Municipal Corporation Tender
... More
The NMCN has issued a formal invitation for competitive bids for the Municipal Corporation project, for Asphalting Of Road At Govind Nagar Main Road No 1 Mandar Krupa Society At Mouza Narsala In Pr No 29 in Nagpur, Maharashtra, with an estimated contract value of Rs. 53,92,885. The bid opening date for this tender is 28-11-2024 and the last date for bid submission is 23-12-2024. Interested bidders for Municipal Corporation tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Municipal Corporation - NMCN Tender
Civil And Construction
Road Construction
Eprocure
Opening Date28 Nov 2024
Closing Date23 Dec 2024
Tender Amount₹ 53,92,885
Costs
EMD
₹ 54,000Document Cost
₹ 1,180Tender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_NMCN_1118539_1Bid Award Id
ViewTender No
45/2024-25/DPDCTender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.nmcnagpur.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Open Graded Premix Surfacing- Providing and Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site with VTS, laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction but excluding prime / tack and Seal coat. For Bitumen of specified grade-- USING drum mix type hot mix plant with SCADA, Paver and Vibratory roller ( Over MPM Surface) (VG-30 bulk bitumen rates are considered to arrive at rates)
5156.25
240
1241315.63
... More
Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge
2
10461
20922
... More
Providing and constructing 75 mm. thick Modified Penetration
Macadam (MPM) road surface including all materials, preparing the
existing road surface, spreading 40 mm. stone metal layers 100%
crusher broken metal with conical crusher plant heating and spraying
the bitumen of specified grade @ 2 Kilogram/Square Metre,
spreading 12 mm.size chips compacting with three wheel static roller
having weight 8 to 10 MT. to achive the desired degree of compaction
as per Technical Specification Clause 506 etc. complete. Including
picking of existing WBM surface. (VG-30 bulk bitumen rates are
considered to arrive at rates)
515.56
384
197975.04
... More
Providing selected hard murum filling including laying in layers of 15 to 20cmwith watering and compacting etc. complete.
412.52
1290
532149.51
... More
Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.5 Kilogram/10 Square Metre.(VG-30 bulk
bitumen rates are considered to arrive at rates)
10312.5
21
216562.5