Bareilly Development Authority Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Bareilly Development Authority - BDA Tender
Civil And Construction
Eprocure
Opening Date20 May 2025
Closing Date17 Jun 2025
Tender Amount₹ 4,76,53,229
AI Insights
Technical
Technical
Additional Eligibility
Class Of Bidder
... View More
Class of contractor: Civil
Technical Capacity
... View More
The bidder is required to have prior work experience, which includes providing a list of works satisfactorily completed during the last seven consecutive financial years in various sectors. The experience is accepted along with certificates, and an attested copy of similar nature of work is required. The specific requirements for the value and percentage of similar works completed are as follows: - The bidder should have completed works costing not less than 80% of the bid value, - or two works of similar nature each costing not less than 50% of the bid value, - or three works of similar nature each costing not less than 40% of the bid value.
Costs
EMD
₹ 9,54,000Document Cost
₹ 10,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_BDAUP_1041025_1Tender No
T-16/2025/07Tender Authority
Bareilly Development Authority ViewPurchaser Address
-Website
http://http://www.bdainfo.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying design mix cement concrete of M-30 grade, in roads/ taxi tracks/ runways, using cement content as per design mix, using coarse sand and graded stone aggregate of 40 mm nominal
size in appropriate proportions as per approved & specified designcriteria, providing dowel bars with sleeve/ tie bars wherever required, laying at site, spreading and compacting mechanically by using
needle and surface vibrators, levelling to required slope/ camber, finishing with required texture, including steel form work with sturdy M.S. channel sections, curing, making provision for contraction/ expansion, construction & longitudinal joints (10 mm wide x 50 mm
deep) by groove cutting machine, providing and filling joints with approved joint filler and sealants, complete all as per direction of Engineer-in-charge (Item of joint fillers, sealants, dowel bars with sleeve/ tie bars to be paid separately).
Note:- Cement content considered in M-30 is @ 340 kg/cum. Excess/ less cement used as per design mix is payable/ recoverable separately.
Cement concrete manufactured in automatic batching
plant (RMC plant) i/c transportation to site in transit
mixerD.S.R. Item No. 16.43.2
871.5
8392
-
... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in as over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. P.W.D. SOR 2023 Item No. 504
273.65
8870
-
... More
Providing and filling in position rubberized bitumen hot sealingcompound for sealing of expansion joints in roads / pavements all complete as per direction of the Engineer-in-Charge.Using grade 'A' sealing compound conforming to IS: 1834.D.S.R. Item No. 16.46.1
2050
5
-
... More
Boundary wall
Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.5 m & lead upto 30m including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the Engineer in charge upto a distance of 30 m from the foundation trenches. including royality. P.W.D. SOR 2023 Item No. 251
1245.38
195
-
... More
Concrete with 4cm guage stone ballast,course sand of 2.75 fineness modulous and cement in proportion of 8:4:1 in foundation and under floor, including supply of all material, labour and T&P etc. required for proper completion of the work
P.W.D. SOR 2023 Item No. 281
85.62
6980
-
... More
Cement concrete with 2cm gauge approved stone grit, coarse sand and cement in the proportion of 4:2:1 including supply of all materials, labour and T&P etc. required for proper completion of the work.
P.W.D. SOR 2023 Item No. 279(i)
4.62
7645
-
... More
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, / Ordinary Portland , admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level
Concrete of M25 grade with minimum cement content of 330 kg /cum
DSR 2023 Item No. 5.33.1.1
456.61
7187
-
... More
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.
All works above plinth level upto floor V level Concrete of M25 grade with minimum cement content of 330 kg /cum (level 1 to lvl-5)
D.S.R. Item No. 5.33.2.1
153.24
7456
-
... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in as over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. P.W.D. SOR 2023 Item No. 504
1345.37
8870
-
... More
First class brick work in 1:4 (one part of cement and four part of coarse sand) cement mortar in foundation and plinth incluidng supply of all material. Labour T&P etc required for proper completion of work.
P.W.D. SOR 2023 Item No. 305
190.34
5350
-
... More
First class brick work in super structure for 230 mm thick wall 1:4 (one part of cement and four part of coarse sand) cement mortar incluidng supply of all material. Labour T&P etc required for proper completion of work.
P.W.D. SOR 2023 Item No. 305+309+310
941.46
6120
-
... More
First class brick work in super structure for 115 mm thick wall 1:4 (one part of cement and four part of coarse sand) cement mortar incluidng supply of all material. Labour T&P etc required for proper completion of work.
P.W.D. SOR 2023 Item No. 305+309+310a
106.94
6310
-
... More
P/L 25 mm thick cement concrete DPC 1:1.5:3 including waterproffing material as ordered by Engineer In Charge for ratio as spepify the manufacturer.
P.W.D. SOR 2023 Item No. 361(a)
392.28
385
-
... More
Painting bitumen on DPC 1.7 Kg/Sqm 85/50 or 85/25 all complete .
P.W.D. SOR 2023 New Item No.1 Ch-7
392.28
175
-
... More
Mild steel or iron work of heavy size, grill and built gate and door grame etc. including cutting bending and binding, placing for required shape and size all complete of the work as per P.W.D. SOR 2023 Item No. 503
344.73
9310
-
... More
12mm thick plaster with 1:4 ( one part cement & four parts of coarse sand of 2.75 F.M.) over brick work minimum thickness not to be less than 1 cm including supply of all material, labour, T&P etc. required for proper completion of the work.
P.W.D. SOR 2023 Item No. 584+diff
6199.2
205
-
... More
Finishing with EPOXY paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface with putty etc. complete on concrete work. DSR 2023 Item No. 13.52.2
6199.2
177
-
... More
Painting on steel work with one priming coat and one coats of synthetic enemal paint all complete P.W.D. SOR 2023 Item No. 1+2+4iii
1348.44
80
-
... More
Drainage
Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.5 m & lead upto 30m including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the Engineer in charge upto a distance of 30 m from the foundation trenches. excluding royality
P.W.D. SOR 2023 Item No. 251
812.36
195
-
... More
Concrete with 4 cm guage stone ballast, coarse sand 1.25FM and cement in proportion of 8:4:1 in foundation and under floor including supply of all material labour and T&P etc. required for the proper completion of the work.
P.W.D. SOR 2023 Item No. 281
84.04
6980
-
... More
Centering and shuttering including strutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete
DSR 2023 Item No. 5.9.1
1992
296
-
... More
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, / Ordinary Portland , admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level
Concrete of M25 grade with minimum cement content of 330 kg /cum
DSR 2023 Item No. 5.33.1.1
140.06
7187
-
... More
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.
All works above plinth level upto floor V level Concrete of M25 grade with minimum cement content of 330 kg /cum (level 1 to lvl-5) Drain Culvert
D.S.R. 2023 Item No. 5.33.2.1
6
7456
-
... More
Centering and shuttering including strutting, propping etc. and removal of form for suspended floors, roof , landings, balconies, acessess platform
D.S.R. 2023 Item No. 5.9.3
30
701
-
... More
Add for using extra cement in the items of design mix over and above the specified cement content therein.
PWD SOR Basic Rate of Material 7i
70.03
600
-
... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in as over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. P.W.D. SOR 2023 Item No. 504
114.66
8870
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%