Cane Development And Sugar Industry Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Cane Development And Sugar Industry Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date3 May 2025
Closing Date14 May 2025
Tender Amount₹ 28,92,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Reinforced Concrete work in Beams, Suspended Floors Roof

1.98

6242

12360.942

... More
As in item 3 above but in R.C.C. columns in 1:1.5:3 having strength not less than [1 cement :1.5 coarse sand :3 stone aggregate] M-20

7.76

6257

48555.871999999996

... More
Reinforced Concrete work in Walls

6.52

7507

48947.596

... More
As in item 3 above but in R.C.C. Work in footing / foundation and footing with approved stone ballast.(Using 1:1.5:3 Mix concrete) [1 cement :1.5 coarse sand :3 stone aggregate] M-20

22.28

6257

139410.416

... More
TMT Fe-500 or iron in plain work such as reinforced concrete or reinforced, brick work (when not included in over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level.

61.01

7460

455152.903

... More
M-150 brick work in 1:6 (one cement and four coarse sand of 2.25 fineness modulus) mortar in foundation & plinth including supply of all materials, labour and T & P etc required for proper completion of the work.

15.83

4933

78097.30500000001

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in: Cement mortar 1:6 (1 cement : 6 coarse sand)

37.59

6298

236771.89200000002

... More
12 mm cement plaster in single coat on rough side of single or half brick wall for interior plastering up to floor two level including internal rounded angles not exceeding 80 mm in girth and finshed even and smooth. (1) 1 cement : 6 coarse sand (2.25 F.M.)

524.69

273

143502.71500000003

... More
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade : New work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm)

524.69

118

62123.29600000001

... More
Providing and applying white cement based putty of average of thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.

524.69

107

56614.05100000001

... More
Foundations, footings, bases of columns, etc. for mass concrete

123.42

271

33471.504

... More
Lintels, beams, plinth beams, girders, bressumers and cantilevers.

85.79

509

43701.426

... More
Columns, Pillars, Piers, Abutments, Posts and Struts

174.22

665

115856.3

... More
Earthwork In Filling with cartage earth brought from 5 km away i/c all complete work

392

337

132221.6

... More
Construction of GSB

98

2626

257348

... More
S/Laying 80 mm thick Precast cement Concrete I Shape Interlocking

784

931

729904

... More
Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5 m (5 fts.) and lead upto 30 mt. (100 fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-Incharges upto a distance of 30mt. (100 fts) from the foundation trenches.

8.91

180

1604.691

... More
Providing and laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) including supply of all materials, labour T & P rtc required for proper completion of the work and curing complete also including cost of formwork in foundation & floors.

0.59

4712

2780.08

... More
R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone ballast in the proportion of 1:1.5:3 in raft foundation and footing excluding supply of reinforcement and its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being inluded in the item.(M-20)

2.45

6257

15330.140000000001

... More
R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone ballast in the proportion of 1:1.5:3 in columns excluding supply of reinforcement and its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being inluded in the item.(M-20)

0.79

6257

4943.188

... More
Reinforced Concrete work in Walls (Any thickness)

0.95

7507

7131.839999999999

... More
TMT Fe-500 or iron in plain work such as reinforced concrete or reinforced, brick work (when not included in over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level. 9

7.18

7460

53564.236

... More
Finishing wall with Premium Acrylic Smooth Exterior Paint

8.4

118

994.5600000000001

... More
Providing and applying white cement based putty of average of thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.

8.4

107

906.3600000000001

... More
Mild steel or iron work in heavy sizes such as trusses built up gates, door frames, record racks, roof work gates etc. wrought to required from including supply of steel and its wastage including cost of bolts, nuts if required for and welding, grinding and making holes as required completion of work fabrication of holes doors, chaukhats nosing.

792

119

94564.8

... More
Painting or varnishing work in small areas or new wood work with one coat upto one square metre of ready mixed priming paint and one coat of approed superior quality ready mixed paint or varnish including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. Paint to be used should fonfirm the ISI no. 103-1950 (M.S. works)

36

156

5634

... More
Foundations, footings, bases of columns, etc. for mass concrete

9.98

271

2707.574

... More
Lintels, beams, plinth beams, girders, bressumers and cantilevers.

10.15

509

5170.41

... More
Columns, Pillars, Piers, Abutments, Posts and Struts

14.96

665

9948.400000000001



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.