Balrampur Tender Results

Balrampur Tender Results

Public Health Engineering Department - PHED Tender Result

Civil And Construction...+1Water Storage And Supply
Result Stage: Under Evaluation
Balrampur, Uttar Pradesh
Construction, Testing And Commissioning Of R.c.c. Elevated Service Reservoir Of 90 Kl Capacities – 01no. 15m Staging & 40 Kl Of Sump Well – 01no. / { Steel Structure 12 M Height & 10 Kl (5000l X 2no.)} Of 05 Nos. Pe Tank & Elevated Service Reservoirs Of Rcc Staging And Hdpe Slim Tank Of Capacity 5000 Ltr Of 00 No. 9 Mtr Staging (with Switch Room Of Size 1.8mx1.8mx3m) And 10000ltr Of 05 No. 12 Mtr Staging. Including Providing And Fixing Of Ci Double Flange Pipe, Double Flange Specials & Di Double Flange Soft Seated Sluice Valve Including Construction Of Suitable R.c.c. Valve Chamber Providing, Laying, Jointing, Interconnection, Testing And Commissioning Of Rising Main Upvc Class 10 Kg/sqcm 90 Mm Dia 00 M & Hdpe 75 Mm Dia 8358 M & 63 Mm Dia 2305 M., Distribution Upvc Class 6kg/sqcm 90mm Dia. 957 M., 110 Mm Dia. 875 M., 140 Mm Dia. 345 M. 160 Mm Dia. 210 M.& Distribution Hdpe Class 6kg/sqcm 63 Mm Dia. 13481 M., 75 Mm Dia. 6276 M.with Suitable Joints Gi Pipe, Valve, Specials And All Fittings Including All Allied Civil Works, Supplying & Installation Of Energy Taging N Five Star Bee Rating Isi Marked Required Capacity Single Phase / Three Phase, 50 Hz, 220v,, Deep Well Submersible Pump Stainless Steel Body, Suitable For 4”/6” Tube Well With Contral Panel Starter Suitable For Submersible Pump With Dry Run Protection, Connections, Including Clamps, Bore Cap Etc. As Required As Per Specifications Butexcludingpipe,ss/nylonwireropeandconnection Cable Including Verification Of Tubewell Yield& Electric Connection From Cspdcl, Construction Of Brick Masonry Switch Room, Construction Of Boundary Wall Around The Over Head Tank, Installation Of Electro Chlorinator , Construction Of Chlorinator Room Of Providing Functional Household Tap Connection (f.h.t.c. 666 ) In Individual Households And Government Instiution Etc. Complete With Trial Run Of 03 Months After That O&mof 06 Months Under Piped Water Supply Scheme Under Jal Jeevan Village – Kanjiya (pathaltoli), Kanjiya (tongripara), Kanjiya (jirhulpara), Kanjiya (baheratoli, Khaspara, Marpara,roadpara, Schoolpara), Khajuri (lechopara, Miyanpara, Turripani), Block- Kusmi, District – Balrampur(c.g.)
Contract DateNA
Contract AmountRefer Documents 

Public Health Engineering Department - PHED Tender Result

Civil And Construction...+1Water Storage And Supply
Result Stage: Under Evaluation
Balrampur, Uttar Pradesh
Providing, Laying, Jointing, Interconnection, Testing And Commissioning Of 63 Mm Dia To75 Mm Hdpe0mtr , Pn-6 Pipe16230mtr Length&90 Mm Diato 150 Mm Diahdpe Class 06 To 10 Kg/sqcm With Suitable Joints Length 2985mtr All Fitting, Valve Specials, Yield Test7, Tw7, Pp7, Fabricated Steel Ohr 10/12mtr Staging3, Fhtc 461, Electricity11, Pump House6, Electro Chlorinator1, Chlorinator Room1, Bw1job, Complete With Trial Runsix Month And Operation &maintanance For 06 Months Under Retrofitting/svs Of Piped Water Supply Scheme Under Jal Jeevan Mission For Harri Block Kusmi, District – Balrampur.
Contract DateNA
Contract AmountRefer Documents 

