Balrampur Tender Results

Balrampur Tender Results

Public Health Engineering Department - PHED Tender Result

Works
Civil And Construction...+1Water Storage And Supply
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Construction, Testing And Commissioning Ofr.c.c. Elevated Service Reservoir Of 00 Kl Capacities – 00 No. & Staging 15 Mtr / {steel Structure 09 M Height & 10 Kl- 01 No. And 12 M Height & 10 Kl- 05 No. (5000l X 2no.)} Of Total 06 Nos. Pe Tank & Elevated Service Reservoirs Of Rcc Staging And Hdpe Slim Tank Of Capacity5000 Ltr Of 00 No. 9 Mtr Staging (with Switch Room Of Size 1.8mx1.8mx3m) And 10000 Ltr Of 00 No. 12 Mtr Staging.including Providing And Fixing Of Ci Double Flange Pipe, Double Flange Specials & Di Double Flange Soft Seated Sluice Valve Including Construction Of Suitable R.c.c. Valve Chamber. Providing, Laying, Jointing, Interconnection, Testing And Commissioning Of Rising Main Upvc Class 10 Kg/sqcm 90 Mm Dia 00 M & Hdpe 75mm Dia 00 M & 63 Mm Dia 250 M., Distribution Upvc Class 6kg/sqcm 90mm Dia. 00 M., 110 Mm Dia. 00 M., 140 Mm Dia. 00 M. 160 Mm Dia. 00 M.& Distribution Hdpe Class 6kg/sqcm 63 Mm Dia. 11696 M., 75 Mm Dia. 3849 M.with Suitable Joints Gi Pipe, Valve, Specials And All Fittings Including All Allied Civil Works, Supplying & Installation Of Energy Taging N Five Star Bee Rating Isi Marked Required Capacity Single Phase / Three Phase, 50 Hz, 220v,, Deep Well Submersible Pump Stainless Steel Body, Suitable For 4”/6” Tube Well With Contral Panel Starter Suitable For Submersible Pump With Dry Run Protection, Connections, Including Clamps, Bore Cap Etc. As Required As Per Specifications Butexcludingpipe,ss/nylonwireropeandconnection Cable Including Verification Of Tubewell Yield& Electric Connection From Cspdcl, Construction Of Brick Masonry Switch Room, Construction Of Boundary Wall Around The Over Head Tank, Installation Of Electro Chlorinator , Construction Of Chlorinator Room Of Providing Functional Household Tap Connection (f.h.t.c. 378 ) In Individual Households And Government Instiution Etc. Complete With Trial Run Of 03 Months After That O&mof 06 Months Under Piped Water Supply Scheme Under Jal Jeevan Mission For Village – Bata (baigapani, Sarnatoli), Bata (banjutola, Masjidpara, Saraidih), Bata (bichtola, Kataidih, Khaspara), Block- Kusmi, District – Balrampur(c.g.)
Contract DateNA
Contract AmountRefer Documents 

Chhattisgarh Medical Services Corporation Limited - CGMSC Tender Result

Building Construction...+1Civil And Construction
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Construction Work Of Phc Building At Dandgaon Block Udaipur District – Sarguja (c.g.) I/c Internal Water Supply , Sanitary Fitting, Electrification Work. Etc.
Contract DateNA
Contract AmountRefer Documents 

Public Works Department - PWD Tender Result

Civil And Construction...+1Road Construction
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Widening & Strengthening Of Kusmi To Korondha Road Length 15.40 Km Distt.- Balrampur-ramanujganj (c.g.)
Contract DateNA
Contract AmountRefer Documents 

Urban Administration And Development Tender Result

Civil And Construction
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Development Of Track At Pg College Ground, Ambikapur
Contract DateNA
Contract AmountRefer Documents 

Ministry Of Micro Small And Medium Enterprises - MSME Tender Result

GEM
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Waste Containers Or Rigid Liners- Dust Bin Or Garbage Bin Or Household Bin-is 12402
Contract DateNA
Contract AmountNA 

Public Works Department - PWD Tender Result

Building Construction...+1Civil And Construction
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Construction Of Press Club At Baikunthpur Distt. Korea (c.g)
Contract DateNA
Contract AmountNA 

