Tribal Welfare Engineering Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Tribal Welfare Engineering Department - TWED Tender
Civil And Construction
Building Construction
Water Storage And Supply
Opening Date7 Mar 2024
Closing Date14 Mar 2024
Tender Amount₹ 22,53,049
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
507694Bid Award Id
ViewTender No
SE/TW/WGL/NIT/938/2023-2024, Dt: 04.03.2024Tender Authority
Tribal Welfare Engineering Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
CIVIL WORK;Supplying & Fixing of 15. mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931 including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work for All Floors.for 300 grams
60
307
18474
CIVIL WORK;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing, sales and other taxes on all materials etc., complete for finished item of work. (A.P.S.S. No. 1325).
12
8901
106821
CIVIL WORK;Supplying & fixing CI Floor traps 1st quality ISI marked conforming to IS:1729-1979 with C.P. Grating fixing with white cement as per site requirements with standard practice 100 mm dia Inlet- 75 mm (3") outlet pipe - 4 Kgs with N.P. Cover for all floors, including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work. (APSS No 1326) for All Floors.
30
448
13464
CIVIL WORK;S&F 110 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm including cost and conveyance of all materials and labour charges , Overheads & Contractors profit complete for finished item of work for all floors.
38
326
12420
CIVIL WORK;S&F 75 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm including cost and conveyance of all materials and labour charges , Overheads & Contractors profit complete for finished item of work for all floors.
21.5
225
4845
CIVIL WORK;Supply of 32mm PPR Ball Valve conforming to DIN Standards 8077/8092 including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work for All Floors. For 41.30mm OD CPVC balla valve
4
645
2581
CIVIL WORK;Supply of 32mm PPR Ball Valve conforming to DIN Standards 8077/8092 including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work for All Floors. For 25mm OD CPVC balla valve
4
315
1263
CIVIL WORK;Supply and fixing of Ashirvad / Ajay / Astral Flowguard or equivalent CPVC Pipe and fittings to meet the requirement of ASTM-D 22.20 and are producred in CTS (Copper tube size 41.30mm OD pipe SDR 13.5 Pipes are made from idential CPVC compound having the same physical properties for Hot and cold water (IS 15778:2007).
89.5
449
40271
CIVIL WORK;Supply and fixing of Ashirvad / Ajay / Astral Flowguard or equivalent CPVC Pipe and fittings to meet the requirement of ASTM-D 22.20 and are producred in CTS (Copper tube size 28.60mm OD pipe SDR 13.5 Pipes are made from idential CPVC compound having the same physical properties for Hot and cold water (IS 15778:2007).
315
267
84105
CIVIL WORK;Supply and fixing of Ashirvad / Ajay / Astral Flowguard or equivalent CPVC Pipe and fittings to meet the requirement of ASTM-D 22.20 and are producred in CTS (Copper tube size 15.90mm OD pipe SDR 13.5 Pipes are made from idential CPVC compound having the same physical properties for Hot and cold water (IS 15778:2007).
84
176
14792
CIVIL WORK;Supplying & Fixing Orissa Pan 580 mm x 440 mm white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware/ Parryware/ Neycer - ISI mark 580 mm x 440mm as approved by the Engineer-in-charge fixed in brick masonry with necessary ?S? trap of water closet, shall be encased in C.C. (1:2:4) 6" alround well above the joint, to stop leakage at the joint, cost & conveyance of all materials and labour charges etc., including sales and other taxes on all materials complete for finished item of work for all floors.
40
2852
114116
CIVIL WORK;Supply and fixing of 18guage M.S.Plain sheet DOOR of size 1.20M x 2.00M(Double shutters) with outer angular frame of rolled steel equal angle ISA 4040 of size 40mm x40mm x 6mm and with MS hold fast 6 Nos with Double shutter frame of 35x35x4 mm in between 2 Nos 25x25x4mm 'L' angular section bakc side of shutter alround MS Flat Patty 90x2mm with 18 guage MS Sheet welded with required fixtures such as M.S.Powder coated tower bolts I.S. 204 150mm long 2Nos, M.S.Powder coated Butt Hinges IS 205 125mm long 6Nos., M.S.Powder coated handles IS 208 125mm long 2Nos,M.S.Powder coated Aldrops 300mm long 2No, and including Red oxide primer of grade-I quality, sales and other taxes ,cost and conveyance of all materials to site, all labour cahrges etc.,complete for finished item of work.
6
8538
51228
CIVIL WORK;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter ? (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin)of (94 mm x 45 mm)/(80 mm x 52 mm) x 2.20 mm for outer frames, (58 mm x 39 mm)/(54 mm x 38 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42 mm x 25 mm)/(52 mm x 21.5 mm) x 2.0 mm fitted with Vinyl Coated Fibre mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.
22
8089
177958
CIVIL WORK;Vibrated plain / reinforced cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site, excl seigniorage charges and all labour charges for machine mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., as per technical specification MoRT&H 1500,1700, 2100 (4th Revision), and 802, 803, 1202 and 1203 MORD complete for finished item of work for footings of Abutments, Piers, Wing walls and Raft foundations
21.86
6461
141246
CIVIL WORK;Providing Plain Cement Concrete (1:3:6) mix M10 Grade using 40mm (SS5) size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost and conveyance of all materials to site, excl seigniorage charges and labour charges for centering, machine mixing, laying concrete in position, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., as per technical specification MoRT&H 1500, 1700, 2100 (4th Revision), and 802, 803, 1202 and 1203 MORDas directed by the Engineer-in-Charge complete for finished item of work for levelling course.
8.66
6383
55277
CIVIL WORK;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, seigniorage charges, labour charges such as shoring ,sheeting, planking, strutting, dewatering etc. complete for finished item of work as per SS - 20 B (APSS 308)
51.98
128
6669
CIVIL WORK;Painting to Old Iron work with two coats of ready mixed synthetic enamel paint first quality all shades over red oxide primer Grade-I making three (3) coats in all to given and even shade after thourughly brushing the surface to remove all dirt and remains of loose powered materials, including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors
556.9
1257
70050
CIVIL WORK;Painting to Old External Walls with two coats of Polymer Plastic Emulsion paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as approved by the Engineer - in - Charge to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 911)
1668.5
1597
266459
CIVIL WORK;Painting to new walls with 1 coat of plastic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal wall
2104.27
740
155758
CIVIL WORK;Painting to Old External Walls with two coats of Polymer Plastic Emulsion paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as approved by the Engineer - in - Charge to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 911)
322.07
1597
51435
CIVIL WORK;Painting to new walls with 1 coat of plastic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal wall
290.27
740
21486
CIVIL WORK;Supplying & fixing of 1.20x 2.00 Mts. (Double Leaf) Door frame made of roll formed section of 1.25 mm thick CRCA section, size should be 50 x 75 mm with 32 mm rebate. The corner of the frame should be welded. The frame should be painted with one coat of primer and finished painted with pure polyester paint. The frame should be provided with approved quality M.S.Powder coated butt hinges IS 205 125mm long of 6 Nos. along with Double flush door shutters solid bond wood block board type with commercial ply on both faces of 30mm thick including fixtures such as Mild Steel "Z" type Hold Fasts 6 Nos., M.S.Powder coated tower bolts I.S. 204, 300 mm long and 10mm BOLT dia 2Nos, M.S.Powder coated handles IS 208 125mm long 4No, M.S.Powder coated Aldrop IS 2681 300mm long 1No., M.S.Powder coated Door Stoper 2No., sales and other taxes cost and conveyance of all materials to site, all labour cahrges such as making of door frame, fixing in position,fixing of shutters, & hard ware fixtures, etc.,complete for finished item of work. The frame should be embedded to a depth of 40mm in the flooring.
4
8538
34152
CIVIL WORK;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter ? (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin)of (94 mm x 45 mm)/(80 mm x 52 mm) x 2.20 mm for outer frames, (58 mm x 39 mm)/(54 mm x 38 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42 mm x 25 mm)/(52 mm x 21.5 mm) x 2.0 mm fitted with Vinyl Coated Fibre mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.
11
8089
88979
CIVIL WORK;Flooring with soluble salt porcelain vitrified tiles screen printed and polished of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs of make Jhonson & Jhonson, Kajaria, Nitco, Marbonite, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, .
82.96
11264
93452
CIVIL WORK;Plastering to even surfaces of wall with CM(1:5`) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, natural river sand and manufactured sand (Rock sand) in the ratio of 50:50, coarse aggregate, water ., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906)
59.18
1926
11402
CIVIL WORK;Brick Masonry in superstructure with CM (1:8) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm, for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust with a compresive strength not lessthan 50 kg/sqm including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., for Superstructure Walls.
10.36
8825
91432
CIVIL WORK;Plain Cement Concrete (1:5:10) proportion (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Broken Granite (IS383, 1970) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, natural river sand and manufactured sand (Rock sand) in the ratio of 50:50, coarse aggregate, water etc. to site, mixing concrete in concrete mixer excluding seigniorage charges, sales & other taxes on all materials,including all operational, incidental, and labour charges such as laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work (APSS No. 402) for leveling Course and flooring bed
18.64
6148
114613
CIVIL WORK;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work
370.73
5857
217172
CIVIL WORK;Demolition including stacking of serviceable materials and disposal of unserviceable materials within 100 metres lead impervious coat over RCC slab SSR NO TBSC-U.I12 Sl.No.882
370.73
10
3819
CIVIL WORK;Dismantaling of existing rough shabad stone flooring andserviceble materials stacking at site for reusing and unserviceable materials clearing away all the debries from the site of work including all labour charges etc., complete for finished item of work.
180.29
13
2470
CIVIL WORK;Dismantaling of Brick Masonry in Cement Mortar and Clear all the debries away from the site and including Labour Charges etc Complete for finished item of work.
14.49
3165
45871
CIVIL WORK;Dismantaling of existing Window and Doors and removing all the debries away from the site and including remaining the Bed Blocks etc Complete for finished item of work.
14
280
3921
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements