Banda Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Banda Development Authority Tender

Works
Eprocure
Opening Date19 Feb 2019
Closing Date28 Feb 2019
Tender Amount₹ 13,38,873 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
R.C.C. work with cement, approved coarse sand and 2cm (3/4'') gauge approved stone ballast in the proportion of 1:1.5:3. excluding supply of rainforcement and its binding but including its fixing and binding wire copmlete with all respect. (S.I. No. 289)

75

-

7400

... More
Mild steel Or iron work in plain work such as in RCC (when not included in over all rates) wrought to requerd shape as necessary including banding for proper completion of the work and including supply of steen, its wastage and hooks and authorised over lapping shall be measured (SI No…504)

88

-

5600

... More
M.S. iron work in heavy sizes such as trusses built up gates doors frames record track tec. All complete with all resopact (SI NO.503/2018)

1.75

-

5900

... More
Class 150 Brick work in 1:3 cement and course sand in Super strcture complete with all respact including supply of all materials, labour Tools & Plants etc. required for proper completion of the work. (SI No. 307+309)

15

-

5690

... More
P/L 12mm. Thick Plaster 1:4 Cement & Sand on brick work minimum thickness not less then 10mm with 1 part of cement and 4 part of find sand of 1.25 fineness modulus. (S.No. 584)

230

-

130

... More
2cm. Thick cement plaster in 1:2 cement and course sand finish with 3mm. Thick floting coat of neet cement complete with all respect.(S No. 597)

14

-

190

... More
P/A white cement based putty of average thickness 1.0 mm complete with all respect as per DSR 3.80

230

-

87.35

... More
Finishing walls with premium acralic smooth exterior paint with silicone additives of required shaid complete with all respect (S No.13.47.1)

285

-

80

... More
Painting and varnishing 03 coats on previously painted old wood or iron work. Including priming coat and its sand papering rubbing and cleaning as required for proper completion of the work. (SI No. 643)

60

-

88

... More
P/F Tata blue scope (0.45 mm. thick and 1.00 mtr. wide) sheet complete with all respect. As per deriction of eng incharge

110

-

1070

... More
cement concrete with 4cm gauge approved stone ballast, course sand, cement in praportion of 1:2:4 including supply of all material labour , T&P Etc. requried for proper completion of the work (SI.No. 279)

3.5

-

5000

... More
Amount of bricks optained from dismentling will deduted as per deriction of E/I . Deduction will be done at the time of payment

1

-

-

... More
Amount of brick bats optained from dismentling will deduted as per deriction of E/I. Deduction will be done at the time of payment

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.