Agra Development Authority Tender

... More
The ADA has issued a formal invitation for competitive bids for the Agra Development Authority project, for Road Strengthening Work From Railway Police Post Near Stachey Bridge To Mehtab Bagh. Hot Mix Plant Holder in Agra, Uttar Pradesh. The bid opening date for this tender is 17-10-2023 and the last date for bid submission is 30-10-2023. Interested bidders for Agra Development Authority tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.

Agra Development Authority - ADA Tender

Opening Date17 Oct 2023
Closing Date30 Oct 2023
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation in foundation in ordinary Soil (Loam, Clay or sand) including, lift upto 1.50 M and lead Upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as per directed by the Engineer-in-charge up to a distance of 30 M from the foundation trenches.(CH-4 Item No. 1 SOR-2023-24)

223

150

33450

... More
Scarifying existing bituminous surface to a depth of 50 mm and disposal of scarified material within all lift and leads upto 1000 m as per Technical Specification Clause 305.4.3 (CH-20 Item No. 24 SOR-2023-24)

2992

5

17204

... More
12mm Thick cement plaster in single coat on fair side of single or half brick wall for interior plastering upto floor two level including internal rounded angles not exceeding 80mm in girth, chamfers and finished even and smooth. (CH-13 S.I. No. 1 SOR-2023-24) (I) 1 cement : 4 Coarse sand

305

200

61000

... More
Providing and Laying spreading and compacting grades stone aggregate to wet mix macadam (WMM) specification including premixing the material with water to OMC in mechnical Mix plant carries of mixed materical by tipper to site laying in uniform layers with paver in sub-base/base course on a well prepared surface and compacting with vibratory roller to achieve the desired density as per MORT&H specification No 406 S.No. 4.12 (table -400-11) Material (For Grading-I), 53 mm -22.4 mm 30.00%, 22.4mm-4.75mm 40.00%, 2.36 mm and below 30%) (Analysis Rate)

100

2869

286900

... More
Earth work filling in embankment … all complete (Analysis Rate)

500

274

137000

... More
Earth work in cutting or in embankment in ordinary soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5 m lift and 30m lead. The earth in form of cutting (b) to be used as spoil banks within 50m distance as directed by the Engineer-in-Charge. (CH-4 Item No. 253(a) SOR 2023-24)

1404

140

196560

... More
Providing and laying of Bituminous Macadom with 60-90 TPH Batch type Hot Mix Plant producing an average out put of 75 TPH, Ussing Crushed stone aggregates of specified grading as given below, Primixed with Bituminous Binder @ 3.30% of mix and filter, Transporting the hot mix to work site, laying with a hydrostatic paver finsher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem roller to achieve the disired compaction as per MORTH specification clause No. 501.6 and 501.7 complete in all respects 50mm to 80 mm thick using VG-30 Bitumen (Grading 19mm nominal size) 25-10mm 40% 10-5mm 40% 5mm and below 20% (Analysis Rate)

970

3524

3418280

... More
Providing and laying Semi Dense Bituminious Concrete with 60-90 TPH Batch type Hot Mix Plant producing an average out put of 75 TPH, Using Crushed stone aggregates of specified grading as given below, premixed with Bituminous Binder @ 4.50% of mix and filter, transporting the hot mix to work site, laying with a hydrostatic paver finsher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tan tom rolar to achieve disired compaction as per MORTH specification clause No. 508 complete in all respect 25 mm thick using VG-30 Bitumen, 9.5-4.75mm 57per cent 4.75mm and below 4.1% filter 2%

1015

4078

4139170

... More
Supply & fixing of Speed Bumps made of heavy duty tough ABS size 250 mm length, 350 mm width & 45 mm height the ABS shall be with high resistance wear & tear property with UV stabilized yello and black combination fitted with highly reflective reflectors made of PMMA (Poly Methyl Meta Acrylic) of sizes 70 mm x 23 mm of yellow color for better night time visibility the bumps shall be fixed to ground using dual method using mails (100 mm long) epoxy at base, they are able to taken load upto 40 tones as per direction of Engineer-in-charge. (P.R.)

150

5500

825000

... More
Providing and laying damp-proof course 25mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 12.5mm nominal size). (CH-7 DSR No. 2 SOR 2023-24)

406

245

99470

... More
Supply and Laying of I shaped precast Interlocking tiles of thickness 60 to 100mm (Compressive strength not less then 30Mpa and weight 4.50kg) Including 25mm thick local sand base levelling and dressing of surface to required level and slope, filling joints with local sand all complete work. (CH-20 Item No. 14 SOR 2023-24) 80 mm (Rubber molded Colured)

4670

910

4249700

... More
Cartage of 8.00 Km ballast, Kankar Coal, grit or sand including loading & unloading but excluding stacking on pucca roads: (CH-1 Item No. 1 SOR 2023-24)

1850

230

425685

... More
Providing and laying cement concrete in 1:4:8 (1 Cement : 4 Coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete, Including cost of form work. in Foundation and floors. (CH-5 Item No. 2 SOR 2023-24)

94

5625

528750

... More
Reflective Raised Pavement Markers (Cat Eye/ Road Stud) Supply and flxing of raised pavement marker with Made of Plastic body of RPIMi Road Stud shall be moulded from ASA (Acrylic Styrene Acrylonitrile) or HIPS (High-lmoact Polystyrene) or Acryloniilrile Butadien Styrene (ABS) or Any oiher suitable malerial approved by the Engineer. The Marker shall support a load of 13,635 kg tested in accordance with ASTM D4280.The Reflective panels shall consist of number of lenses containing single or dual prismatic cubes capable of providing total internal reflection of the lighl entring the lens face. Lenses shall be mouled of methyl melhecrylate conforming io ASTM D78B of equivalent The slop or retro-reflecting surface shall preferably be 35+1-5 degree to base and the area of each relro _reflecling sllrface shall not be less than 13.00 sq.cm the marker height shall not be less lhan 10 mm and shall nol exceed 20 mm & Width shall not exceed 130 mm. The base of the marker shall be flal within 1.3 mm all road studs shall be legibly marked wilh the name , lrade or other means of identification of the manufacture. epoxy lnslallations, excess adhesive around the edge of the malker, excess adheslve on the pavemenl and adhesive on the exposed surfaces of the markers shall be immedialely removed. The contractor shall submit a two year warranty for sal sfactory lleld peformance including stipulated retro-refleclance of the reflecting panel , to the Engineer . ln addition a two year warranty for salisfactory infield perfonnance of the finished road marker shall also be given by lhe conlractor who carries out the work of fixing of reflective road ma*ers. ln case the markers are displaced , damaged . gel worn out or lose their reflectivity compared lo stipulated standards , the contractor would be reqLllred to replace allsuch markers within 15 days ofthe inlimation from the Engineer. at his own cost The rate shall include all materlals, labour, T&P, transportalion, insiallation and incidentals all complete as per direction of the Engineer-in-Charge. (CH-28 Item No. 5 SOR 2023-24) RPM (wilhout shank)

2258

195

440310

... More
Providing and applying Tack Coat VG-10 bitumen using bitumen pressure distributor @ 0.30 Kg/ M2 on the prepared bituminous surface cleaned with labour and Air compnesson including cost of bitumen, aggregate, T&P labour & all taxes complete as per MORTH&H specification No.503 Analyses attached. (Analysis Rate)

35228

19

669332



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.