Tribal Welfare Engineering Department Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
309743Tender No
SE/TW/WGL/NIT/PACKAGE/01/2022-2023, Dt: 04.04.2022Tender Authority
Tribal Welfare Engineering Department ViewPurchaser Address
-Website
http://tender.telangana.gov.inPackage Tenders
SE/TW/WGL/NIT/PACKAGE/07/2022-2023, Dt: 25.04.2022SE/TW/WGL/NIT/Package/23/2022-2023, Dt: 04.06.2022SE/TW/WGL/NIT/Package/30/2022-2023, Dt:24.06.2022...more
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
CIVIL WORK;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter provision ? (only 2-glass shutters) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (80 mm x 52 mm) / (94 mm x 45 mm) x 2.20 mm for outer frames, (54 mm x 38 mm)/(39 mm x 58 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0 / 1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing / deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.
8.64
-
62785
... More
CIVIL WORK;Supply and fixing of MS Grill with outer angular frame of rolled steel equal angle of ISA 2525 of size 25mm x 25mm x 4mm, welded with safety bars of 10mm square rods at 150mm centre to centre horizontally and vertically including red oxide primer of grade-I quality, sales and other taxes, cost and conveyance of all materials to site, all labour charges and fixing in position etc., complete for finished item of work.
10
-
16150
... More
CIVIL WORK;Providing and fixing factory made solid Wood Polymer Composite (WPC) Single Extruded Door frame section of 100*65MM with encapsulation of 6MM rigid layer on all external surfaces. The Door frame will have a rabata of 32mm/37mm. The two verticla members are to be joined together with the horizontal member using 8x75MM Long MS Star full thread screws to be used with revers forward spreed control hand drilling machine. The ready/ Assembled door frame is fixed to wall using/ Z hand fast 300mm long hold fast.
5
-
3994
... More
CIVIL WORK;Dadooing to walls with glazed red or white full body ceramic wall tiles of size 200 x 300 mm / 245 mm x 325 mm and thickness 6 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, any brand as approved by Engineer - in - charge and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, etc. to site, seigniorage charges, sales and other taxes on all materials, and all opertional, incidental and all labour charges such as mixing of cement mortar, laying in position, curing, lift charges etc., complete for finished item of work in all floors
66.6
-
38695
... More
CIVIL WORK;Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs of makes Jhonson & Jhonson, Kajaria, Nitco and Marbonite, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work.
12
-
10754
... More
CIVIL WORK;Ceiling Plastering 12mm thick single Coat with CM (1:3) Prop: including cost and conveyance of all materials like cement, sand, water etc., to site,, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) excluding seignerage & GST charges
100
-
20352
... More
CIVIL WORK;Plastering to even surfaces of wall with CM (1:4) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site,, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) excluding seignerage & GST charges
9
-
1597
... More
CIVIL WORK;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., for Even Surfaces of brick wall complete for finished item of work. (APSS 901,903 & 904) Ground Floor
9
-
4416
... More
CIVIL WORK;Brick Masonry in superstructure with CM (1:8) prop: using second class bricks of size 23 x 11 x 7 Cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work..
2.07
-
16488
... More
CIVIL WORK;Supply and Fixing of CI Steps for Septic Tank / Manhole complete for finished item of work including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work.
5
-
421
... More
CIVIL WORK;Supply and Fixing of 914.4mm x 457.2mm Light Weight CI Manhole Frame and Cover (30 Kgs) complete for finished item of work including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work .
2
-
5124
... More
CIVIL WORK;Supply and fixing of C.I.(spun)soil waste and ventilating pipe of 3.00 Mt length of 100mm dia with double socket including Cost and conveyance of all materials to site and all albour charges for all operations etc., complete for finished item of work for vent over septic tank
1
-
2469
... More
CIVIL WORK;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lapsplicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, laour charges such as cutting, bending placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors. (APSS No.126) of TATA, SAIL, VSP, JINDAL & SHYAM STEEL
0.7
-
65974
... More
CIVIL WORK;Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including centering, shuttering, laying concrete, curing etc. complete for Roof slab 125mm thick
9
-
12645
... More
CIVIL WORK;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work
35
-
18395
... More
CIVIL WORK;Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including centering, shuttering, laying concrete, vibrating, curing etc. complete, excluding seignerage & GST charges for Side Walls of 150mm thick
24
-
112870
... More
CIVIL WORK;Plain Cement Concrete M15 grade nominal mix (1:2.5:5) proportion (cement: fine aggregate: Coarse aggregate) using 40mm, 20mm, 10mm size Hard Broken Granite (IS383, 1970) Machine Crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing concrete in Concrete Mixer, laying, curing concrete, etc., complete for finished item of work (APSS No. 402) for Septic tank
1
-
6185
... More
CIVIL WORK;Plain Cement Concrete (1:5:10) proportion (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Broken Granite (IS383, 1970) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, mixing concrete in concrete mixer, sales & other taxes on all materials, all operational, incidental, and labour charges such as laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work (APSS No. 402), excluding seignerage & GST charges for Levelling Course and Flooring Bed
1
-
5043
... More
CIVIL WORK;Earth work excavation for Septic tank and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, seniorage charges, labour charges such as shoring ,sheeting, planking, strutting, dewatering and back filling etc. for finished item of work as per SS - 20 B (APSS 308).
30
-
7601
... More
CIVIL WORK;S&F premium make CPVC Pipes of 28.60mm OD Pipe - SDR 13.5 including cost and conveyance of all materials and labour charges , Overheads & Contractors profit complete for finished item of work for all floors.
200
-
60900
... More
CIVIL WORK;Supplying and fixing 580mm x 440mm long Orissa pan white glazed Water Closet 1st quality ISI marked confirming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware / Parryware / Neycer with brick - ISI mark and providing masonry seat, CC squatting plate and 10 litres capacity single flush PVC low level cistern Parryware or equivalent with internal components fixed on 2 Nos. of teak wood blocks of size 76.20mm x 101.60mm using required size of nails, screws as approved by Engineer-in-charge , CP long bend , 12.70mm PVC connection with brass union nuts CP coated , 31.75mm brass plumber union , 12.70mm NP bib tap 400 gms Seiko or equivalent , P trap or S trap of Indian W.C. shall be encased on CC (1:2:4) 150mm alround well above the joint to stop leakage at the joint etc., complete including cost and conveyance of all materials to site, cost of CC bed, labour charges and seigniorage charges , Overheads & Contractors profit etc., complete for finished item of work.
12
-
31712
... More
CIVIL WORK;Providing and placing on terrace (at all floor levels)polyetheylene water storage tank with double layer approved brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and over flow pipes but without fittings and base support for tanks including cost and conveyance of all materials and labour charges , Overheads & Contractors profit complete for finished item of work.
5000
-
45500
... More
CIVIL WORK;Supplying & fixing tested Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type - make or equivalent screwed type 1st quality of approved type including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work for All Floors. for 15mm Nominal Bore
12
-
8835
... More
CIVIL WORK;Supplying & fixing GI pipe Medium Grade properties & weight as per IS 1239 ISI mark in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chiselling masonry walls and making good the walls & floors to the original surface and fixing MS clamps on TW blocks on walls including cost and conveyance of all materials and labour charges , Overheads & Contractors profit complete for finished item of work. for 32mm Nominal bore
215
-
95514
... More
CIVIL WORK;Supplying & fixing GI pipe Medium Grade properties & weight as per IS 1239 ISI mark in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chiselling masonry walls and making good the walls & floors to the original surface and fixing MS clamps on TW blocks on walls including cost and conveyance of all materials and labour charges , Overheads & Contractors profit complete for finished item of work. for 25mm Nominal bore
50
-
15965
... More
CIVIL WORK;Supplying & fixing GI pipe Medium Grade properties & weight as per IS 1239 ISI mark in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chiselling masonry walls and making good the walls & floors to the original surface and fixing MS clamps on TW blocks on walls including cost and conveyance of all materials and labour charges , Overheads & Contractors profit complete for finished item of work. for 20mm Nominal bore
50
-
12215
... More
CIVIL WORK;Supplying & fixing GI pipe Medium Grade properties & weight as per IS 1239 ISI mark in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chiselling masonry walls and making good the walls & floors to the original surface and fixing MS clamps on TW blocks on walls including cost and conveyance of all materials and labour charges , Overheads & Contractors profit complete for finished item of work. for 15mm Nominal bore
50
-
10565
... More
CIVIL WORK;Supplying & Fixing of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931 including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work for All Floors.
40
-
11362
... More
CIVIL WORK;Supplying and fixing of 25.4mm dia , 609.6mm long aluminium anodized towel rods with brackets and aluminium screws including cost and conveyance of all materials, labour charges , Overheads & Contractors profit for finished item of work.
16
-
3054
... More
CIVIL WORK;Supplying and fixing TV shape mirror with plastic frame size 609.6 x 457.20mm including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work for All Floors.
3
-
1779
... More
CIVIL WORK;Supplying and fixing Ceramic Soap Dish duly embedded in the Brick Masonry wall complete for finished item of work for all floors, including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work for All Floors.
16
-
2727
... More
CIVIL WORK;Supplying and fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 of size 550mm x 400mm with 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/Senior/Nice/ Esso or equivalent complete with standard CI brackets including wooden blocks ,1 No.12.70mm PVC connection with brass union nuts CP coated , 1 No.12.70mm NP bib tap 400 gms Seiko or equivalent , 31.75mm dia. PVC flexible waste pipe 914.4mm length of 1st quality including cost and conveyance of all materials to site, labour charges , Overheads & Contractors profit for finished item of work
6
-
16947
... More
CIVIL WORK;Supplying and fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-2004 of white glazed with 'S' trap,supplying and fixing best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996 etc., complete for finished item of work for all floors.
6
-
13150
... More
CIVIL WORK;Supplying & fixing CI Floor traps 1st quality ISI marked conforming to IS:1729-1979 with C.P. Grating fixing with white cement as per site requirements with standard practice 100 mm dia Inlet- 75 mm (3") outlet pipe - 4 Kgs with N.P. Cover for all floors, including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work. (APSS No 1326) for All Floors.
35
-
14555
... More
CIVIL WORK;Supplying and fixing 150.00mm x 100.00mm SWG gully trap conforming to ISI 651 & 4127 with CI grating and constructing brick masonry intermediate chamber in CM (1:6) prop. and fitted with RCC cover 3" thick as directed by Engineer-in-charge including cost and conveyance of all materials to site, labour charges , Overheads & Contractors profit etc., complete for finished item of work.
35
-
27559
... More
CIVIL WORK;Constructing 457.2mm x 457.2mm ( 1'-6" x 1'-6") brick in CM (1:6) prop. Masonry inspection chamber upto 914.4mm (3'-0") and fitted with light weight 457.2mm x 457.2mm ( 1'-6" x 1'-6") C.I. frame and cover of 20Kg. including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work.
10
-
48548
... More
CIVIL WORK;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing, sales and other taxes on all materials etc., complete for finished item of work. (A.P.S.S. No. 1325).
10
-
89018
... More
CIVIL WORK;Supplying, laying, jointing and testing 152.4 mm SWG pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM 1.5:1 prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 914.4 mm(3'0") depth and refilling with watering and tamping including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work. (A.P.S.S.No. 1301 & 1318)
200
-
160660
... More
CIVIL WORK;Supplying, laying, jointing and testing 101.6 mm SWG pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM 1:5:1 prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) upto 914.4 mm (3'0") depth and refilling with watering and tamping including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work. (A.P.S.S.No. 1301 & 1318)
50
-
26985
... More
CIVIL WORK;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter provision ? (only 2-glass shutters) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (80 mmx 52 mm)x / (94 mm x 45 mm) x 2.20 mm for outer frames,(54 mmx 38 mm) / (39 mmx 58 mm)x 2.20 mm for sliding shutter frames capable of mouting single glazing system,structurally reinforced with hot dip galvanized upto 50 microns of minimum thickness of 1.0 / 1.2 mm prefabricated & welded through fusion welding.The window sash shall be fitted with 5 mm thick clear fioat glass of co-extruded with Grey colour soft PVC.System shall have single point locking with Tuoch Lock and the system is to be installed at the site using anchors fasteners,sillicon rubber sealant, easy glazing / deglazing at site etc., including cost conveyance of all materials,accessories,labour charges for transportation,erection at site complete for finished.
4.5
-
32701
... More
CIVIL WORK;Providing and applying synthetic plaster putty or equivalent putty such as birla wall care putty or texture paint or equivalent such as NCL/Saicoat texture paint of average 1 to 2mm thickness over plastered surface to prepare the surface even and smooth aftr thoroughly brushing the furface, clean and wipe off loose dust, applying putty/texture paint filler by putty knife /muslin pad, air dry for 2-3 hrssand with180-320 no emerny paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental labour charges etc. complete for finished item of work external wall excluding cost of access scaffolding.
201.96
-
47451
... More
CIVIL WORK;Painting to New Iron work two coats of ready mixed Synthetic Enamel paints in all shades Grade- I having VOC (Volatile Organic Compound) content less than 50 grams/ liter first quality all shades to give an even shade over base coatef wood primer finishing wall putty for red oxide primer Grade -1 making three (3) caots in all given shade after throughly brushing the surface to remove all dirt and remains of loose powerd materials, including cost conveyance of all materials to site, sales & other taxes, all incidental operational and labour charges etc., complete fof finished item of work (3 coats) (APSS No 1201 1207 & 1212) in all floors.
137
-
16249
... More
CIVIL WORK;Painting to Old internal walls with two (2) coats of ready mixed oil bound washable distemper acrylic base of approved brand and shade over a base coat of cement primer water base interior Grade-I of approved brand, makind three (3) coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work in all floors for Old internal walls (SS 911)
4362.57
-
528329
... More
CIVIL WORK;Painting to Old External Walls with two coats of Polymer Plastic Emulsion paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as approved by the Engineer - in - Charge over base coat of cement primer water base grade -II exterior making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for Old external Walls.(APSS No. 911)
2718.11
-
490360
... More
CIVIL WORK;Painting to Old wood work two coats of ready mixed Synthetic Enamel paints in all shades Grade- I having VOC (Volatile Organic Compound) content less than 50 grams/ liter first quality all shades to give an even shade over base coatef wood primer finishing wall putty for wood work after throughly brushing the surface to remove all remains including cost conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete fof finished item of work (3 coats) (APSS No 1201 1212 in all floors.
453.36
-
57298