Banda Development Authority Tender
... More
The Banda Development Authority has issued a formal invitation for competitive bids for Tulsi Nagar Awasiya Yojna Pratham Charan Me Naliyon Ki Marammat Avam Sudhrikaran Ka Karya in Banda, Uttar Pradesh, with an estimated contract value of Rs. 58,61,294. The bid opening date for this tender is 18-02-2019 and the last date for bid submission is 28-02-2019. Interested bidders for Banda Development Authority tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Banda Development Authority Tender
Civil And Construction
Eprocure
Opening Date18 Feb 2019
Closing Date28 Feb 2019
Tender Amount₹ 58,61,294 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 1,16,700Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_BDA_312011_1Bid Award Id
ViewTender No
755(2)ETENDER/BDA/2018-19/SN2Tender Authority
Banda Development Authority ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Dismantling of brick work or stone work in line or cement mortar and including stacking of materials as directed by the E/I within a distance of 60 mtrs.
200
-
320
... More
Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 Km. from the side of work & including watering, dressing etc. rate to include cost of all material, labour and tools & plants etc. required for proper completion of the work (SI No. 255)
26.5
-
1000
... More
Sale of material : brick bats avilable from dismentling of brick work
1
-
-
... More
Deduct- Part-B - Bricks Bats(75%). (250*1050=262500 to be deducted)
1
-
-
... More
M.S. or iron in plain work such as reinforced concrete/brick work (when not including in over all rates) wrought to required shape as necessary including, bending for proper completion of the work and including supply of steel, its wastage, and, hooks and authorised overlapping shall be measured. (S.I. no. 504)
15
-
5600
... More
Earth work in excavation in foundation, pipes cable etc. in ordinary soil (loam clay or sand) including lift upto 1:5m lead upto 50 m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer I/C (Sl no. 251)
196
-
110
... More
R.C.C. work with cement, approved coarse sand and 2cm gauge approved stone ballast in the proportion of 1:1.5:3 in slab excluding supply of reinforcement and its bending but including its fixing and binding the same with 24B.W.G.I. wire and including neccessary centering and shuttering etc and also including supply of all materials labour & T&P etc. required for proper completion of works. binding wire to be supplied by the contractor free of cost (S.I. 284+Diffrence of SI No 279B & SI No 279A)
(5800+400)= 6200
16
-
7100
... More
Deduct- Part-A - Bricks (25%). (23*6400=147200 to be deducted)
1
-
-
... More
Cement concrete with 2 cm. gauge approved stone ballast, approved coarse sand cement, in proportion 4:2:1 Including supply of all materials, labour and tools and plants etc. required for proper completion of the work. (S.I. 279A)
119
-
5500
... More
Cement concrete with 4 cm. gauge approved stone ballast, approved coarse sand cement, in proportion 8:4:1 Including supply of all materials, labour and tools and plants etc. required for proper completion of the work. (SI No. 281)
33.5
-
4200