Tender Results of Ircon International Limited
Tender Results of Ircon International Limited
Select Contract Period
2023 onwards
2021 onwards
All Time
Ircon International Limited - IRCON Tender Result
Result Stage: Under Evaluation
NA
Consultancy services for Proof Checking of Design of Ventilation Fire Escape Emergency Rescue and other related electro mechanical system for T_74R Main Tunnel Escape Tunnel and Adit on Dharam Banihal Section of USBRL Project J and K INDIA Package PCD_01
Contract DateNA
Contract AmountRefer Documents
Ircon International Limited - IRCON Tender Result
Result Stage: Under Evaluation
NA
Construction of Station buildings, Signaling complexes, Platforms, FOBs including extension of FOBs, Circulating area, Approach roads, Provision of passenger amenities, PF fencing and other miscellaneous works between Chaksikandar including to Hajipur including in connection with doubling of Hajipur Bachhwara Rail line.
Contract DateNA
Contract AmountRefer Documents
Ircon International Limited - IRCON Tender Result
Result Stage: Under Evaluation
Patna, Bihar
Providing fabricating assembly erection and painting of Steel Box Composite Girder and steel stair case for Railway span of Mithapur Arm in connection to Construction of ROB in lieu of LC-79 at Mithapur Patna in state of Bihar
Contract DateNA
Contract AmountRefer Documents
Ircon International Limited - IRCON Tender Result
Result Stage: Under Evaluation
NA
Strengthening and Improvement to the existing approach road from Ch 0/000 Kms to Ch 18/500 Kms from Barala to Ind_Tatsun Nala part of approach road from Sangaldan to Tatsun Nala P2 of Tunnel T14 and P1 of Tunnel T15 on the Katra_Dharam section of the USBRL PKG_T_15 ROAD
Contract DateNA
Contract AmountRefer Documents
Ircon International Limited - IRCON Tender Result
Result Stage: Under Evaluation
NA
Construction of Outdoor Unmanned Remote Controlled 33 KV Switch Yard at South Portal T 80 Banihal for Providing 33 KV Power Supply using Intelligent Pole Mounted Reclosers with Solid Insulated Switchgear_SIS and other auxiliary works for T_80 South Portal Banihal Railway Station on Dharam Banihal Section of USBRL Project J and K Package SW_01
Contract DateNA
Contract AmountRefer Documents
Ircon International Limited - IRCON Tender Result
Result Stage: Under Evaluation
NA
Hiring of vehicles for officers and staff of Northern Railway associated with the Project works in connection with the construction with the construction of Dharam Qazigund Section of USBRL New Rail Link Project J AND K Package VH13
Contract DateNA
Contract AmountRefer Documents
Ircon International Limited - IRCON Tender Result
Result Stage: Under Evaluation
Baramulla, Jammu & Kashmir
Detailed Design Consultancy of E and M works and Construction Supervision of Tunnels including 3_D monitoring and associated works between km 110 and km 125 in connection with Construction of Dharam Qazigund Section of Udhampur Srinagar Baramulla New BG Railway Line Project Balance Work Package DDC/T_49 Km 110_125
Contract DateNA
Contract AmountRefer Documents
Ircon International Limited - IRCON Tender Result
Result Stage: Under Evaluation
Baramulla, Jammu & Kashmir
Laying of H T cables 33kV / 11kV G I Pipes outside of bridge retaining wall including testing and commissioning with Supply Erection of steel supporting clamps H T cables straight through jointing kits_End terminations Isolators_Earthing strips_ Maintenance free Earthing, 33KV lightning arrestors etc over Bridge _5A section Qazigund Baramulla of USBRL Project J and K Package VB_01
Contract DateNA
Contract AmountRefer Documents
Ircon International Limited - IRCON Tender Result
Result Stage: Under Evaluation
NA
Supply Installation Testing Commissioning Training Warranty and Comprehensive Maintenance of Video Monitoring Recording and Streaming of Activities using IP cameras at Anji Bridge Construction Site USBRL project in the State of J and K
Contract DateNA
Contract AmountRefer Documents
Ircon International Limited - IRCON Tender Result
Civil And Construction...+2Consultancy Services, Road Construction
Eprocure
Result Stage: Under Evaluation
Hoshiarpur, Punjab
Pre Bid Engineering Services For The Works Of 4 Laning Of Phagwara To Hoshiarpur Road Including Phagwara, Hoshiarpur Bypass Under Bharatmala Pariyojana Total Design Length Of 48.622 Km In The State Of Punjab On Hybrid Annuity Mode
Contract DateNA
Contract AmountNA
1561-1570 of 1670 active Tender Results