Urban Development Authority Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Urban Development Authority - UDD Tender
Civil And Construction
Excavation
Opening Date16 Apr 2025
Closing Date19 Apr 2025
Tender Amount₹ 46,67,110
Costs
EMD
₹ 46,671Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
589027Tender No
D/131/2025Tender Authority
Urban Development Authority ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Horticulture works;372-2 Maintenance of lawns:Watering the lawns @ 10 litres / Sqm. / day basing on the season and weather conditions (Sub soil moisture shall be maintained continuously). The watering shall be carried out DAILY during non rainy days.Lawn mowing and edging of the lawns in the following frequency. Keeping the lawn grass blade not more than 2 cm. (March 2025 to June-2025) (5900 x 4 months=23600)
23600
660
155779
... More
Horticulture works;Cost of Travellars Palm ( in duck pond)
3
1500
4500
... More
Horticulture works;Laying of Shabad Stone for path way(Approved Rates)
200
743
148640
... More
Horticulture works;Hamelia Patens(8"X10")
50
60
3000
... More
Horticulture works;372-3 Maintenance of hedge/shrub planting i) Trimming of hedges/ shrubs once in 15 days ii) Watering hedges/ shrubs once in a day @ 5 litres/per sqmts / per day / ( sub soil moisture shall be maintained continuously). iii) Formation of basins 1 ft away from the hedge . iv) Application offertilizers, insecticides, Fungicides @20 gms/pit/sqmt) etc.(March-2025 to June-2025) (800 x 4 months=3200)
3200
2930
93785
... More
Horticulture works;Cost of the good quality Korean/Mexican/Shade carpet grass duly rolled and of atleast once moved, with grass blades not more than 1 cm height, without pumps and tufts, uniform in colour and texture, devoid of weeds. Carpet grass (371 (b) Light bearers and Shade bearer grass ( as decided by the KUDA Officers))c. Bund Down stream (Plain area)
2700
161
435780
... More
Horticulture works;BOUGAINVILLEA YELLOW(8"x10")
500
55
27500
... More
Horticulture works;Cost of Pencil Pines (21" X 21")
2
1200
2400
... More
Horticulture works;BOUGAINVILLEA WHITE(8"x10")
800
55
44000
... More
Horticulture works;LANTANA WHITE(8"x10")
250
35
8750
... More
Horticulture works;Tecoma Capensis(8"x10")
500
45
22500
... More
Horticulture works;Lawn in Zone-II: Bed preparation: Dressing the surface to the desired shape, laying 4? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller 2.5" thickness after rolling), including the cost of red earth, sand and labour charges etc complete but excluding the cost of fertilizers, chemicals and grass. (371-a(ii)b. Bund Down stream (Plain area)
2700
222
600750
... More
Horticulture works;Cost of the good quality Korean/Mexican/Shade carpet grass duly rolled and of atleast once moved, with grass blades not more than 1 cm height, without pumps and tufts, uniform in colour and texture, devoid of weeds. Carpet grass (371 (b) Light bearers and Shade bearer grass ( as decided by the KUDA Officers))Carpet grass laying and Ramming (371 -2(c))
5900
58
342790
... More
Horticulture works;Cost of the good quality Korean/Mexican/Shade carpet grass duly rolled and of atleast once moved, with grass blades not more than 1 cm height, without pumps and tufts, uniform in colour and texture, devoid of weeds. Carpet grass (371 (b) Light bearers and Shade bearer grass ( as decided by the KUDA Officers))a. Mound Elliptical shape at zone -II
700
161
112980
... More
Horticulture works;BOUGAINVILLEA PINK(8"x10")
600
55
33000
... More
Horticulture works;Golden Bamboo(12"x13")
2000
225
450000
... More
Horticulture works;Plumeria Pudica(13" x 13")
60
100
6000
... More
Horticulture works;BOUGAINVILLEA CHILLI RED(8"x10")
600
65
39000
... More
Horticulture works;371-3(b) Hedge / shrub planting:Hedge / shrub planting: Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@ 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.
800
756
605192
... More
Horticulture works;371-Topiary / Palms / Garden tree plantingTopiary / Palms / Garden tree planting ? Digging of 75x75x75 cm pit, filling with soil mixture with red soil and farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of fertilizers (@ 20 gms/pit/sqmt) and plant material).
37
746
27624
... More
Horticulture works;371-5(a) Planting of individual shrub/rose/ornamental BambooDigging the pit of size 0.45x0.45x0.45 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.
2000
194
388140
... More
Horticulture works;Roses 8" X 8" Bag size ( Kashmir Rose, Summer Snow)
500
100
50000
... More
Horticulture works;Cost of the good quality Korean/Mexican/Shade carpet grass duly rolled and of atleast once moved, with grass blades not more than 1 cm height, without pumps and tufts, uniform in colour and texture, devoid of weeds. Carpet grass (371 (b) Light bearers and Shade bearer grass ( as decided by the KUDA Officers))b. Bund area
2500
161
403500
... More
Horticulture works;Royal Pam(25"x25")
30
1800
54000
... More
Horticulture works;Cost of Multihead Ficus ( front Circle Middle plant)
2
15000
30000
Evaluation Notes How It Works ?
Potential Partner