Tender Results of Modern Coach Factory

Modern Coach Factory - MCF Tender Result

Ireps
Result Stage: Awarded  (AOC Available)
NA
33621081: 2.5 sq. mm (Black) Thin walled Flex. Elast. Cable with Cu. Cond. Up to 750 V, RDSO L. no. EL/2.2.37 dt. 23.03.2009 as per Drg.No. ELRS/SPEC/ELC/0019, REV-2 
Contract Date17 Oct 2016
Contract Amount₹ 1.2 Lac 

Modern Coach Factory - MCF Tender Result

Ireps
Result Stage: Awarded  (AOC Available)
NA
33640968:  SWITCH PLATE ASSEMBLIES FOR LHB EOG AC2TIER & AC3TIER COACHES as per Drg.No. EDML064, REV-B,TAB-1.OR LATEST ACCEPTED MAKE "SSK" IN SUBJECT PO. 
Contract Date17 Oct 2016
Contract Amount₹ 7.2 Lac 

Modern Coach Factory - MCF Tender Result

Ireps
Result Stage: Awarded  (AOC Available)
NA
75980149: PVC FLOORING ROLL 2X1850X14000MM, COLOUR AS PER SAMPLE NO. NACFLG-02 FOR LHB COACHES as per Drg.No. RDSO/2006/CG-12 REVISION 1 WITH AMENDMENT SLIP NO.1 OF APRIL 2015, WITH PVC WELDING ELECTRODE DIA 4M 
Contract Date17 Oct 2016
Contract Amount₹ 39.9 Lac 

Modern Coach Factory - MCF Tender Result

Ireps
Result Stage: Awarded  (AOC Available)
NA
75980149: PVC FLOORING ROLL 2X1850X14000MM, COLOUR AS PER SAMPLE NO. NACFLG-02 FOR LHB COACHES as per Drg.No. RDSO/2006/CG-12 REVISION 1 WITH AMENDMENT SLIP NO.1 OF APRIL 2015, WITH PVC WELDING ELECTRODE DIA 4M 
Contract Date17 Oct 2016
Contract Amount₹ 74.5 Lac 

Modern Coach Factory - MCF Tender Result

Ireps
Result Stage: Awarded  (AOC Available)
NA
33593905: BACK PIECE FOR SUPPORT OF BACKREST-CUM BERTH LONGI. as per Drg.No. LW42144 ALT b 
Contract Date17 Oct 2016
Contract Amount₹ 5.5 Lac 

Modern Coach Factory - MCF Tender Result

Ireps
Result Stage: Awarded  (AOC Available)
NA
33593905: BACK PIECE FOR SUPPORT OF BACKREST-CUM BERTH LONGI. as per Drg.No. LW42144 ALT b 
Contract Date17 Oct 2016
Contract Amount₹ 3.7 Lac 

Modern Coach Factory - MCF Tender Result

Ireps
Result Stage: Awarded  (AOC Available)
NA
33592858: AIR INLET DUCT FOR AC-3T(LHB).WHERE EVER INSULATION APPEARS IN THE DRG.IT SHOULD BE READ AS PER MDTS116 REV-05,REF.MD35131 09.07.10) as per Drg.No. LE44117. 
Contract Date17 Oct 2016
Contract Amount₹ 2.2 Cr 

Modern Coach Factory - MCF Tender Result

Ireps
Result Stage: Awarded  (AOC Available)
NA
33592858: AIR INLET DUCT FOR AC-3T(LHB).WHERE EVER INSULATION APPEARS IN THE DRG.IT SHOULD BE READ AS PER MDTS116 REV-05,REF.MD35131 09.07.10) as per Drg.No. LE44117. 
Contract Date17 Oct 2016
Contract Amount₹ 38.8 Lac 

Modern Coach Factory - MCF Tender Result

Ireps
Result Stage: Awarded  (AOC Available)
NA
33592858: AIR INLET DUCT FOR AC-3T(LHB).WHERE EVER INSULATION APPEARS IN THE DRG.IT SHOULD BE READ AS PER MDTS116 REV-05,REF.MD35131 09.07.10) as per Drg.No. LE44117. 
Contract Date17 Oct 2016
Contract Amount₹ 59.2 Lac 

Modern Coach Factory - MCF Tender Result

Ireps
Result Stage: Awarded  (AOC Available)
NA
33592858: AIR INLET DUCT FOR AC-3T(LHB).WHERE EVER INSULATION APPEARS IN THE DRG.IT SHOULD BE READ AS PER MDTS116 REV-05,REF.MD35131 09.07.10) as per Drg.No. LE44117. 
Contract Date17 Oct 2016
Contract Amount₹ 1.1 Cr 
9951-9960 of 10000 active Tender Results