Telangana State Industrial Infrastructure Corporation Limited Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 5,900
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
260464Bid Award Id
ViewTender No
32/CE/TSIIC/2021-22, Dated:10.08.2021Tender Authority
Telangana State Industrial Infrastructure Corporation Limited ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Road work Sultanpur;Providing two or more coats of Water proof cement paint of approved make, shade and colour to give uniform shade over a primary coat of with cement primer Grade-II (total 3 or more coats) including cost and conveyance of all materials to site including , all labour charges such as preparation of the wall surface, applying priming coat, applying water proof cement paint two coats, curing, etc., complete for finisihed item of work , excluding GST as per Clause no. 912
20
-
3640
... More
Road work Sultanpur;Providing and laying Vibrated Cement Concrete corresponding to M-20 grade Design mix using 20 mm &10mm sizewell graded machine crushed hard granite chips (coarse aggregate) fine aggregate { 50% of River Sand (Natural Sand) & 50% of Manufactured Sand/Crushed stone sand/Rock sand 4.75mm to 2.36 mm confirming to IS 383 } including cost and conveyance of all materials like cement, & fine aggregate { River Sand (Natural Sand) & manufactured Sand/Crushed stone sand/Rock sand } , coarse aggregate, water etc. to site, sales and other taxes except GST & seigniorage charges on all materials , but including all charges for machine mixing, laying concrete in foundations, complete for finished item of work as per MORTH specification 1500, 1700 & 2100.
15
-
104638.35
... More
Road work Sultanpur;Providing laying Reinforced cement concrete Hume Pipe of NP-3 class 1000mm dia plain ended tongue and groove model pipe including cost and conveyance of pipe, etc, complete and labour charges for laying, jointing of RCC Hume pipe in position with Cement Mortar (1:2) including lifting, aligning, lowering and hoisting etc., as per drawing and as per MORTH specification 2900,2905 and 2906 and as directed by Engineer-in-charge for finished item of work for Pipe culvert, excluding GST & Seignoriage Charges,
25
-
223035.25
... More
Road work Sultanpur;Stone Dust Filling before laying NP3 RCC Plain ended pipes in trenches and basement with initial lead in layers not exceeding 15cm thick,consolidating each deposited layer by watering and remaining including cost and conveyance of water to work site and all operational, incidental, labour charges,hire charges of T&P etc., complete for furnished item of work, Excluding GST & Seigniorage charges. (APSS No.309 &310)
35
-
28782.25
... More
Road work Sultanpur;Plain Cement Concrete (1:4:8) mix using 40mm size hard broken granite metal, coarse aggreagte and fine aggregate (50% River sand 50% Rock sand) including cost and conveyance of all materials to site, machine mixing charges, labour charges, placing in position, levelling, vibrating, curing etc., complete for finished item of work as directed by the Engineer-in-charge, as per technical specification clause No. 2100 of Morth, Excluding GST & Seigniorage charges. For Crash barrier
35
-
137965.1
... More
Road work Sultanpur;Plain Cement Concrete (1:4:8) mix using 40mm size hard broken granite metal, coarse aggreagte and fine aggregate (50% River sand 50% Rock sand) including cost and conveyance of all materials to site, machine mixing charges, labour charges, placing in position, levelling, vibrating, curing etc., complete for finished item of work as directed by the Engineer-in-charge, as per technical specification clause No. 2100 of Morth, Excluding GST & Seigniorage charges. For Culverts
5
-
19709.3
... More
Road work Sultanpur;Earth work in excavation by using Hydraulic excavator and depositing the earth on road side or as directed by the Engineer-in-Charge with an initial lead of 50mts in all soils upto SDR in all conditions including all operational, incidental and labour charges such as dry, wet, slushy, setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom, sheeting, planking, strutting, etc., complete for finished item of work excluding dewatering charges excluding GST etc., complete as per MORTH (5th Revision) specification 304. For Crash barrier
140
-
17036.6
... More
Road work Sultanpur;Earth work in excavation by using Hydraulic excavator and depositing the earth on road side or as directed by the Engineer-in-Charge with an initial lead of 50mts in all soils upto SDR in all conditions including all operational, incidental and labour charges such as dry, wet, slushy, setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom, sheeting, planking, strutting, etc., complete for finished item of work excluding dewatering charges excluding GST etc., complete as per MORTH (5th Revision) specification 304. For Culverts
35
-
4259.15
... More
Road work Sultanpur;Providing gravel berms to the required thickness including spreading in layers not more than 200 mm thick with side slope of 2:1 (2H:1V), sectioning each layer to proper camber, watering, consolidation of each layer with vibratory roller of 8 to 10 tonnes capacity to achieve the desired density at OMC including cost and conveyance of gravel, water etc., to site, labour charges for all operations, hire and operational charges of vibratory roller and other T & P, diversion of traffic, complete for finished item of work as per MORTH Specification 401, excluding GST & seigniorage charges.
1350
-
736857
... More
Road work Sultanpur;Filling with good gravel brought from outside in Central Verge upto Kerb Stone top level and filling in not more than 200mm thick in each layer with approved material spreaded, graded and compacted with plate compactor to achieve the desired density, including cost and conveyance of all material, seigniorage charges, labour charges for all operations, hire and operational charges all T&P, diversion of traffic ect complete for finished item of work as per clause 407 MORTH.except GST & Seigniorage charges.
