The PWD has issued a formal invitation for competitive bids for the Public Works Department project, for Maintenance And Repairing Of Pipeline Leakage, Washing Of Pipeline, Mtc. Of Hydrant Including Mtc. Of Sluice Valve Of Existing Dtw Schemes At Chatita Bankul Sector Within The Dws Sub-division, Rupaichari Under Rupaichari Block During 2024-25. in South Tripura, Tripura, with an estimated contract value of Rs. 11,02,067. The bid opening date for this tender is 04-03-2025 and the last date for bid submission is 17-03-2025. Interested bidders for Public Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Public Works Department - PWD Tender
Civil And Construction
Pipe Line Project
Eprocure
Opening Date4 Mar 2025
Closing Date17 Mar 2025
Tender Amount₹ 11,02,067
Costs
EMD
₹ 22,041Document Cost
₹ 1,000Tender Fee
Refer Documents
Summary
Maintenance And Repairing Of Pipeline Leakage, Washing Of Pipeline, Mtc. Of Hydrant Including Mtc. Of Sluice Valve Of Existing Dtw Schemes At Chatita Bankul Sector Within The Dws Sub-division, Rupaichari Under Rupaichari Block During 2024-25.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEDWS_59142_1Bid Award Id
ViewTender No
72/EE/DWS/DIVN/SBM/2024-25Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://tripuratenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing, fixing and laying fabricated UPVC equal tee conforming to IS : 10124 ( Part 5 ) with solvent cement conforming to IS : 14182 including testing of joints complete as per CPWD specification and direction of the Engineer - in - charge.
-
-
-
... More
v) 125 mm dia.
A) PN - 1.6
6
6662
39973
... More
Charges for fixing and laying rigid UPVC pipes jointing with couplers, solvent cement including testing of joints complete ( excluding the cost of pipes, couplers, solvent cement which are to be issued from the department free of cost and specials like bend, tees etc. which will be paid separately ) as per CPWD specification and direction of the Engineer - in - charge.
(A)Class - 3 ( working pressure 6.0 kg / cm2)
i)140 mm OD
150
41
6195
... More
ii) 110 mm OD
150
623
93480
... More
vi) 150 mm dia.
A) PN - 1.6
5
8238
41193
... More
iii) 140 mm OD
120
689
82692
... More
Providing and fixing C.I. sluice valves ( with cap ) complete with bolts, nuts, rubber insertions etc. ( the tail pieces if required will be paid separately ) as per CPWD specification and direction of the Engineer - in - charge.
-
-
-
... More
i) 80 mm dia.
A) PN - 1.6
8
4319
34558
... More
Charges for repairing of leakage in UPVC / HDPE pipe line with PVC coupler & solvent cement etc. including necessary earth excavation, backfilling of soil as required after laying of pipeline, in layers not exceeding 200 mm in depth including consolidating each deposited layer by ramming, watering etc. complete as per specification & direction of the Engineer-in-charge.
-
-
-
... More
Clearing of diposited iron inside of laid PVC pipe line (90 mm/110 mm / 140 mm) excavation trenches for 100.00 mtr laid pipe line of required width and depth at an interval of 2.00 mtr to 3.00 mtr long for every 100.00 mtr. Clearing through UPVC coil pipe and laying same with coupler and cement solvent joint (PVC coupler and solvent cement to be issued at free of cost from the department).
6000
4
27060
... More
i) 90 mm dia.
120
336
40416
... More
Charges for fixing C.I. sluice valves with cap complete with bolts, nuts, rubber insertions etc. ( the tail pieces if required will be paid separately ) as per CPWD specification and direction of the Engineer - in - charge.
-
-
-
... More
ii) 150 mm dia
3
144
434
... More
iii) 140 mm dia.
4
466
1867
... More
i) 90 mm dia.
7
298
2091
... More
i) 15 mm dia.
400
57
22920
... More
Providing and laying of flexible PVC pipe (conforming to IS:7634) complete as per specification and direction of the Engineer - in - charge (cost of earth work and fittings will be paid separately).
-
-
-
... More
i) 100 mm dia.
33
455
15041
... More
i) 100 mm dia
3
93
281
... More
ii) For pipes exceeding 90 mm dia but not exceeding 300 mm dia.
360
106
38304
... More
i)80 mm dia.
A) PN - 1.6
2
830
1661
... More
Charges for push-on ( Tyton ) joints to centrifugually ( Spun ) cast iron pipes or ductile iron pipes including testing of joints and including the cost of rubber gasket as per CPWD specification and direction of the Engineer - in - charge.
-
-
-
... More
ii) 110 mm dia.
2
174
349
... More
iii) 140 mm dia.
90
394
35532
... More
ii) 50 mm OD.
60
112
6768
... More
Charges for dismantling PVC / HDPE pipe after necessary excavation of earth including washing and stacking of pipes properly at site with all leads and lifts and backfilling of soil as required after laying of pipeline, in layers not exceeding 200 mm in depth including consolidating each deposited layer by ramming, watering etc. complete as per specification & direction of the Engineer-in-charge.
-
-
-
... More
iii) 140 x 140 mm dia.
2
818
1636
... More
i) For pipes not exceeding 90 mm dia.
940
87
82344
... More
ii) 150 mm dia.
33
469
15503
... More
i) 40 mm OD.
60
89
5388
... More
i) 90 x 90 mm dia.
5
352
1761
... More
Providing and fixing brass ferrule with C.I. cover conforming to IS : 2692 including boring and tapping the main as per CPWD specification and direction of the Engineer - in - charge.
i)15 mm nominal bore
20
382
7654
... More
i) 90 mm dia.
6
148
892
... More
Constructing masonry Chamber 90 x 90 x 100 cm, inside with brick work in cement mortar 1 : 4 ( 1 cement : 4 fine sand ) for sluice valve, with C.I. surface box 100 mm top diameter, 160 mm bottom diameter and 180 mm deep ( inside ) with chained lid and RCC top slab 1 : 2 : 4 mix ( 1 cement : 2 fine sand : 4 brick aggregate 1st class 20 mm nominal size ) necessary excavation foundation concrete 1 : 5 : 10 ( 1 cement : 5 fine sand : 10 brick aggregate 1st class 40 mm nominal size ) and inside plastering with cement mortar 1 : 3 ( 1 cement : 3 fine sand ) 12 mm thick finished with a floating coat of neat cement complete as per standard design, CPWD specification and direction of the Engineer - in - charge.
A) With 1st class bricks.
5
14128
70643
... More
iii) 140 x 90 mm dia.
5
395
1979
... More
Clearing of diposited iron inside of laid CI/DI pipe line of different dia. (150 mm/100 mm / 125 mm) and dismantling including trenching, refilling for every 100.00 mtr laid pipe line of required widht and depth, cutting for every 100.00 mtr pipe iron throug PVC coil pipe after clearing washing and laying the same with rubber gusket pipe layed joint as per direction of the Engineer-in-charge. (Pig lead will be issued by the department at free of cost but rubber gusket and other T&P will be arranged by the agency)
300
13
3984
... More
iii) 90 mm OD.
120
271
32568
... More
ii) 110 mm dia.
5
356
1782
... More
Excavating trenches of required width for pipes, cables etc. including exacavation for sockets, dressing of sides where required, ramming of bottoms, depth upto 1500 mm (slope-1 in 200) including getting out the excavated soil and backfilling of soil as required after laying of pipeline, in layers not exceeding 200 mm in depth including consolidating each deposited layer by ramming, watering etc. and disposing of surplus excavated soil with all required leads as per Chapter - 2 of CPWD specification and direction of the Engineer - in - charge. A) For UPVC pipes in new work a) In all kinds of soil
-
-
-
... More
Dismantling old C.I. / D.I. pipes including excavation and refilling trenches after taking out the pipes, breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes at site lead upto 50 metre as per CPWD specification and direction of the Engineer - in - charge.
-
-
-
... More
iv) 100 mm dia.
A) PN - 1.7
8
5561
44489
... More
i) 90 mm OD
200
558
111620
... More
Providing and fixing G.I. union as per CPWD specification and direction of the Engineer - in - charge. i) 15 mm dia.
20
131
2620
... More
Making road crossing by horizontal boring for smooth laying of UPVC / CI / DI / GI pipes etc. of required dia complete as per specification and the direction of the Engineer-in-charge. i) By manual means
30
619
18579
... More
ii) 140 x 110 mm dia.
3
426
1280
... More
iii) 32 mm dia.
150
83
12495
... More
iv) 110 mm OD.
210
372
78141
... More
ii)150 mm dia.
A) PN - 1.6
1
1597
1597
... More
Providing, fixing and laying fabricated UPVC straight reducer conforming to IS : 10124 ( Part 3 ) with solvent cement conforming to IS : 14182 including testing of joints complete as per CPWD specification and direction of the Engineer - in - charge.
-
-
-
... More
Providing and fixing G.I. Bend /elbow in the pipe line including testing of joints complete as per CPWD specification and direction of the Engineer - in - charge.
40
131
5240
... More
Providing, fixing and laying rigid UPVC pipes conforming to IS: 4985 jointing with couplers, of same class conforming to IS :10124 ( Pt-II ) with solvent cement conforming to IS : 14182 including testing of joints complete ( but excluding the cost of specials like bend, tees etc. which will be paid separately ) as per CPWD specification and direction of the Engineer - in - charge. A. Class - 3 ( working pressure 6.0 kg / cm2)
-
-
-
... More
Providing and fitting fixing PVC / plastic bib cock conforming to IS : 9763 in hydrant points at different location as per specification & direction of the Engineer-in-charge. i)15 mm dia. PVC /plastic bib cock
20
119
2388
... More
ii) 25 mm dia.
150
74
11205
... More
Providing and fixing C.I non-return valve of approved quality as per of CPWD specification and direction of the Engineer- in- charge.
i) 100 mm dia.
8
7504
60039
... More
ii) 110 mm dia.
90
360
32400
... More
Providing, fixing and laying fabricated UPVC end cap conforming to IS : 10124 ( Part 4 ) with solvent cement conforming to IS : 14182 including testing of joints complete as per CPWD specification and direction of the Engineer - in - charge.
-
-
-