Telangana State Industrial Infrastructure Corporation Limited Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 2,360
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
308170Bid Award Id
ViewTender No
44/ZM/TSIIC/MDCL-SDPT/2021-22 Dt. 31.03.2022Tender Authority
Telangana State Industrial Infrastructure Corporation Limited ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
pipe line;Laying Plain Cement concrete (1:4:8) Prop using 40mm size HBG machine crushed stone aggregate confirming to table 1000-1 and fine aggregate { 50% of River Sand (Natural Sand) & 50% of Manufactured Sand/Crushed stone sand/Rock sand 4.75mm to 2.36 mm confirming to IS 383 } conforming to table 1000-2 of MORT&H specification including cost and conveyance of all materials (viz) cement, stone aggregate, sand, water etc., to site, labour charges for all operations, machine mixing, laying, finishing smooth to required level, curing, all other incidental and operational charges etc, complete for finished item of work as per MORT&H specification 2100 (5th revision) and as directed by the Engineer-in-charge. for open foundations. Except GST & Seigniorage charges,
8.25
-
34274.87
... More
pipe line;Providing and Making with MS Structures of different thickness, cutting and fabricating to required sizes and shapes, placing in position as per approved designs and drawing to be supplied at the time of execution of work, including cost and conveyance of all MS TUBES of different sizes, thickness, sections and all wastages such as overlaps, couplings, welded joints, etc., and all operational, incidental, Labour charges for fabricating MS Tube including cost of welding rods, power charges, including cost of Labour charges for fabricating all heavy steel works like Trusses, Stanchions, Heavy Beams and Girders including cost of welding rods, power charges, etc including cost of fixing in position but excluding GST etc. complete for finished item of work. As per the approved drawings, designs are to be vetted with the third pary from reputed Govt Institutions viz., IIT, NIT, Universities.
450
-
76113
... More
pipe line;Flush pointing to RR Masonry in CM (1:4), including cost and conveyance of all materials to site, labour charges for all operations, curing, scaffolding etc., complete for finished item of work,, as per MORTH Specification 1300 & 2200 (5th revision). Excluding GST & Seigniorage charges
74.1
-
9237.31
... More
pipe line;Providing laying Reinforced cement concrete Hume Pipe of NP-3 class 600.00mm dia lR.C.C. Spun / Vibrated Cast (Reinforced) Socket and Spigot pipes pipe including cost and conveyance of pipe, etc, except GST & Seigniorage charges,, complete and labour charges for laying, jointing of RCC Hume pipe in position with Cement Mortar (1:2) including lifting, aligning, lowering and hoisting etc., as per drawing and as per MORTH specification 2900,2905 and 2906 and as directed by Engineer-in-charge for finished item of work for Pipe culvert .
130
-
563045.6
... More
pipe line;Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/ liter for exterior walls including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit,all taxes except GST complete for finished item of work in all floors.
147
-
43708.98
... More
pipe line;Providing and laying Plain Cement Concrete (1:2.5:5) corresponding to M-15 grade using 6-12mm nominal size well graded machine crushed hard granite chips (coarse aggregate), fine aggregate { 50% of River Sand (Natural Sand) & 50% of Manufactured Sand/Crushed stone sand/Rock sand 4.75mm to 2.36 mm confirming to IS 383 } from approved quarry including cost, conveyance of all materials and all labour charges, machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, all incidental and operational charges,complete for finished item of work for coping except GST & Seigniorage charges, as per MORTH specification 2100.
5
-
26637.5
... More
pipe line;Refilling foundations and basement /pipe line trenches with useful excavated soils (other than black cotton soils and other expansive soils) with initial lead and lifts spreading in layers not exceeding 150mm thick, consolidating each deposited layer by watering and ramming, compaction by earth masters to achieve density control of not less than 95 percent including cost and conveyance of water to work site and all operational, incidental, labour charges, all taxes, hire charges of T&P etc., complete for finished item of work. (APSS No. 309 & 310). Excluding GST
116.04
-
4676.41
... More
pipe line;Earth work in excavation for culverts & drains by using Hydraulic excavator and depositing the earth on road side or as directed by the Engineer-in-Charge with an initial lead of 50mts in all soils upto SDR in all conditions including all operational, incidental and labour charges such as dry, wet, slushy, setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom, sheeting, planking, strutting, etc., complete for finished item of work etc., complete as per MORTH (5th Revision) specification 304. Excluding GST
280.2
-
34097.54
... More
pipe line;Conveyance of excavated soils with machinery per 5km for transportation of materials by tipper and truck including loading un loading the following lead and dumpiing on the road alignment wherever required as directed by Engineer -in- charge. Excluding GST and Seigniorage Charges
164.16
-
17696.45
... More
pipe line;Brick Masonary walls of 115mm in CM(1:6) using 2nd class traditional bricks of size 230x110x70mm conforming from approved source having a crushing strength of not less than 35.00kg/cm2 including cost and seignorage charges and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as scaffolding mixing mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and its fabrication charges for finished item of work. BLD-CSTN(5-4) Pg No.31
16.91
-
120842.41
... More
pipe line;Dismantling of existing Brick Masonry structures, retaining walls and other structure comprising of masonary, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m as per Technical Specification Clause 202 MORD / MORTH. RBR-STCL-5(ii) / PG.No-283
7
-
22314.18
Evaluation Notes How It Works ?
Potential Partner