Public Health Engineering Department - PHED Tender Result

Civil And Construction...+1Water Storage And Supply
Result Stage: Under Evaluation
Balrampur, Uttar Pradesh
Construction, Testing And Commissioning Of R.c.c. Elevated Service Reservoir Of 00 Kl Capacities & Staging 00 Mtr / { Steel Structure 12 M Height & 10 Kl (5000l X 2no.)} Of 1 Nos. Pe Tank. Including Providing And Fixing Of Ci Double Flange Pipe, Double Flange Specials & Di Double Flange Soft Seated Sluice Valve Including Construction Of Suitable R.c.c. Valve Chamber Providing, Laying, Jointing, Interconnection, Testing And Commissioning Of Rising Main Upvc Class 10 Kg/sqcm 90 Mm Dia 00 M & Hdpe 75 Mm Dia 600 M & 63 Mm Dia 00 M .,distribution Upvc Class 6kg/sqcm 90mm Dia. 00 M., 110 Mm Dia. 00 M., 140 Mm Dia. 00 M. 160 Mm Dia. 00 M.& Distribution Hdpe Class 6kg/sqcm 63 Mm Dia. 2732 M., 75 Mm Dia. 895 M.with Suitable Joints Gi Pipe, Valve, Specials And All Fittings Including All Allied Civil Works, Supplying & Installation Of Energy Efficiant Five Star Bee Rating Isi Marked Required Capacity Single Phase / Three Phase, 50 Hz, 220v,, Deep Well Submersible Pump Stainless Steel Body, Suitable For 4"/6" Tube Well With Contral Panel Starter Suitable For Submersible Pump With Dry Run Protection, Connections, Including Clamps, Bore Cap Etc. As Required As Per Specifications Butexcludingpipe,ss/nylonwireropeandconnection Cable Including Verification Of Tubewell Yield& Electric Connection From Cspdcl, Construction Of Brick Masonry Switch Room, Construction Of Boundary Wall Around The Over Head Tank, Installation Of Electro Chlorinator , Construction Of Chlorinator Room Of Providing Functional Household Tap Connection (f.h.t.c. 21 ) In Individual Households And Government Instiution Etc. Complete With Trial Run Of 03 Months After That O&m Of 06 Months Under Piped Water Supply Scheme Under Jal Jeevan Mission For Village-jamdi (bagichapara), Block-shankargarh, District-balrampur (c.g.)
Contract DateNA
Contract AmountRefer Documents 

Public Health Engineering Department - PHED Tender Result

Civil And Construction...+1Water Storage And Supply
Result Stage: Under Evaluation
Balrampur, Uttar Pradesh
- Providing, Laying, Jointing, Interconnection, Testing And Commissioning Of 63 Mm Dia To75 Mm Hdpe0mtr , Pn-6 Pipe12775mtr Length&90 Mm Diato 150 Mm Diahdpe Class 06 To 10 Kg/sqcm With Suitable Joints Length615mtrall Fitting, Valve Specials, Yield Test4,tw0, Pp3, Fabricated Steel Ohr 10/12mtr Staging3, Fhtc 245, Electricity2, Pump House 3, Electro Chlorinator0, Chlorinator Room 0, Bw0job, Complete With Trial Runsix Month And Operation &maintanance For 06 Months Under Retrofitting/svs Of Piped Water Supply Scheme Under Jal Jeevan Mission For Village Indarpur Block Ramchandrapur,district – Balrampur.
Contract DateNA
Contract AmountRefer Documents 

Public Health Engineering Department - PHED Tender Result

Civil And Construction...+1Water Storage And Supply
Result Stage: Under Evaluation
Balrampur, Uttar Pradesh
Construction, Testing And Commissioning Of R.c.c. Elevated Service Reservoir Of 00 Kl Capacities – 00 No.& Staging 15 Mtr / {steel Structure 12 M Height & 10 Kl(5000l X 2no.)} Of 04 Nos. Pe Tank& Elevated Service Reservoirs Of Rcc Staging And Hdpe Slim Tank Of Capacity 5000 Ltr Of 02 No. 9 Mtr Staging(with Switch Room Of Size 1.8mx1.8mx3m) And 10000 Ltr Of 00 No. 12 Mtr Staging. Including Providing And Fixing Of Ci Double Flange Pipe, Double Flange Specials & Di Double Flange Soft Seated Sluice Valve Including Construction Of Suitable R.c.c. Valve Chamber. Providing, Laying, Jointing, Interconnection, Testing And Commissioning Of Rising Main Upvc Class 10 Kg/sqcm 90 Mm Dia 00 M & Hdpe 75mm Dia 00 M & 63 Mm Dia 2698 M.,distribution Upvc Class 6kg/sqcm 90mm Dia. 00 M., 110 Mm Dia. 00m., 140 Mm Dia. 00 M. 160 Mm Dia. 00 M.& Distribution Hdpe Class 6kg/sqcm 63 Mm Dia. 4386 M., 75 Mm Dia. 2651 M.with Suitable Joints Gi Pipe, Valve, Specials And All Fittings Including All Allied Civil Works, Supplying & Installation Of Energy Taging N Five Star Bee Rating Isi Marked Required Capacity Single Phase / Three Phase, 50 Hz, 220v,, Deep Well Submersible Pump Stainless Steel Body, Suitable For 4”/6” Tube Well With Contral Panel Starter Suitable For Submersible Pump With Dry Run Protection, Connections, Including Clamps, Bore Cap Etc. As Required As Per Specifications Butexcludingpipe,ss/nylonwireropeandconnection Cable Including Verification Of Tubewell Yield& Electric Connection From Cspdcl, Construction Of Brick Masonry Switch Room, Construction Of Boundary Wall Around The Over Head Tank, Installation Of Electro Chlorinator , Construction Of Chlorinator Room Of Providing Functional Household Tap Connection (f.h.t.c. 138 ) In Individual Households And Government Instiution Etc. Complete With Trial Run Of 03 Months After That O&mof 06 Months Under Piped Water Supply Scheme Under Jal Jeevan Mission For Village–lefari (jampara,uraonpara ), Lefari (khaspara), Lefari (purvtola, Schoolpara ), Block- Balrampur, District – Balrampur(c.g.)
Contract DateNA
Contract AmountRefer Documents 

Public Health Engineering Department - PHED Tender Result

Civil And Construction...+1Water Storage And Supply
Result Stage: Under Evaluation
Balrampur, Uttar Pradesh
Construction, Testing And Commissioning Ofr.c.c. Elevated Service Reservoir Of 50 Kl Capacities – 01 No.& Staging 12mtr/ { Steel Structure 12 M Height & 10 Kl (5000l X 2no.)} Of 02 Nos. Pe Tank& Elevated Service Reservoirs Of Rcc Staging And Hdpe Slim Tank Of Capacity 5000ltr Of 00 No. 9 Mtr Staging(with Switch Room Of Size 1.8mx1.8mx3m) And 10000ltr Of 00 No. 12 Mtr Staging. Including Providing And Fixing Of Ci Double Flange Pipe, Double Flange Specials & Di Double Flange Soft Seated Sluice Valve Including Construction Of Suitable R.c.c. Valve Chamber. Providing, Laying, Jointing, Interconnection, Testing And Commissioning Of Rising Main Upvc Class 10 Kg/sqcm 90 Mm Dia00 M & Hdpe 75mm Dia800 M & 63 Mm Dia300 M.,distribution Upvc Class 6kg/sqcm 90mm Dia. 3331 M., 110 Mm Dia. 375 M., 140 Mm Dia. 00 M. 160 Mm Dia. 00 M.& Distribution Hdpe Class 6kg/sqcm 63 Mm Dia. 1456 M., 75 Mm Dia. 331m.with Suitable Joints Gi Pipe, Valve, Specials And All Fittings Including All Allied Civil Works, Supplying & Installation Of Energy Taging N Five Star Bee Rating Isi Marked Required Capacity Single Phase / Three Phase, 50 Hz, 220v,, Deep Well Submersible Pump Stainless Steel Body, Suitable For 4”/6” Tube Well With Contral Panel Starter Suitable For Submersible Pump With Dry Run Protection, Connections, Including Clamps, Bore Cap Etc. As Required As Per Specifications Butexcludingpipe,ss/nylonwireropeandconnection Cable Including Verification Of Tubewell Yield& Electric Connection From Cspdcl, Construction Of Brick Masonry Switch Room, Construction Of Boundary Wall Around The Over Head Tank, Installation Of Electro Chlorinator , Construction Of Chlorinator Room Of Providing Functional Household Tap Connection (f.h.t.c. 258 ) In Individual Households And Government Instiution Etc. Complete With Trial Run Of 03 Months After That O&mof 06 Months Under Piped Water Supply Scheme Under Jal Jeevan Mission For Village – Akhorakhurd (gondpara, Kewatapara, Khaspara), Akhorakhurd (korwapara), Block- Rajpur, District – Balrampur(c.g.)
Contract DateNA
Contract AmountRefer Documents 

Public Health Engineering Department - PHED Tender Result

Civil And Construction...+1Water Storage And Supply
Result Stage: Under Evaluation
Balrampur, Uttar Pradesh
Construction, Testing And Commissioning Ofr.c.c. Elevated Service Reservoir Of 45 Kl Capacities – 02 No. & Staging 15 Mtr & 40 Kl Capacities – 02 No. & Staging 15 Mtr {steel Structure 12 M Height & 10 Kl(5000l X 2no.)} Of 00 Nos. Pe Tank& Elevated Service Reservoirs Of Rcc Staging And Hdpe Slim Tank Of Capacity 5000 Ltr Of 00 No. 9 Mtr Staging(with Switch Room Of Size 1.8mx1.8mx3m) And 10000 Ltr Of 01 No. 12 Mtr Staging. Including Providing And Fixing Of Ci Double Flange Pipe, Double Flange Specials & Di Double Flange Soft Seated Sluice Valve Including Construction Of Suitable R.c.c. Valve Chamber. Providing, Laying, Jointing, Interconnection, Testing And Commissioning Of Rising Main Upvc Class 10 Kg/sqcm 90 Mm Dia 00 M & Hdpe 75mm Dia 00 M & 63 Mm Dia 6550 M.,distribution Upvc Class 6kg/sqcm 90mm Dia. 3618 M., 110 Mm Dia. 2847 M., 140 Mm Dia. 1355 M. 160 Mm Dia. 00 M.& Distribution Hdpe Class 6kg/sqcm 63 Mm Dia. 10131 M., 75 Mm Dia. 6177 M.with Suitable Joints Gi Pipe, Valve, Specials And All Fittings Including All Allied Civil Works, Supplying & Installation Of Energy Taging N Five Star Bee Rating Isi Marked Required Capacity Single Phase / Three Phase, 50 Hz, 220v,, Deep Well Submersible Pump Stainless Steel Body, Suitable For 4”/6” Tube Well With Contral Panel Starter Suitable For Submersible Pump With Dry Run Protection, Connections, Including Clamps, Bore Cap Etc. As Required As Per Specifications Butexcludingpipe,ss/nylonwireropeandconnection Cable Including Verification Of Tubewell Yield& Electric Connection From Cspdcl, Construction Of Brick Masonry Switch Room, Construction Of Boundary Wall Around The Over Head Tank, Installation Of Electro Chlorinator , Construction Of Chlorinator Room Of Providing Functional Household Tap Connection (f.h.t.c. 438 ) In Individual Households And Government Instiution Etc. Complete With Trial Run Of 03 Months After That O&mof 06 Months Under Piped Water Supply Scheme Under Jal Jeevan Mission For Village–lodhi (badkadand, Begaridand, Khaspara), Lodhi (chardand, Mudwahipara, Nagpanipara), Block- Wadrafnagar, District – Balrampur(c.g.)
Contract DateNA
Contract AmountRefer Documents 