Public Health Engineering Department - PHED Tender Result

Civil And Construction...+1Water Storage And Supply
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Construction, Testing And Commissioning Of R.c.c. Elevated Service Reservoir Of 40kl Capacities – 01no.& Staging 15 Mtr&65kl Capacities – 01no.& Staging 15 Mtr / { Steel Structure 12 M Height & 10 Kl-02no. And.including Providing And Fixing Of Ci Double Flange Pipe, Double Flange Specials & Di Double Flange Soft Seated Sluice Valve Including Construction Of Suitable R.c.c. Valve Chamber. Providing, Laying, Jointing, Interconnection, Testing And Commissioning Ofrising Main Upvc Class 10 Kg/sqcm 90 Mm Dia 00 M & Hdpe 75 Mm Dia 4220 M & 63 Mm Dia 00 M .,distribution Upvc Class 6kg/sqcm 90mm Dia. 1328 M., 110 Mm Dia. 930., 140 Mm Dia. 439 M. 160 Mm Dia. 00 M.& Distribution Hdpe Class 6kg/sqcm 63 Mm Dia. 8128 M, 75 Mm Dia. 4502 M.with Suitable Joints Gi Pipe, Valve, Specials And All Fittings Including All Allied Civil Works, Supplying & Installation Of Energy Efficiant Five Star Bee Rating Isi Marked Required Capacity Single Phase / Three Phase, 50 Hz, 220v,, Deep Well Submersible Pump Stainless Steel Body, Suitable For 4"/6" Tube Well With Contral Panel Starter Suitable For Submersible Pump With Dry Run Protection, Connections, Including Clamps, Bore Cap Etc. As Required As Per Specifications Butexcludingpipe,ss/nylonwireropeandconnection Cable Including Verification Of Tubewell Yield& Electric Connection Fromcspdcl, Construction Of Brick Masonry Switch Room, Construction Of Boundary Wall Around The Over Head Tank, Installation Of Electro Chlorinator , Construction Of Chlorinator Room Of Providing Functional Household Tap Connection (f.h.t.c. 534 ) In Individual Households And Government Instiution Etc. Complete With Trial Run Of 03 Months After That O&mof 06 Months Under Piped Water Supply Scheme Under Jal Jeevan Mission For Village–girwani (baherapara, Baldharipara, Bansuritola, Khaspara), Girwani (chhatanipara, Harijanpara), Block- Wadrafnagar, District – Balrampur(c.g.)
Contract DateNA
Contract AmountRefer Documents 

Public Health Engineering Department - PHED Tender Result

Civil And Construction...+1Water Storage And Supply
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Construction, Testing And Commissioning Ofr.c.c. Elevated Service Reservoir Of 80 Kl Capacities – 01no.& Staging 12mtr/ { Steel Structure 12 M Height & 10 Kl (5000l X 2no.)} Of 00 Nos. Pe Tank& Elevated Service Reservoirs Of Rcc Staging And Hdpe Slim Tankof Capacity5000ltr Of 00 No. 9 Mtr Staging(with Switch Room Of Size 1.8mx1.8mx3m) And 10000ltr Of 00 No. 12 Mtrstaging.including Providing And Fixing Of Ci Double Flange Pipe, Double Flange Specials & Di Double Flange Soft Seated Sluice Valve Including Construction Of Suitable R.c.c. Valve Chamber. Providing, Laying, Jointing, Interconnection, Testing And Commissioning Of Rising Main Upvc Class 10 Kg/sqcm 90 Mm Dia 00 M & Hdpe 75mm Dia00 M & 63 Mm Dia00m.,distribution Upvc Class 6kg/sqcm 90mm Dia. 521 M., 110 Mm Dia. 200 M., 140 Mm Dia. 723 M. 160 Mm Dia. 00 M.& Distribution Hdpe Class 6kg/sqcm 63 Mm Dia. 7500 M., 75 Mm Dia. 624 M.with Suitable Joints Gi Pipe, Valve, Specials And All Fittings Including All Allied Civil Works, Supplying & Installation Of Energy Taging N Five Star Bee Rating Isi Marked Required Capacity Single Phase / Three Phase, 50 Hz, 220v,, Deep Well Submersible Pump Stainless Steel Body, Suitable For 4”/6” Tube Well With Contral Panel Starter Suitable For Submersible Pump With Dry Run Protection, Connections, Including Clamps, Bore Cap Etc. As Required As Per Specifications Butexcludingpipe,ss/nylonwireropeandconnection Cable Including Verification Of Tubewell Yield& Electric Connection From Cspdcl, Construction Of Brick Masonry Switch Room, Construction Of Boundary Wall Around The Over Head Tank, Installation Of Electro Chlorinator , Construction Of Chlorinator Room Of Providing Functional Household Tap Connection (f.h.t.c. 311 ) In Individual Households And Government Instiution Etc. Complete With Trial Run Of 03 Months After That O&mof 06 Months Under Piped Water Supply Scheme Under Jal Jeevan Mission For Village–krishnanagar{dhamni}(gondpara, Khairwartola, Kumhipara, Panditpara, Panikapara, Paschimpara, Patelpara, Patrapara, Purvtola, Schooltola ) Block- Ramchandrapur, District – Balrampur(c.g.)
Contract DateNA
Contract AmountRefer Documents 

Public Health Engineering Department - PHED Tender Result

Civil And Construction...+1Water Storage And Supply
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Construction, Testing And Commissioning Ofr.c.c. Elevated Service Reservoir Of 40kl Capacities – 01no.& Staging 12mtr/ { Steel Structure 12 M Height & 10 Kl (5000l X 2no.)} Of 00 Nos. Pe Tank& Elevated Service Reservoirs Of Rcc Staging And Hdpe Slim Tankof Capacity5000ltr Of 00 No. 9 Mtr Staging(with Switch Room Of Size 1.8mx1.8mx3m) And 10000ltr Of 00 No. 12 Mtrstaging.including Providing And Fixing Of Ci Double Flange Pipe, Double Flange Specials & Di Double Flange Soft Seated Sluice Valve Including Construction Of Suitable R.c.c. Valve Chamber. Providing, Laying, Jointing, Interconnection, Testing And Commissioning Of Rising Main Upvc Class 10 Kg/sqcm 90 Mm Dia 00 M & Hdpe 75mm Dia00 M & 63 Mm Dia00m.,distribution Upvc Class 6kg/sqcm 90mm Dia. 329 M., 110 Mm Dia. 00 M., 140 Mm Dia. 00 M. 160 Mm Dia. 00 M.& Distribution Hdpe Class 6kg/sqcm 63 Mm Dia. 8008 M., 75 Mm Dia. 12 M.with Suitable Joints Gi Pipe, Valve, Specials And All Fittings Including All Allied Civil Works, Supplying & Installation Of Energy Taging N Five Star Bee Rating Isi Marked Required Capacity Single Phase / Three Phase, 50 Hz, 220v,, Deep Well Submersible Pump Stainless Steel Body, Suitable For 4”/6” Tube Well With Contral Panel Starter Suitable For Submersible Pump With Dry Run Protection, Connections, Including Clamps, Bore Cap Etc. As Required As Per Specifications Butexcludingpipe,ss/nylonwireropeandconnection Cable Including Verification Of Tubewell Yield& Electric Connection From Cspdcl, Construction Of Brick Masonry Switch Room, Construction Of Boundary Wall Around The Over Head Tank, Installation Of Electro Chlorinator , Construction Of Chlorinator Room Of Providing Functional Household Tap Connection (f.h.t.c. 153 ) In Individual Households And Government Instiution Etc. Complete With Trial Run Of 03 Months After That O&mof 06 Months Under Piped Water Supply Scheme Under Jal Jeevan Mission For Village–kewali(amapara, Baniyapara, Bichpara, Ghutiyapara, Kerwapara, Khairwaritola, Mahuapara, Majhapara, Paschimpara, Patelpara, Purvtola, Purvtola Ii, Sarpanchpara, Uttartola), Block- Ramchandrapur, District – Balrampur(c.g.)
Contract DateNA
Contract AmountNA 

Public Health Engineering Department - PHED Tender Result

Civil And Construction...+1Water Storage And Supply
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Construction, Testing And Commissioning Ofr.c.c. Elevated Service Reservoir Of 70 Kl Capacities – 01no., 50 Kl Capacities – 01no., 45 Kl Capacities – 01no., 40 Kl Capacities – 01no. & Staging 15mtr Total 04 No. / {steel Structure 12 M Height & 10 Kl(5000l X 2no.)} Of 00 Nos. Pe Tank& Elevated Service Reservoirs Of Rcc Staging And Hdpe Slim Tankof Capacity5000ltr Of 00 No. 9 Mtr Staging(with Switch Room Of Size 1.8mx1.8mx3m) And 10000ltrof 00 No. 12 Mtrstaging.including Providing And Fixing Of Ci Double Flange Pipe, Double Flange Specials & Di Double Flange Soft Seated Sluice Valve Including Construction Of Suitable R.c.c. Valve Chamber. Providing, Laying, Jointing, Interconnection, Testing And Commissioning Of Rising Main Upvc Class 10 Kg/sqcm 90 Mm Dia 00 M & Hdpe 75mm Dia 00 M & 63 Mm Dia 6626 M.,distribution Upvc Class 6kg/sqcm 90mm Dia. 4760 M., 110 Mm Dia. 3236 M., 140 Mm Dia. 2284 M. 160 Mm Dia. 00 M.& Distribution Hdpe Class 6kg/sqcm 63 Mm Dia. 9543 M., 75 Mm Dia. 7158 M.with Suitable Joints Gi Pipe, Valve, Specials And All Fittings Including All Allied Civil Works, Supplying & Installation Of Energy Taging N Five Star Bee Rating Isi Marked Required Capacity Single Phase / Three Phase, 50 Hz, 220v,, Deep Well Submersible Pump Stainless Steel Body, Suitable For 4”/6” Tube Well With Contral Panel Starter Suitable For Submersible Pump With Dry Run Protection, Connections, Including Clamps, Bore Cap Etc. As Required As Per Specifications Butexcludingpipe,ss/nylonwireropeandconnection Cable Including Verification Of Tubewell Yield& Electric Connection From Cspdcl, Construction Of Brick Masonry Switch Room, Construction Of Boundary Wall Around The Over Head Tank, Installation Of Electro Chlorinator , Construction Of Chlorinator Room Of Providing Functional Household Tap Connection (f.h.t.c. 389 ) In Individual Households And Government Instiution Etc. Complete With Trial Run Of 03 Months After That O&mof 06 Months Under Piped Water Supply Scheme Under Jal Jeevan Mission For Village–adhaura(indirawash, Majhapara, Paschimtola), Adhaura (malarpara, Schoolpara, Uraonpara), Block- Balrampur, District – Balrampur(c.g.)
Contract DateNA
Contract AmountNA 
771-780 of 792 active Tender Results