1050
-
718798.5
... More
Road work Sultanpur;Painting to Kerb with 2 or more coats of Synthetic Enamel paint grade-I of approved brand (Asian/Berger/Nippon) and shade over a base coat of appropriate primer of approved brand, making 3 coats or more in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work, excluding GST as per Clause 1212
320
-
60112
... More
Road work Sultanpur;Supply and fixing of M20 Grade Pre Cast Kerb Stone of Size 600x115x400 including cost and conveyance of all materials like pre cast kerb stone, cement sand etc to site, seigniorage charges, loading, unloading, kerb stone transportation charges, labour charges for fixing kerb stone true to alignment, mixing charges, jointing to a full depth and width with CM(1:4) Proportion, curing, all incidental and operational charges and all other taxes except GSTetc., complete for finished item of work.
1100
-
705837
... More
Road work Sultanpur;Providing and laying 30 mm thick bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.0 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction including hire and operational charges of all T & P, cost and conveyance of all materials to site, labour charges for all operations, diversion of traffic, etc., complete for finished item of work as per MORTH specification clause No. 509 complete in all respects, excluding GST & seigniorage charges.
220
-
1860364
... More
Road work Sultanpur;Providing and applying Tack coat with Bitumen Emulsion rapid setting over the prepared surface before laying BC @2kg/10Sqm including cleaning the road surface with mechanical broom and air compressor and applying uniformity with the aid of emulsion pressure sprayer including cost and conveyance of bitumen emulsion, labour charges, cleaning, all taxes hire charges and operational charges of all T & P necessary to complete the finished item of work as directed by the Engineer-in-Charge as per MORT&H(5th Revision) specification503. excluding GST
7050
-
70147.5
... More
Road work Sultanpur;Providing and laying dense graded bituminous macadam of 50mm thick with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.25 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. Except GST & Seiniorage charges
370
-
2792179.1
... More
Road work Sultanpur;Providing and applying Tack coat with Bitumen Emulsion rapid setting-1 over the prepared surface before laying DBM @2.5kg/10Sqm including cleaning the road surface with mechanical broom and air compressor and applying uniformity with the aid of emulsion pressure sprayer including cost and conveyance of bitumen emulsion, labour charges, cleaning, all taxes hire charges and operational charges of all T & P necessary to complete the finished item of work as directed by the Engineer-in-Charge as per MORT&H(5th Revision) specification503. excluding GST
7050
-
84106.5
... More
Road work Sultanpur;Providing and applying Primer coat with bitumen emulsion(Bulk-Slow Setting-1) over the prepared surface of granular base as Wet Mix Macadam surface at the rate of 6kg /10sqm including cleaning the road surface with mechanical broom and air compressor and spraying uniformly with the aid of bitumen pressure sprayer including cost and conveyance of bitumen emulsion and water,labour charges,cleaning,all taxes hire charges and operational charges of all T&P necessary to complete the finished item of work as directed by the Engineer-in-Charge as per MORT&H(5th Revision) specification 502.excluding GST ,
7050
-
357787.5
... More
Road work Sultanpur;Providing, laying, spreading and compacting graded stone aggregates as per table 400.11 to Wet Mix Macadam, including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver finisher in subbase/ base course on well prepared surface and compacting with vibratory roller 8-10 T capacity to achieve the desired density, specification including cost & conveyance of all materials, hire and operational charges of T&P, labour charges for all operations including lighting, grading, barricading and maintenance of diversion of trafic, etc., complete for finished item of work as per technical specification clause 406 MORTH, excluding GST & seigniorage charges.
1650
-
3036016.5
... More
Road work Sultanpur;Formation of Granular Sub Base using HBG crushed close material confirming to grading III of MORTH Table- 400-1, (52.5% of 2.36 mm below, 35 % of 9.5 mm to 4.75 mm and 12.5 % of 4.75 mm to 2.36 mm) including spreading the HBG meterial in layers of uniform thickness not exceeding 150mm thick with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density complete as per technical specification and as directed by the Engineer-in-charge, etc. including cost and conveyance of HBG material, water etc to site, labour charges for all operations, all incidental hire & operational charges of roller and all other T&P, complete for finished item of work as per MORTH clause No: 401, excluding GST & seigniorage charges.
1150
-
1601306
... More
Road work Sultanpur;Construction of rock fill embankment with broken hard rock fragments of size not exceeding 300 mm laid in layers not exceeding 500 mm thick including filling of surface voids with stone spalls, blinding top layer with granular material, rolled with vibratory road roller, as directed by the Engineer-in-Charge ect., complete as per clause 313 Morth, excluding GST
1700
-
139587
... More
Road work Sultanpur;Construction of Embankment with useful gravel from approved source with all leads and lifts, transportation to site, including spreading,grading, watering and compacting each layer not more than 200mm thick to required proctors density with OMC compaction with vibratory roller of 8 to 10 Tonnes capacity as per requirement of table 300.2, maintaining the required camber in the formation including all labour charges, hire & operational charges of power roller, mortar grader, water tanker, all water leads, all other taxes except GST etc.complete as per Technical Specification clause 305 MoRTH.
2400
-
1359816
... More
Road work Sultanpur;Earth Work Excavation by mechanical means for road work with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with all lifts and lead upto 1000 m as directed by the Engineer-in-Charge including setting out, removal of stumps and all other deleterious matter, all operational & incidental charges, hire & operational charges of all T&P, all other taxes except GST etc., complete in all soils up to SDR as per Technical Specification Clause 301 MORTH
500
-
63730
... More
Road work Sultanpur;Excavation for roadway in Hard Rock (requiring Blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross-sections, loading including stacking the excavated material for road formation, and desposal of unused rock in low lying areas or as directed by the Engineer - in - Charge with all lifts and leads upto 1 km including all operations, incidental,and labour charges setting out,construction of bracing and shoring, removal of stumps and all other deleterious material, sheeting, planking, strutting, all other taxes except GST etc., complete for finished item of work, as per MoRTH Specification Clause 301.
2000
-
496440
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements