Agra Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Agra Development Authority - ADA Tender

Works
Housekeeping Services
Eprocure
Opening Date10 Jan 2023
Closing Date16 Jan 2023
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying Semi dense bituminous concrete with 60-90 TPH Batch type HMP producing an average output of 75 tonnes per hours using crushed aggregates of specified grading (9.50-4.75mm @ 57%, 4.75mm and below 41 %, Filler -2%) premixed with bituminous binder @ 4.5 % of mix and fillar using VG-30 bitumen transporting the hot mix to work site, laying with a hydrostatic paver finsher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No- 508 complete. in all respcts.

115

468970

4078

... More
Providing & laying hot applied thermo plastic compound 2.5 mm thick including refletrorising glass beads @ 250 gm/sqm, Area, thickness of 2.5 mm is exclusive of surfae applied glass beads as per. I.R.C. 35. the finish surface to be level, uniform and free from streaks and holes. composition of thermo plastic material shall be as per table 800-3 of clause 803 of MORTH including cost of all material, labour, T&C etc, required for proper completion of work as direction by Engineer-in-charge. including all taxes. (Ch.-28, SI.No.2) SOR- 2022-23

121

74778

618

... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work DSR-2021 SI.No-13.61.1

1550

124000

80

... More
Providing and laying cement concrete in 1:1.5:3 (1 Cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) and curing complete, Including cost of form work. In Foundation and floors. (Ch-5 SI.No-7 SOR 2022-23)

5

34000

6800

... More
Supply of sweeper for cleaning . (Full time)

20

9000

450

... More
Providing, mixing and applying SBR polymer (of approved make @ minimum 2% by wt. of cement used) modified plain/reinforced cement concrete for structural members having minimum characteristic compressive strength [with ordinary portland cement, coarse sand and graded stone aggregate of 10mm maximum size in proportion as per design criteria] with specified average thickness. Note: Rates shall be for finished surface area of concrete and shall include the cost of labour, concrete and appropriate approved Super-Plasticiser for rendering concrete as flowable and SBR polymer but shall exclude cost of reinforcement, bond coat, Shear Keys, centering and shuttering, strutting, propping etc (Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily valuated by sounding/tapping with a blunt metal instrument) 26.33.1 50mm thick in Grade M 25 with cement content not less than 330 kg per cum (DAR-2021, Vol-2, SI. No- 26.33.1 )

1470

833857

567.25



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.