Tender Results of Jammu And Kashmir State Industrial Development Corporation
Tender Results of Jammu And Kashmir State Industrial Development Corporation
Select Contract Period
2024 onwards
2022 onwards
All Time
Jammu And Kashmir State Industrial Development Corporation Tender Result
Paints and Enamels
Result Stage: Under Evaluation
Raipur, Chhattisgarh
Paints & Distemper
Contract DateNA
Contract AmountRefer Documents
Jammu And Kashmir State Industrial Development Corporation Tender Result
Automobiles and Auto Parts...+5Civil And Construction, Civil Works Others, Drainage Work, Excavation, Transportation and Logistics
Result Stage: Under Evaluation
Raipur, Chhattisgarh
Tender for Clearing Of Existing Drain Ie. Excavation In All Type Soil & Other Material Of Industrial Area Sirgitti And Tifra Bilaspur Including Transportation Of Sludge, Garbage Etc. From Drain Side To Dumping Point (approximate 5.00 Km), Cleaning Of Grass Bushes Etc. Minimum Labor Required Per Day For The Work Are 10 Laborer Including Tractor Engine & Trolley With Driver, Fuel/ Cycle Rickha Or Hand Trolley Complete For One Year From Date Of Work Order.
Contract DateNA
Contract AmountRefer Documents
Jammu And Kashmir State Industrial Development Corporation - SIDCO Tender Result
Result Stage: Under Evaluation
Raipur, Chhattisgarh
Polyethylene Bags
Contract DateNA
Contract AmountRefer Documents
Jammu And Kashmir State Industrial Development Corporation Tender Result
Consultancy Services
Eprocure
Result Stage: Technical Evaluation
Kathua, Jammu & Kashmir
Survey With The Electronic Total Station Etsof The Total Area, Taking Rl At Regular Intervals As Per The Direction Of Engineer Incharge The Job Includes Boundary Survey Interval Survey Along With Bust Cutting, Preparation Of Site Planlayout Plan
Contract DateNA
Contract AmountRefer Documents
Jammu And Kashmir State Industrial Development Corporation Tender Result
Building Construction...+7Civil And Construction, Drainage Work, Electrical Goods and Equipments, Electrical and Electronics, Pipe Line Project, Road Construction, Water Storage And Supply
Result Stage: Under Evaluation
Durg, Chhattisgarh
Infrastructure Development Works Including Roads, Drainage, Culverts, Water Supply System, Street Light, Boundary Wall, Gate, Barbed Wire Fencing, Along With Construction Of Factory Buildings & Other Buildings For Ayurvedic Aushadhi Factory Proposed At Village Jamgaon-m, Development Block-patan, District-durg (c.g.).
Contract DateNA
Contract AmountNA
Jammu And Kashmir State Industrial Development Corporation - SIDCO Tender Result
Eprocure
Result Stage: Financial Bid Opening
Kathua, Jammu & Kashmir
Preparation of Detailed Project Report DPR for construction of Solid Waste Management System facility at Industrial Complex Ghatti Kathua
Contract DateNA
Contract AmountRefer Documents
621-630 of 626 active Tender Results