Rural Development And Panchayat Raj Department Tender
... More
The RDPR has issued a formal invitation for competitive bids for the Rural Development And Panchayat Raj Department project, for Upgrdataion/strengthening Of The Road 4 No At Singampunari Block In Sivagangai District in Sivaganga, Tamil Nadu, with an estimated contract value of Rs. 1,55,70,000. The bid opening date for this tender is 29-05-2025 and the last date for bid submission is 05-06-2025. Interested bidders for Rural Development And Panchayat Raj Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Road Construction
Eprocure
Opening Date29 May 2025
Closing Date5 Jun 2025
Tender Amount₹ 1,55,70,000
Costs
EMD
₹ 1,56,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_RDTN_563021_1Bid Award Id
ViewTender No
Mgsmt_2025-26_Pkg_20_Re_TenderTender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.inPackage Tenders
Mgsmt_2025-26_Pkg_21_Re_Tender
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
20.25
-
-
... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
213.75
-
-
... More
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per 10.00 square meter over the WMM surface preparatory to another bituminous construction over it.
1425
-
-
... More
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
1425
-
-
... More
Providing and laying Bituminious concrete to 30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
35.63
-
-
... More
Provision for HM stones
2
-
-
... More
Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms per sqm area thickness of the finished surface to level uniform and free from streaks and holes etc.,complete as per MORT &h specification No.803
1
-
-
... More
Providing and erecting of Retro - Reflectorised Cautionary Mandatory and informatory signs
1
-
-
... More
Thittasevalpatti road Km 0/0- 0/5
-
-
-
... More
Existing BT surface picking including cost and conveyance of all Laboue Charges to site etc., complete.
997.17
-
-
... More
Clearing and grubbing Scrub jungle road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
473.52
-
-
... More
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
142.06
-
-
... More
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
34.4
-
-
... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
229.99
-
-
... More
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per 10.00 square meter over the WMM surface preparatory to another bituminous construction over it.
1533.25
-
-
... More
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
1533.25
-
-
... More
Providing and laying Bituminious concrete to 30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
38.33
-
-
... More
Provision for HM stones
2
-
-
... More
Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms per sqm area thickness of the finished surface to level uniform and free from streaks and holes etc.,complete as per MORT &h specification No.803
1
-
-
... More
Providing and erecting of Retro - Reflectorised Cautionary Mandatory and informatory signs
1
-
-
... More
Provision for Pipe culvert
-
-
-
... More
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 20B
67.45
-
-
... More
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
8.8
-
-
... More
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
14.95
-
-
... More
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.(Below Ground level)
97.48
-
-
... More
Supply of NP3 900mm dia RCC pipe collar
7.5
-
-
... More
Supply of NP3 900mm dia RCC pipe collar
7.5
-
-
... More
Collection and supply of gritty gravel from approved quarry including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
14.18
-
-
... More
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete
5.63
-
-
... More
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete
32.76
-
-
... More
Madurai devakottai road to Saralaikarai road Km 0/0 - 0/6
-
-
-
... More
Existing BT surface picking including cost and conveyance of all Laboue Charges to site etc., complete.
1216.67
-
-
... More
Clearing and grubbing Scrub jungle road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
720
-
-
... More
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
270
-
-
... More
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
54
-
-
... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
273.75
-
-
... More
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per 10.00 square meter over the WMM surface preparatory to another bituminous construction over it.
1825
-
-
... More
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
1825
-
-
... More
Providing and laying Bituminious concrete to 30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
45.63
-
-
... More
Provision for HM stones
3
-
-
... More
Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms per sqm area thickness of the finished surface to level uniform and free from streaks and holes etc.,complete as per MORT &h specification No.803
1
-
-
... More
Providing and erecting of Retro - Reflectorised Cautionary Mandatory and informatory signs
1
-
-
... More
Eriyur - Valayapatti road to Kalungupatti road Km 0/0 - 2/0
-
-
-
... More
Existing BT surface picking including cost and conveyance of all Laboue Charges to site etc., complete.