Public Health Engineering Department - PHED Tender Result

Civil And Construction...+1Water Storage And Supply
Result Stage: Under Evaluation
Balrampur, Uttar Pradesh
Providing, Laying, Jointing, Interconnection, Testing And Commissioning Of 63 Mm Dia To75 Mm Hdpe/pvc- 1784 Mtr Length& 90 Mm Diato 150 Mm Diahdpe/pvc Class 06 To 10 Kg/sqcm- 13928 Mtr With Suitable Joints Length 0mtr All Fitting, Valve Specials, Yield Test , Tw -3, Pp-8, Rcc Oht 8, Steel Febrication Oht 10/12mtr Staging- 3, Fhtc -358electricity-3, Pump House -6, Electro Chlorinator-4, Chlorinator Room4, Bw-4job, Sign Board 3, Approch Road-2 Complete With Trial Runsix Month And Operation &maintanance For 06 Months Under Retrofitting/svs Of Piped Water Supply Scheme Under Jal Jeevan Mission For Village- Kachhia Lamori, Block- Wadrafnagar, District – Balrampur.
Contract DateNA
Contract AmountNA 

Urban Administration And Development Tender Result

Civil And Construction...+1Road Construction
Result Stage: Under Evaluation
Balrampur, Uttar Pradesh
Construction Of Cc Road,retaining Wall From Piple Tree To Old President House Road At Ward No-08
Contract DateNA
Contract AmountRefer Documents 

Public Health Engineering Department - PHED Tender Result

Civil And Construction...+1Water Storage And Supply
Result Stage: Under Evaluation
Balrampur, Uttar Pradesh
Construction, Testing And Commissioning Of R.c.c. Elevated Service Reservoir Of 00 Kl Capacities – 00 No. & Staging 12 Mtr / { Steel Structure 12 M Height & 10 Kl (5000l X 2no.)} Of 00 Nos. Pe Tank & Elevated Service Reservoirs Of Rcc Staging And Hdpe Slim Tank Of Capacity 5000 Ltr Of 00 No. 9 Mtr Staging (with Switch Room Of Size 1.8mx1.8mx3m) And 10000 Ltr Of 00 No. 12 Mtr Staging. Including Providing And Fixing Of Ci Double Flange Pipe, Double Flange Specials & Di Double Flange Soft Seated Sluice Valve Including Construction Of Suitable R.c.c. Valve Chamber. Providing, Laying, Jointing, Interconnection, Testing And Commissioning Of Rising Main Upvc Class 10 Kg/sqcm 90 Mm Dia 00 M & Hdpe 75mm Dia 00 M & 63 Mm Dia 00 M., Distribution Upvc Class 6kg/sqcm 90mm Dia. 00 M., 110 Mm Dia. 00 M., 140 Mm Dia. 00 M. 160 Mm Dia. 00 M.& Distribution Hdpe Class 6kg/sqcm 63 Mm Dia. 10313 M., 75 Mm Dia. 3352 M.with Suitable Joints Gi Pipe, Valve, Specials And All Fittings Including All Allied Civil Works, Supplying & Installation Of Energy Taging N Five Star Bee Rating Isi Marked Required Capacity Single Phase / Three Phase, 50 Hz, 220v,, Deep Well Submersible Pump Stainless Steel Body, Suitable For 4”/6” Tube Well With Contral Panel Starter Suitable For Submersible Pump With Dry Run Protection, Connections, Including Clamps, Bore Cap Etc. As Required As Per Specifications Butexcludingpipe,ss/nylonwireropeandconnection Cable Including Verification Of Tubewell Yield& Electric Connection From Cspdcl, Construction Of Brick Masonry Switch Room, Construction Of Boundary Wall Around The Over Head Tank, Installation Of Electro Chlorinator , Construction Of Chlorinator Room Of Providing Functional Household Tap Connection (f.h.t.c. 414 ) In Individual Households And Government Instiution Etc. Complete With Trial Run Of 03 Months After That O&m Of 06 Months Under Piped Water Supply Scheme Under Jal Jeevan Mission For Village – Jokapath (balampokhar, Dhaskapara, Paschimpara, Tanwartoli, Tongartoli), Jokapath (majhapath, Khaspara, Gidhkhai, Laldera, Purabtola, Shivgamhar, Tutdipa), Block- Shankargarh, District – Balrampur(c.g.)
Contract DateNA
Contract AmountRefer Documents 
7851-7860 of 7860 active Tender Results