Tender Results of Jammu And Kashmir State Industrial Development Corporation
Tender Results of Jammu And Kashmir State Industrial Development Corporation
Select Contract Period
2023 onwards
2021 onwards
All Time
Jammu And Kashmir State Industrial Development Corporation Tender Result
Building Construction...+7Civil And Construction, Drainage Work, Electrical Goods and Equipments, Electrical and Electronics, Pipe Line Project, Road Construction, Water Storage And Supply
Result Stage: Under Evaluation
Durg, Chhattisgarh
Infrastructure Development Works Including Roads, Drainage, Culverts, Water Supply System, Street Light, Boundary Wall, Gate, Barbed Wire Fencing, Along With Construction Of Factory Buildings & Other Buildings For Ayurvedic Aushadhi Factory Proposed At Village Jamgaon-m, Development Block-patan, District-durg (c.g.).
Contract DateNA
Contract AmountNA
Jammu And Kashmir State Industrial Development Corporation - SIDCO Tender Result
Eprocure
Result Stage: Financial Bid Opening
Kathua, Jammu & Kashmir
Preparation of Detailed Project Report DPR for construction of Solid Waste Management System facility at Industrial Complex Ghatti Kathua
Contract DateNA
Contract AmountRefer Documents
Jammu And Kashmir State Industrial Development Corporation Tender Result
Consultancy Services
Eprocure
Result Stage: Technical Evaluation
Kathua, Jammu & Kashmir
Survey With The Electronic Total Station Etsof The Total Area, Taking Rl At Regular Intervals As Per The Direction Of Engineer Incharge The Job Includes Boundary Survey Interval Survey Along With Bust Cutting, Preparation Of Site Planlayout Plan
Contract DateNA
Contract AmountRefer Documents
621-630 of 623 active Tender Results