Telangana State Industrial Infrastructure Corporation Limited Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Industrial Infrastructure Corporation Limited - TSIIC Tender

Opening Date14 Jun 2021
Closing Date21 Jun 2021
Tender Amount₹ 6,89,981 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
NP4 pipe line;Removal of wet silt and sludge from sullage drains with aid of baskets and vessels, etc with intial lift of 3M and lead of 50m including labour charges, all taxes complete for finished item of work

114

-

47404.62

... More
NP4 pipe line;Providing Granular Sub Base using HBG crushed close graded material confirming to grading -I of MoRTH table - 400.1 (50% of 53mm to 9.5mm , 20% of 9,5 to 2.36mm and 30% of 2.36mmm below)including spreading the HBG material in layers of uniform thickness not exceeding 150mm thick with motor grader on prepared surface, mixing by mix in place method at OMC and compacting with vibratory roller to achieve the desired density complete as per technical specification as directed by the Engineer-in-charge etc, including cost and conveyance of HBG material, water etc to site, labour charges for all operations, all incidentals hire & operational charges of roller and other T&P etc,, complete for finished item of work as per MoRT&H (5th Revision) Specification 401.excluding GST & Seignoriage Charges

12

-

19391.4

... More
NP4 pipe line;Precast slabs in PCC(1:2:4) grade of size 1.2X1.2X0.1m over cleaning chambers if slab culvert including cost and conveyance if akk naterials ti sute with tor steel 8mm dia at 100mm C/C both ways (12 No along the transverce direction 2 No's hocks) including its cost labour charges for all operations all taxes except GST, bar bending, laying concrete as per the size with smooth edges and depth curing the slabs, fixing in position with CM(1:5) etc., complete as directed by Engineer in charge to compete the finished item of work

5

-

7118.85

... More
NP4 pipe line;Conveyance of un use full dumping materials of 5km for transportation of materials by tipper/truck including loading, unloading, all labour charges, hire charges of T&P, complete excluding GST

237

-

22301.7

... More
NP4 pipe line;Providing, laying, spreading and compacting graded stone aggregates to Wet Mix Macadam specification including cost & conveyance of all material, hire and operational charges of T&P, labour charges for all operations, premixing the material with water at OMC in mechanical mix plant, carriage of material by tipper to site, laying in uniform layers with paver finisher in subbase/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density, including lighting, grading, barricading and maintenance of diversion of traffic, etc., complete for finished item of work, as per table 400.13 of technical specification clause 406 MORTH(5th Revision). Except GST& Seigniorage charges,

12

-

22611.24

... More
NP4 pipe line;Excavation for roadwork/ Removal of debris/ High Berms on sides of roads in soil with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m, all taxes except GST as per MORTH - 301.(pipe portion)

116

-

6939.12

... More
NP4 pipe line;Providing and laying Plain Cement Concrete (1:2:4) corresponding to M-15 grade using 6-12mm nominal size well graded machine crushed hard granite chips (coarse aggregate) from approved quarry including cost, conveyance of all materials and all labour charges, machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, all incidental and operational charges,complete for finished item of work for coping excluding GST & Seignoriage Charges, as per MORTH specification 2100.(For DPC)

8

-

40968.72

... More
NP4 pipe line;Construction of un-reinforced dowel jointed at expansion and construction joint only, plain cement concrete pavement M30 (Grade) over a prepared sub base, coarse and fine aggregates conforming to IS : 383, Crushed stone aggregate of 25mm and 12.5mm size graded as per table 1500.1, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design with minimum cement content of 350 kg/cum laid in alternate panels with approved fixed side formwork of steel channel, wedges, steel plates including levelling the formwork as per drawing, cleaning the surface with air compressor initially and finally, laying and fixing of 125 micron thick approved polythene film made of 100% virgin LDPE, laying and spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation to lines and grade, curing of concrete slabs for 14- days including cost, and conveyance of all material, labour charges for all operations, all taxes, hire and operational charges of all T&P, diversion of traffic etc. complete for finished item of work as per drawing and Technical Specification Clause 1501 MORD. (except GST & Seignoriage

12

-

90255

... More
NP4 pipe line;Cutting Road surface including breaker charges, labour charges, operational and incidental charges, all taxes etc., except GST, complet for finished item of work - CC Cutting

4.5

-

11641.55

... More
NP4 pipe line;Flush pointing to R.R.masonry in CM(1:3) including cost and conveyance of all materials to site, labour charges for all operations, curing, scaffolding, all taxes etc.,complete for finished item of work. excluding GST & Seignoriage Charges

91

-

10173.8

... More
NP4 pipe line;BT- Cutting

2.5

-

3107.38



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.