Urban Development Authority Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Urban Development Authority - UDD Tender

Works
Civil And Construction
Excavation
Opening Date16 Apr 2025
Closing Date19 Apr 2025
Tender Amount₹ 46,67,110 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Horticulture works;372-2 Maintenance of lawns:Watering the lawns @ 10 litres / Sqm. / day basing on the season and weather conditions (Sub soil moisture shall be maintained continuously). The watering shall be carried out DAILY during non rainy days.Lawn mowing and edging of the lawns in the following frequency. Keeping the lawn grass blade not more than 2 cm. (March 2025 to June-2025) (5900 x 4 months=23600)

23600

660

155779

... More
Horticulture works;Cost of Travellars Palm ( in duck pond)

3

1500

4500

... More
Horticulture works;Laying of Shabad Stone for path way(Approved Rates)

200

743

148640

... More
Horticulture works;Hamelia Patens(8"X10")

50

60

3000

... More
Horticulture works;372-3 Maintenance of hedge/shrub planting i) Trimming of hedges/ shrubs once in 15 days ii) Watering hedges/ shrubs once in a day @ 5 litres/per sqmts / per day / ( sub soil moisture shall be maintained continuously). iii) Formation of basins 1 ft away from the hedge . iv) Application offertilizers, insecticides, Fungicides @20 gms/pit/sqmt) etc.(March-2025 to June-2025) (800 x 4 months=3200)

3200

2930

93785

... More
Horticulture works;Cost of the good quality Korean/Mexican/Shade carpet grass duly rolled and of atleast once moved, with grass blades not more than 1 cm height, without pumps and tufts, uniform in colour and texture, devoid of weeds. Carpet grass (371 (b) Light bearers and Shade bearer grass ( as decided by the KUDA Officers))c. Bund Down stream (Plain area)

2700

161

435780

... More
Horticulture works;BOUGAINVILLEA YELLOW(8"x10")

500

55

27500

... More
Horticulture works;Cost of Pencil Pines (21" X 21")

2

1200

2400

... More
Horticulture works;BOUGAINVILLEA WHITE(8"x10")

800

55

44000

... More
Horticulture works;LANTANA WHITE(8"x10")

250

35

8750

... More
Horticulture works;Tecoma Capensis(8"x10")

500

45

22500

... More
Horticulture works;Lawn in Zone-II: Bed preparation: Dressing the surface to the desired shape, laying 4? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller 2.5" thickness after rolling), including the cost of red earth, sand and labour charges etc complete but excluding the cost of fertilizers, chemicals and grass. (371-a(ii)b. Bund Down stream (Plain area)

2700

222

600750

... More
Horticulture works;Cost of the good quality Korean/Mexican/Shade carpet grass duly rolled and of atleast once moved, with grass blades not more than 1 cm height, without pumps and tufts, uniform in colour and texture, devoid of weeds. Carpet grass (371 (b) Light bearers and Shade bearer grass ( as decided by the KUDA Officers))Carpet grass laying and Ramming (371 -2(c))

5900

58

342790

... More
Horticulture works;Cost of the good quality Korean/Mexican/Shade carpet grass duly rolled and of atleast once moved, with grass blades not more than 1 cm height, without pumps and tufts, uniform in colour and texture, devoid of weeds. Carpet grass (371 (b) Light bearers and Shade bearer grass ( as decided by the KUDA Officers))a. Mound Elliptical shape at zone -II

700

161

112980

... More
Horticulture works;BOUGAINVILLEA PINK(8"x10")

600

55

33000

... More
Horticulture works;Golden Bamboo(12"x13")

2000

225

450000

... More
Horticulture works;Plumeria Pudica(13" x 13")

60

100

6000

... More
Horticulture works;BOUGAINVILLEA CHILLI RED(8"x10")

600

65

39000

... More
Horticulture works;371-3(b) Hedge / shrub planting:Hedge / shrub planting: Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@ 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.

800

756

605192

... More
Horticulture works;371-Topiary / Palms / Garden tree plantingTopiary / Palms / Garden tree planting ? Digging of 75x75x75 cm pit, filling with soil mixture with red soil and farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of fertilizers (@ 20 gms/pit/sqmt) and plant material).

37

746

27624

... More
Horticulture works;371-5(a) Planting of individual shrub/rose/ornamental BambooDigging the pit of size 0.45x0.45x0.45 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.

2000

194

388140

... More
Horticulture works;Roses 8" X 8" Bag size ( Kashmir Rose, Summer Snow)

500

100

50000

... More
Horticulture works;Cost of the good quality Korean/Mexican/Shade carpet grass duly rolled and of atleast once moved, with grass blades not more than 1 cm height, without pumps and tufts, uniform in colour and texture, devoid of weeds. Carpet grass (371 (b) Light bearers and Shade bearer grass ( as decided by the KUDA Officers))b. Bund area

2500

161

403500

... More
Horticulture works;Royal Pam(25"x25")

30

1800

54000

... More
Horticulture works;Cost of Multihead Ficus ( front Circle Middle plant)

2

15000

30000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.