Dakshinanchal Vidyut Vitran Nigam Limited Tender
... More
The DVVNL has issued a formal invitation for competitive bids for the Dakshinanchal Vidyut Vitran Nigam Limited project, for Repairing And Maintenance Work Of Ht/lt Lines In The Area Of Edsd-naujheel Under Edd-mant, Mathura In Oandm Head Fy 2025-26 in Mathura, Uttar Pradesh. The bid opening date for this tender is 28-03-2025 and the last date for bid submission is 03-04-2025. Interested bidders for Dakshinanchal Vidyut Vitran Nigam Limited tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.
Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender
Opening Date28 Mar 2025
Closing DateCancelled
Tender AmountRefer Documents
Costs
EMD
₹ 10,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Summary
Repairing And Maintenance Work Of Ht/lt Lines In The Area Of Edsd-naujheel Under Edd-mant, Mathura In Oandm Head Fy 2025-26
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_DVVNL_1023274_1Bid Award Id
ViewTender No
58/EDC-II(M)/2024-25Tender Authority
Dakshinanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://https://www.dvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Errection of 11/13 mtr. long STP poles as single support including fixing of all HT/LT accessories etc, grouting and plinth as per RESPO norms.
28
-
-
... More
(xii) Stays clamp
15
-
-
... More
Strainthing of tilted D/P after opening of connection applying anti direction force, digging of dug for proper alignment of line.
10
-
-
... More
(b) Of 11 KV Line
80
-
-
... More
(v) 11 KV Cross arms holding clamps
30
-
-
... More
Straighting of tilted PCC/R.S.Joist poles of HT/LT line after opening of nozzling, digging of pit applying anti direction force for making of proper alignment of line.
15
-
-
... More
(ix) 33 KV disc insulator
15
-
-
... More
(xiv) Shackle insulator
15
-
-
... More
Replacement of following broken/damaged/missing accessories by new accessories including opening of the same and refixing.
(i) 11 KV cross arms ‘V’ type
30
-
-
... More
(viii) 33 KV pin with nut
15
-
-
... More
(ii) ACSR Dog/Raccon
1500
-
-
... More
Laying sagging stringing, binding, jumpering & fixing of all accessories etc of following ABC on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work. (a) ABC 50/95 Sqmm
400
-
-
... More
(iii) 11 KV pin with nut
30
-
-
... More
Fixing of stay rod with nuzzling etc. complete.
20
-
-
... More
(vii) 33 KV pin insulator
15
-
-
... More
Repairing/ resagging/ new guarding of HT/LT Line with GI wire as per RESPO Norms.
10
-
-
... More
Re-sagging of following loose ABC as per direction of supervising engineer. It includes the cost of labour, T & P carrier etc required for proper completion of work. (a) Of ABC 50/95 Sqmm
80
-
-
... More
Re-sagging of following loose conductor as per direction of supervising engineer. It includes the cost of labour, T & P carrier etc required for proper completion of work. (a) Of 33 KV Line
80
-
-
... More
Dismantling and removal of existing following conductor from the various area, stacking and placement their coils and their in the respective J.E.’s (Store) as per direction of supervising engineer. It includes the work of cartage the cost of labour T & P carrier etc. required for proper completion of work. (i) ACSR Weasel/Rabbit
3000
-
-
... More
Errection of 8.5/9 mtr. long PCC poles as D.Pole/section pole including fixing of all HT/LT accessories etc and other work complete as per RESPO norms.
5
-
-
... More
(ii) ACSR Dog/Raccon
1500
-
-
... More
Errection of 11/13 mtr. long STP poles as D.Pole/section pole including fixing of all HT/LT accessories etc, grouting and plinth as per RESPO norms.
6
-
-
... More
(xi) F Bracket
15
-
-
... More
(x) 33 KV Cross arms holding clamps
15
-
-
... More
(b) ABC 120 Sqmm
400
-
-
... More
Earthling of Pole with MS Earth Rod as per RESPO Specification.
20
-
-
... More
(xiii) LT Pin clamp
15
-
-
... More
Chopping of tree branches
300
-
-
... More
Safe carriage of 11/13 mtr. Long STP pole from store center Mathura/nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. Including loading & unloading at both ends.
40
-
-
... More
Removal/Dismantling of consumer’s cable service connection from existing line feeding consumer supply.
180
-
-
... More
(iv) 11 KV disc insulator
30
-
-
... More
Carriage of old material from pit site to JE store/store center Mathura in distance range 0 to 60 km. including loading & unloading and proper stacking.
10
-
-
... More
Retightening of Stay rod. Etc. complete.
20
-
-
... More
Safe carriage of line material from store center Mathura/nearest 33/11 KV S/S to pit site in distance range 0 to 60 km. Including loading & unloading at both ends.
10
-
-
... More
(vi) 33 KV cross arms ‘V’ type
15
-
-
... More
(b) ABC 120 Sqmm
80
-
-
... More
(c) Of LT Line
80
-
-
... More
Errection of 8.5/9 mtr. long PCC poles as single support including fixing of all HT/LT accessories etc and other work complete as per RESPO norms.
24
-
-
... More
Re-installation of consumer’s cable service connection from existing line feeding consumer supply.
180
-
-