The APTRANSCO has issued a formal invitation for competitive bids for the Transmission Corporation Of Andhra Pradesh Limited project, for Diversion Of 5mvar Capacitor Bank (m/s.cooper Make) Along With Bay Equipment Available At 132/33kv Gajwel Ss,erection And Commissioning Of Divertd Capacitor Bank Along With Bay Equipment At 132/33kv Ganeshpally Ss. in Siddipet, Telangana, with an estimated contract value of Rs. 6,02,066. The bid opening date for this tender is 19-03-2025 and the last date for bid submission is 11-04-2025. Interested bidders for Transmission Corporation Of Andhra Pradesh Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Transmission Corporation Of Andhra Pradesh Limited - APTRANSCO Tender

Opening Date19 Mar 2025
Closing Date11 Apr 2025
Tender Amount₹ 6,02,066 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free

GEM & Bid Advisory Services

Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Erection of Capacitor Bank including series reactor of 7.5MVAR capacity 220 and 132kV

1

6549

6549

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;LOADING / UNLOADING OF CONTROL CABLES UP TO 6 CORE 220 & 132KV (UNLOADING OF 2 CORE CABLE)

0.4

145

58.22

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Supply and spreading of crusher dust in the switch yard area (100mm thick) in two layers of 50mm each including Suitable antiweed treatment after completion of final levelling and grading including disposal of surplus earth and filling within switch yard area including cost of all materials, head load lead upto 100 mts and initial lift etc., labour charges complete as per the directions of the Engineer in charge for the finished item of work. (Live SS Work)

11

1593

17526.85

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Cases containing LAs 33kV

3

20

61.26

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;LOADING / UNLOADING OF CONTROL CABLES ABOVE 6 CORE 220 & 132KV (UNLOADING OF 10 CORE CABLE)

0.15

194

29.12

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Loading /Unloading of panther ACSR 220 and 132kV

0.05

242

12.14

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Loading / Unloading of loading / Unloading of 220 and 132kV 33kV Breaker (loading of 33kV VCB)

1

965

965.18

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Circuit breakers including Ploe to Pole cable wiring and terminations. (Dismantling of 33kV VCB)

1

5520

5520

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Supply of GI FLAT 50X8MM

155

89

13892.65

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Loading /Unloading of Steel 220 and 132kV (unloading of structure)

1.12

220

247.15

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Laying of earth mat including Excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per Drg. No.SET(P)/149/82 with the following sizes of MS Flats / GI Flats.(for 220kV and 132kV) including fabrication. 220 and 132kV 50x 8mm MS Flat / GI Flat.

50

89

4450

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Labour charges for picking old metal in the existing switch yard area 50 to 100mm thickness grading and stacking the useful 20mm graded metal for re-using including cost andconveyance of all materials labour charges, head load lead upto 100mts and initial lift etc., complete for finished item of work as directed by the Engineer-in-charge at site.

6

271

1627.44

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Providing Stone Crusher dust filling below the foundations as per the standard specifications of APDSS in uniform horizontal layers including cost and conveyance of all materials, watering and ramming, tools & tackles, all labour charges, all leads &lifts etc, complete for finished item of work as per directions of the Engineer-in-charge. ( APSS No. 309&310)

3

1441

4324.92

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Loading /Unloading of Steel 220 and 132kV (loading of structure)

1.12

220

247.15

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Excavation in Hard Rock requiring control blasting where ever necessary. The rate includes labour charges, cost of blasting materials, tools and tackles, safety measures, disposal of unuseful excavted material at all leads and lifts, complete for finished item of work as per directions of the Engineer-in-charge.

5

1158

5792.3

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Excavation of earth pit, putting cast iron pipe with flange on one end (as per ISS7181/86) of nominal dia 125mm and 2.75 meters long in side the pit including supply and Fixing RCC collars 0.75 meter dia (OD), 50mm thick and 0.60meters long in side the pit, backfill the pit in the 25mm size granules of BHcoke for full depth of the pit with alternate layers of BH coke and salt of 300mm thick around the earth pipe of 150mm on all the sides of the pipe including cost and conveyance of BH coke, salt, clamps, C.I.Pipes and RCC collars, labour charges for all operational and incidental items of work etc., complete. 220 and 132kV

2

15077

30154

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Erection of Marshalling boxes 220 and 132kV

1

530

530

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Current Tranformers.

3

1149

3447

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Laying of Cement Concrete (1:4:8) mix using 40mm size HBG metal Machine crushed for foundations including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge.

2.5

5123

12809.48

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Erection of Capacitor Bank including series reactor of 7.5MVAR capacity 220 and 132kV (Dismantling of capacitor bank)

1

4911

4911.75

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;LOADING / UNLOADING OF CONTROL CABLES UP TO 6 CORE 220 & 132KV (LOADING OF 6 CORE CABLE)

0.15

145

21.83

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Seignioarage charges including SMET

3859

1

3859

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Erection of the Main and auxiliary structures etc., using bolts and nuts. 220 and 132kV (Dismantling of aux. structures)

1.12

2739

3068.52

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;LOADING / UNLOADING OF CONTROL CABLES UP TO 6 CORE 220 & 132KV (LOADING OF 4 CORE CABLE)

0.4

145

58.22

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Lightning Arrestors. (Dismantling of 33kv LA)

3

514

1543.5

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Supply and laying of 180 GSM LDPE sheet of approved make in the switch yard including laying the sheet neatly in between layers of crusher dust without folds to avoid the vegetation and weed growth, cutting and jointing the sheet properly including cost & conveyance of all materials, all leads , labour charges for laying complete as per the directions of the Engineer in charge for the finished item of work.

110

20

2200

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;LOADING / UNLOADING OF CONTROL CABLES UP TO 6 CORE 220 & 132KV (UNLOADING OF 6 CORE CABLE)

0.15

145

21.83

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Laying of Plain Cement concrete (PCC) - Nominal Mix (1:3:6) with 20mm graded HBG metal for encasing/embedding the structural steel supportng 'Y' angles with necessary form work including cost and conveyance of all materials, labour charges, curing and water charges, tools and tackles, all leads & lifts etc., complete for finished item of work as per directions of the Engineer-in-charge. (IS-456)

0.2

6271

1254.36

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Cases containing CTs, PTs, CVTs 11kV to 33kV rating (unloading of 33kv cts)

3

97

291.66

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Spreading the useful 20mm graded Metal available from the stacks picked from existing switchyard area to 100mm thickness as directed after doing the micro levelling and providing suitable PCC guage block of size 100x100x100mm at 2m x2m intervals , cost & conveyance of all materials, labour charges, head load lead upto 100mts and initial lift etc. complete as per the directions of the Engineer in charge for the finished item of work.

6

293

1759.44

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Supply of 100X16MM MS FLAT

378

68

25783.38

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Erection of the Main and auxiliary structures etc., using bolts and nuts. 220 and 132kV

1.59

3653

5808.27

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Cases containing Control and Relay Panels 33kV

1

322

322.12

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Supply & fixing 15 mm brass body CP finish bib cock of not less than 300 grams weight (Jaquar/ CERA/ H & R Johnson make) heavy duty including cost and conveyance, labour for fixing complete as per the directions of the Engineer in charge for the finished item of work.

2

300

600

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;TRANSPORTATION OF MATERIAL/ EQUIPMENT (TRANSPORATION CHARGES FOR MATERIALS DRAWN FROM STORES)

1

1454

1454.93

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Laying of earth mat including Excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per Drg. No.SET(P)/149/82 with the following sizes of MS Flats / GI Flats.(for 220kV and 132kV) including fabrication. 220 and 132kV 100x16mm MS Flat / GI Flat.

30

113

3390

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Goods and service Tax@18%

0.18

510002

91800.37

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 500/ 500D/550D) grade as per IS 1786-1979) of TISCO/ SAIL/ VSP/Jindal make, different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126) -Fire Protection Wall - UPTO 3.66m HEIGHT

0.3

77524

23257.27

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Supply and Spreading of 20mm size graded Hard Broken Granite metal in switch yard (100mm thick) providing suitable PCC guage block of size 100x100x100mm at 2m x2m intervals , cost & conveyance of all materials, labour charges, head load lead upto 100mts and initial lift etc. complete as per the directions of the Engineer in charge for the finished item of work (Live SS Works)

5

2137

10689

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Laying of earth mat including Excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per Drg. No.SET(P)/149/82 with the following sizes of MS Flats / GI Flats.(for 220kV and 132kV) including fabrication. 220 and 132kV 50x 8mm MS Flat / GI Flat.

50

89

4450

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Plastering to Uneven surfaces of RR /CR, PCC with CM(1:5) 20mm. thick including cost & conveyance of all materials, labour charges, leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work.

10

274

2747.1

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;TRANSPORTATION OF MATERIAL/ EQUIPMENT (TRANSPORATION CHARGES FROM 132KV GAJWEL TO 132KV GANESHPALLY)

1

3721

3721.51

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Cases containing LAs 33kV

3

20

61.26

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Supply of GI EARTH BONDS

30

216

6480

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Supply of MS FLAT 50X8MM

155

68

10572.55

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Loading / Unloading of Loading / Unloading of 220 and 132kV Neutral C.T. (loading of nct)

1

88

88.22

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Supply of GI LATTICE STRUCTURES FOR SUBSTATIONS(33kV TD Structure 1No. and 1No 33kV BD Boom447.48kgs weight of structures ,bolts and nuts

0.47

94744

44529.68

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Loading / Unloading of Loading / Unloading of 220 and 132kV 5 MVAR (loading of capacitor bank)

1

1285

1285.92

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Current Tranformers. (Dismantling of NCT)

1

861

861.75

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Loading / Unloading of Loading / Unloading of 220 and 132kV 33 kV Isolators (without soild core insulators)

1

160

160.37

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Loading / Unloading of loading / Unloading of 220 and 132kV 33kV Breaker (unloading of 33kv VCB)

1

965

965.18

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Loading / Unloading of Loading / Unloading of 220 and 132kV Neutral C.T. (unloading of nct)

1

88

88.22

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Current Tranformers.

1

1149

1149

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Supply of 33KV CT MARSHALLING BOX

1

1254

1254.91

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Erection of control / relay panels, LTAC panels, announciation, PTDB panels etc.,in the control room duly mounting them on channels and grouting them with foundation bolts excluding cost of channels and foundation bolts (for 220kV and 132kV), including man power support toMRT wing for commissioning. 220 and 132kV .(Dismantling of control and relay panel)

1

2433

2433.75

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Supplying and fixing 22.2 mm OD CPVC pipes of SDR 13.50of premium make Supreme/ Prince/ Astral/ Birla Aerocon including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charge.

4

360

1442.24

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Cases containing Control and Relay Panels 33kV

1

322

322.12

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Circuit breakers including Ploe to Pole cable wiring and terminations.

1

7360

7360

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Laying of control cables of all sizes (from 2 core. 1.5/2.5 / 4.0 Sq. mm. to 20 core, 1.5/2.5/4.0sqmm , both copper and alluminium in cable trenches including cost of suitable metalic cable glands with rubber lining. Note: This includes running of cables in control room where cables are run on cable racks in cable duct.

1100

13

14300

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Construction of RR Masonry in CM (1:6) using hard CRS, rough granite stone and bond stones (0.16 cum) including cost and conveyance of all materials., labour charges, water lead , Curing, all leads and lifts etc., complete for finished item of work as per directions of the Engineer-in-charge.

2.5

4838

12096.62

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Loading / Unloading of Loading / Unloading of 220 and 132kV 33 kV Isolators (without soild core insulators)

1

160

160.37

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;LOADING / UNLOADING OF CONTROL CABLES UP TO 6 CORE 220 & 132KV (UNLOADING OF 4 CORE CABLE)

0.4

145

58.22

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;LOADING / UNLOADING OF CONTROL CABLES UP TO 6 CORE 220 & 132KV (loADING OF 2 CORE CABLE)

0.4

145

58.22

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Cable terminations to the switchgear, Marshalling boxes / panel terminal blocks/control and relay Panels, LTAC panel including providng suitable ferrules and lugs as per specification (including cost of ferrules and lugs) (for 220kV and 132kV). 220 and 132kV 1.5/2.5 Sq.mm. Copper with copper lugs each core at both ends..

100

39

3900

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Connection of equipment to bus and or another equipment with single Zebra/Moose/panther Conductor including measuring, cutting,clamping and Hoisting of suspension insulator assembly to support the Conductor wherever necessary. 220 and 132kV

25

354

8850

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Isolators including solid core insulators Erection, alignment in full shape for smooth operation.

1

2374

2374

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Plastering with CM (1:5), 12 mm thick and finishing smooth to the required slope and painting two coats of Janatha Cem including cost & conveyance of all materials, labour charges, leads, lifts and curing including cost of Janatha Cem paint two coats,complete as per the directions of the Engineer in charge for the finished item of work.

17

227

3874.47

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Loading / Unloading of Loading / Unloading of 220 and 132kV 5 MVAR (unloading of capacitor bank)

1

1285

1285.92

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Current Tranformers. (Dismantling of 33kV CTs)

3

861

2585.25

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Supplying and fixing 28.6 mm OD CPVC pipes of SDR 13.50 of premium make Supreme/ Prince/ Astral/ Birla Aerocon including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charge.

20

448

8977

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Cases containing CTs, PTs, CVTs 11kV to 33kV rating (loading of 33kv CTs)

3

97

291.66

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Loading /Unloading of panther ACSR 220 and 132kV

0.05

242

12.14

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;LOADING / UNLOADING OF CONTROL CABLES ABOVE 6 CORE 220 & 132KV (LOADING OF 10 CORE CABLE)

0.15

194

29.12

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Connection of equipment to bus and or another equipment with single Zebra/Moose/panther Conductor including measuring, cutting,clamping and Hoisting of suspension insulator assembly to support the Conductor wherever necessary. 220 and 132kV (disconnection equipment one with another)

22

265

5841

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Brick Masonry in CM (1:6) with common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size 23 x 11 x 7 cms of approved quality,including cost & conveyance of all materials, labour charges, scaffolding leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work . - without Scaffolding

3

8150

24451.56

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Dismantling of existing stone masonry up to 3 m height, including carefully stacking materials useful for re use and clearing all debris away from the site with initial lead & lift labour charges, T&P complete as per the directions of the Engineer in charge for the finished item of work.

2

582

1164.36

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Lightning Arrestors.

3

686

2058

... More
Diversion of 5MVAR capacitor bank (M/s.Cooper Make) from 132kV Gajwel,Erection at 132kV Ganeshpally;Erection of control / relay panels, LTAC panels, announciation, PTDB panels etc.,in the control room duly mounting them on channels and grouting them with foundation bolts excluding

1

3245

3245



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.