For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 11,800
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
272784Bid Award Id
ViewTender No
48/CE/TSIIC/2021-22, Dated:12.10.2021Tender Authority
Telangana State Industrial Infrastructure Corporation Limited ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Arkathala;Providing and laying of 50 mm thick Dense Graded Bituminous Macadam with 100-120 TPH batch type hot mix plant using HBG crushed aggregates of Grading - II as per table 500-10 of MoRT & H Specification 505 (5th revision) premixed with bitumen VG-10 grade @ 4.25% of wieght of total mixture, transported to site, laid over a previously prepared surface with Hydrostatic sensor paver to the required grade, level and alignment and rolled as per Clauses 501.6 and 501.7 to achieve the desired compaction for finished item of work as directed by the Engineer-in-charge including hire and operational charges all T&P and all other contingent charges necessary including charges of all materials, all taxes excluding GST etc., complete and as per MoRTH speicification NO. 505 (5th Revision).
1600
-
12861920
... More
Arkathala;Providing and applying tack coat with bitumen emulsion(Rapid setting-1) over the prepared surface before laying DBM at the rate of 2.5kg/10sqm including cleaning the road surface with mechanical broom and air compressor and applying uniformity with the aid of emulsion pressure sprayer including cost and conveyance of bitumen emulsion, labour charges, cleaning, all taxes excluding GST, hire charges and operational charges of all T&P necessary to complete the finished item of work as directed by the Engineer-in-Charge as per MORT&H(5th Revision) specification 503.
30700
-
368400
... More
Arkathala;Providing and applying Primer coat with bitumen emulsion(Bulk-Slow Setting-1) over the prepared surface of granular base as Wet Mix Macadam surface at the rate of 6kg /10sqm including cleaning the road surface with mechanical broom and air compressor and spraying uniformly with the aid of bitumen pressure sprayer including cost and conveyance of bitumen emulsion and water,labour charges,cleaning,all taxes excluding GST, hire charges and operational charges of all T&P necessary to complete the finished item of work as directed by the Engineer-in-Charge as per MORT&H(5th Revision) specification 502.
30700
-
1571840
... More
Arkathala;Providing,laying,spreading and compacting graded stone aggregates to Wet Mix Macadam specification including cost and conveyance of all material, all taxes excluding GST, hire and operational charges of T&P, labour charges for all operations, premixing the material with water at OMC in mechanical mix plant, carriage of material by tipper to site, laying in uniform layers with paver finisher in sub base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density, including lighting, grading, barricading and maintenance of diversion of trafic, etc., complete for finished item of work as per tables 400.11 & 400.12 technical specification clause 406 MORT&H (5th Revision)
7300
-
15219040
... More
Arkathala;Construction of Granular sub base of 150mm thick by providing HBG/HBT material confirming to Grading-I of MORT&H Table- 401,35% of 53mm to 9.50mm HBG metal, 47.5% of 9.50mm to 4.75mm HBG metal and 17.5% of 2.36mm and below HBG metal including cost and conveyance of all materials to work site, labour charges, spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with rotavator/approved means at OMC and compacting with vibratory roller to achieve the desired density, labour charge, all taxes excluding GST etc. complete for finished item of work as per MORT&H (5th Revision) Technical specification clause no:401 as directed by the Engineer-in-charge.
8600
-
15927200
... More
Arkathala;Construction of embankment with good gravel brought from outside and spreading in layers of not more than 200mm thick each as directed by the Engineer-in-Charge during execution, watering, dozing, grading and compacting each layer to required proctors density with OMC compaction with vibratory roller of 8 Tonnes capacity, maintaining the required camber in the formation including all labour charges, hire and operational charges of power roller, mortar grader, water tanker, all water leads, cost and conveyance of all material to site, excluding GST etc., complete as per requirement of table 300.1 and 300.2 as per Technical Specification clause 301.5 MORD/305 MORT&H (5th Revision). (Payment will be based on levels for finished item of work).
28400
-
13120800
... More
Arkathala;Construction of embankment/sub-base with available useful excavated earth deposited at site by road way including watering, grading, spreading in layers of not more than 200mm thick and compacting each layer to required proctors density with OMC compaction with vibratory roller of 8 Tonnes capacity, maintaining the required camber in the formation including all labour charges, hire and operational charges of power roller, mortar grader, water tanker, all water leads, all taxes excluding GST etc., complete as per requirement of table 300.1 and 300.2 as per Technical Specification clause 301.5 MORD/305 MORT&H (5th Revision). (Payment will be based on levels for finished item of work).
600
-
79140
... More
Arkathala;Conveyance of excavated rock/soil with a lead of 5 kms and dumping on the road alignment wherever required as directed by the Engineer-in-Charge including loading ,unloading, all incidental and operational charges, including hire charges of T&P labour charges, all taxes but excluding GST etc., complete for finished item of work.
8300
-
894740
... More
Arkathala;Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, stumps and other delaterious material with initial lift of 3m and disposal with a lead of 50M, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections including all hire and operational charges of T&P, all labour charges, all taxes excluding GST etc., complete for finished item of work as directed by the Engineer-in-Charge and as per Technical Specification clause 302.3 MORD / 301 MORTH.
6000
-
5461200
... More
Arkathala;Earth work Excavation in Ordinary Rock using Hydraulic Excavator CK-90 and Tippers with Disposal upto 1000 metres., including trimming bottom and side slopes in accordance with requirement of lines, grades and cross sections, including all hire and operational charges of T&P, all labour charges, all taxes excluding GST etc., complete for finished item of work as directed by the Engineer-in-Charge and as per technical specification clause 302.3 MORD/301 MORTH. (Payment will be based on levels for finished item of work).
6000
-
967200
... More
Arkathala;Earth work Excavation for roadway in soil upto SDR by MECHANICAL Means including cutting in roadway and pushing of the earth to site of embankment upto a distance of 100 M, including trimming bottom and side slopes in accordance with requirement of lines, grades and cross sections, including all hire and operational charges of T&P, all labour charges, all taxes excluding GST etc., complete for finished item of work as directed by the Engineer-in-Charge and as per technical specification clause 302.3 MORD/301 MORTH. (Payment will be based on levels for finished item of work).
3000
-