painting of T/F outside with super enemal synthetic paint of YELLOW color in two coats after de-rusting and providing primer of red oxide paint etc. Paint & Painting Material shall be arranged by the contractor.

1000

-

-

... More
(B) Painting of 50 mm. wide strip by Green paint on HT /LT side of T/F and writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**

800

-

-

... More
(A) Punching of MS plate for unique no. 75x200x3 mm. size containing following information:-

700

-

-

... More
(B) Making of LV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 24 KG as per GTP which ever is more Transformer for 100 KVA Alu. Wound T/F respectively (Per Kg. rate to be Quoted)

500

-

-

... More
Dragging of tank from the repair hall to yard and cleaning oil and dust etc. and scrapping the rust etc. Repairing of burst body & radiator properly with welding including repairing of bended base channel.

1500

-

-

... More
Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.

1400

-

-

... More
(B) Painting of 50 mm. wide strip by Green paint on HT /LT side of T/F and writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**

20

-

-

... More
Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.

1400

-

-

... More
Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.

50

-

-

... More
Taking out assembled core and coils assembly from the "OVEN" after proper magger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.)

700

-

-

... More
(A) Punching of MS plate for unique no. 75x200x3 mm. size containing following information:-

1500

-

-

... More
(B) Painting of 50 mm. wide strip by Green paint on HT /LT side of T/F and writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**

1400

-

-

... More
Washing of Transformer tank with castic soda & water. Castic soda shall be provided by contractor.

800

-

-

... More
Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations,if required. (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).

1400

-

-

... More
Taking out assembled core and coils assembly from the "OVEN" after proper magger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.)

1500

-

-

... More
Taking out assembled core and coils assembly from the "OVEN" after proper magger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.)

800

-

-

... More
Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor).

1500

-

-

... More
Washing of Transformer tank with castic soda & water. Castic soda shall be provided by contractor.

1000

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.