Tender Results of Modern Coach Factory

Modern Coach Factory - MCF Tender Result

Ireps
Result Stage: Awarded
NA
33503023: PAD FOR SECONDARY SUSPENSION as per Drg.No. 1903149 VER. a AND SPECIFICATION NO. 17.477 100 02 Packing Instruction - PI042, Ver.-01 
Contract Date9 Mar 2022
Contract Amount₹ 33.3 Lac 

Modern Coach Factory - MCF Tender Result

Machinery and Tools
Ireps
Result Stage: Awarded
Uttar Pradesh
33503059: SECONDARY SPRING (Inner to Drawing.No. 1269513 VER. 02R, without GTIN/CPID marking) for FIAT Bogie as per RDSO Spec. No. RDSO/2017/CG-01 (Rev-01) with corrigendum No. -01 of October 2019. Packing Inst 
Contract Date9 Mar 2022
Contract Amount₹ 7.8 Lac 

Modern Coach Factory - MCF Tender Result

Ireps
Result Stage: Awarded
Raebareli, Uttar Pradesh
33593905: BACK PIECE FOR SUPPORT OF BACKREST-CUM BERTH LONGI. as per Drg.No. LW42144 ALT c, Packing Instruction - PI020 
Contract Date9 Mar 2022
Contract Amount₹ 4.3 Lac 

Modern Coach Factory - MCF Tender Result

Ireps
Result Stage: Awarded
NA
33503023: PAD FOR SECONDARY SUSPENSION as per Drg.No. 1903149 VER. a AND SPECIFICATION NO.17.477 100 02. The product will be supplied as per approval granted by MCF 
Contract Date9 Mar 2022
Contract Amount₹ 22.2 Lac 

Modern Coach Factory - MCF Tender Result

Ireps
Result Stage: Awarded
NA
33610174: FLEXIBLE CONNECTER HOSE WITH STAINLESS STEEL MESH as per Drg.No. LH63112 ALT b ITEM 1, Packing Instruction - PI020. 
Contract Date8 Mar 2022
Contract Amount₹ 1.5 Lac 

Modern Coach Factory - MCF Tender Result

Machinery and Tools
Ireps
Result Stage: Awarded
Raebareli, Uttar Pradesh
33567372: SET OF DOOR CUT OUT FOR LHB COACHES AS PER DRAWING NO. MP20DOORCUT VERSION 0, Packing Condition: PI042 Ver 1.0 
Contract Date8 Mar 2022
Contract Amount₹ 37.2 Lac 

Modern Coach Factory - MCF Tender Result

Furnitures and Fixtures
Ireps
Result Stage: Awarded
Raebareli, Uttar Pradesh
33567219: COLLAPSIBLE DOOR (DOUBLE PANEL) WIDTH 2940MM & HEIGHT 1905 MM, as per drawing: VP56001 Alt. d item no. 1, IS: 10521-83 TYPE-A, ROLLER WHEELS ON BOTTOM RUNNER, WITH LATCHES ON BOTH SIDES. PAINTED AS PE 
Contract Date8 Mar 2022
Contract Amount₹ 3.5 Lac 

Modern Coach Factory - MCF Tender Result

Ireps
Result Stage: Awarded
NA
33980240: BOGIE BOLSTER ASSEMBLY FOR AIR SPRING TYPE FIAT BOGIE as per Drawing No- LW04001 Alt f with drg. AAA04079 Alt 'a' of item no-27 of drg no- LW04001 Alt-f (without GTIN/CPID marking) MDTS- 204001 Rev-01 
Contract Date8 Mar 2022
Contract Amount₹ 45 Lac 

Modern Coach Factory - MCF Tender Result

Ireps
Result Stage: Awarded
NA
81047666: SHIELDING GAS (EACH CYL.CONSIST-7CUM,GAS WT-12.3KG,PRESS.-150KG/SQ.CM as per Drg.No. GAS MIXTURE OF 90% ARGON+ 5% CO2+ 5% OXYGEN, Protection Procedure - YOU CANNOT ENTE as per Drg.No. GAS MIXTURE OF 9 
Contract Date8 Mar 2022
Contract Amount₹ 29.3 Lac 

Modern Coach Factory - MCF Tender Result

Automobiles and Auto Parts...+1Machinery and Tools
Ireps
Result Stage: Awarded
Raebareli, Uttar Pradesh
33980240: BOGIE BOLSTER ASSEMBLY FOR AIR SPRING TYPE FIAT BOGIE as per Drawing No- LW04001 Alt f with drg. AAA04079 Alt 'a' of item no-27 of drg no- LW04001 Alt-f (without GTIN/CPID marking) MDTS- 204001 Rev-01 
Contract Date8 Mar 2022
Contract Amount₹ 67.6 Lac 
9991-10000 of 10000 active Tender Results