2252.75
-
-
... More
Clearing and grubbing Scrub jungle road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
2880
-
-
... More
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
973.19
-
-
... More
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
-
-
-
... More
Km 0/0 - 1/0
100.99
-
-
... More
Km 1/0 - 2/0
115.63
-
-
... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
-
-
-
... More
Km 0/0 - 1/0
473.4
-
-
... More
Km 1/0 - 2/0
540.34
-
-
... More
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per 10.00 square meter over the WMM surface preparatory to another bituminous construction over it.
-
-
-
... More
Km 0/0 - 1/0
3156
-
-
... More
Km 1/0 - 2/0
3602.25
-
-
... More
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
-
-
-
... More
Km 0/0 - 1/0
3737.25
-
-
... More
Km 1/0 - 2/0
3624.75
-
-
... More
Providing and laying Bituminious concrete to 30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
-
-
-
... More
Km 0/0 - 1/0
93.43
-
-
... More
Km 1/0 - 2/0
90.62
-
-
... More
Provision for HM stones
8
-
-
... More
Provision for KM stones
2
-
-
... More
Providing and fixing 20mm thick compressible fibre board in expansion joint
-
-
-
... More
Hard bed 580m
7.65
-
-
... More
km 0/0-1/0 CH 820m
3.6
-
-
... More
km 1/0-2/0 CH 1250 m
3.6
-
-
... More
Providing and fixing Tar paper including labour etc.,completed
-
-
-
... More
km 0/0-1/0 CH 820m
4.5
-
-
... More
km 1/0-2/0 CH 1250 m
4.5
-
-
... More
Providing and erecting of Retro - Reflectorised Cautionary Mandatory and informatory signs
3
-
-
... More
Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms per sqm area thickness of the finished surface to level uniform and free from streaks and holes etc.,complete as per MORT &h specification No.803
3
-
-
... More
Providing and fixing weepholes of 100mm dia PVC pipes of Required length including all cost and conveyance etc., complted
-
-
-
... More
km 0/0-1/0 CH 820m
9.6
-
-
... More
km 1/0-2/0 CH 1250 m
9.6
-
-
... More
Provision for RCC Deck slab culvert
-
-
-
... More
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 20B
-
-
-
... More
Hard bed 580m
22.5
-
-
... More
retaining wall @740m
24.57
-
-
... More
km 0/0-1/0 CH 820m
83.39
-
-
... More
km 1/0-2/0 CH 1250 m
83.39
-
-
... More
Cement Concrete 1:2:4 mix using20mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
38.25
-
-
... More
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
-
-
-
... More
retaining wall @740m
2.73
-
-
... More
km 0/0-1/0 CH 820m
10.5
-
-
... More
km 1/0-2/0 CH 1250 m
10.5
-
-
... More
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
-
-
-
... More
retaining wall @740m
31.19
-
-
... More
km 0/0-1/0 CH 820m
80.29
-
-
... More
km 1/0-2/0 CH 1250 m
80.29
-
-
... More
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.(Below Ground level)
-
-
-
... More
Hard bed 580m
9
-
-
... More
retaining wall @740m
113.97
-
-
... More
km 0/0-1/0 CH 820m
154.36
-
-
... More
km 1/0-2/0 CH 1250 m
154.36
-
-
... More
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.(Above Ground level)
-
-
-
... More
km 0/0 - 1/0 CH 820m
32.29
-
-
... More
km 1/0 - 2/0 CH 1250m
32.29
-
-
... More
RCCement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete
-
-
-
... More
km 0/0 - 1/0 CH 820m
3.54
-
-
... More
km 1/0 - 2/0 CH 1250m
3.54
-
-
... More
Collection and supply of gritty gravel from approved quarry including all cost and conveyance etc.,conveyane etc.,complted
-
-
-
... More
Hard bed 580m
2.7
-
-
... More
km 0/0 - 1/0 CH 820m
46.74
-
-
... More
km 1/0 - 2/0 CH 1250m
46.74
-
-
... More
Supply and fabrication of steel
-
-
-
... More
km 0/0 - 1/0 CH 820m
0.48
-
-
... More
km 1/0 - 2/0 CH 1250m
0.48
-
-
... More
RCC 1:1.5:3 mix using 20mm HBGS metal including all cost and conveyance etc.,completed
-
-
-
... More
km 0/0 - 1/0 CH 820m
4.68
-
-
... More
km 1/0 - 2/0 CH 1250m
4.68
-
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements