For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Industrial Infrastructure Corporation Limited - TSIIC Tender

Works
Civil And Construction
Road Construction
Excavation
Opening Date26 Aug 2023
Closing Date1 Sep 2023
Tender Amount₹ 2,11,69,604 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road Narmala;Providing and laying Plain Cement Concrete M-20 grade using 10-20mm nominal size well graded machine crushed hard granite chips (coarse aggregate) from approved quarry including cost, conveyance and seigniorage charges of all materials and all labour charges, machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing for 14 days, all incidental and operational charges,complete for finished item of work excluding GST seigniorage charges

55

5116

281399.25

... More
Road Narmala;Providing laying Reinforced cement concrete Spun Pipe of NP-4 class 1000mm dia Plain ended pipes conforming to B.I.S 458/2003 pipe including cost and conveyance of pipe, etc, excluding GST, complete and labour charges for laying, jointing of RCC Hume pipe in position with Cement Mortar (1:2) including lifting, aligning, lowering and hoisting etc., as per drawing and as per MORTH specification 2900,2905 and 2906 and as directed by Engineer-in-charge for finished item of work for Pipe culvert excluding Seigniorage charges

80

12796

1023748

... More
Road Narmala;Storm Wtaer Drains

220

3693

812471

... More
Road Narmala;Laying Plain Cement concrete (1:4:8) Prop using 40mm size HBG machine crushed stone aggregate confirming to table 1000-1 and fine aggregate conforming to table 1000-2 of MORT&H specification including cost, seigniorage conveyance of all materials (viz) cement, stone aggregate, sand, water etc., to site, labour charges for all operations, machine mixing, laying, finishing smooth to required level, curing, all other incidental and operational charges etc, complete for finished item of work as per MORT&H specification 2100 (5th revision) and as directed by the Engineer-in-charge excluding GST seigniorage charges for open foundations. Culverts

20

3693

73861

... More
Road Narmala;Storm Wtaer Drains

1950

129

252037.5

... More
Road Narmala;For Culverts & Storm Water Drains Earth work in excavation for culverts & drains by using Hydraulic excavator and depositing the earth on road side or as directed by the Engineer-in-Charge with an initial lead of 50mts in all soils upto SDR in all conditions including all operational, incidental and labour charges such as dry, wet, slushy, setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom, sheeting, planking, strutting, etc., complete for finished item of work excluding dewatering charges & GST, etc., complete as per MORTH (5th Revision) specification 304. Culverts

220

129

28435

... More
Road Narmala;Providing gravel berms to the required thickness including spreading in layers of 150 mm thick with side slope of 2:1(2H:1V),sectioning each layer to proper camber, watering, consolidation of each layer with vibratory roller of 8 to10 tonnes capacity to achieve desired density at OMC including cost conveyance of gravel, water etc., to site, labour charges for all operations, hire and operational charges of vibratory roller and other T&P diversion of traffic, etc., complete for finished item of work,as per MORT&H (5th Revision) Spc.No.401. excluding GST & Seignoriage Charges

2480

478

1186035.2

... More
Road Narmala;Providing and laying bituminous concrete of 30mm thick with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading-II, premixed with bituminous binder VG-30@ 5.4% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH (5TH REVISION) specification clause No. 507complete in all respects excluding GSTand seigniorage charges

180

9778

1760198.4

... More
Road Narmala;Providing and applying Tack coat with Bitumen Emulsion rapid setting over the prepared surface before laying BC @2kg/10Sqm including cleaning the road surface with mechanical broom and air compressor and applying uniformity with the aid of emulsion pressure sprayer including cost and conveyance of bitumen emulsion, labour charges, cleaning, all taxes hire charges and operational charges of all T & P necessary to complete the finished item of work as directed by the Engineer-in-Charge as per MORT&H(5th Revision) specification503. excluding GST

5930

11

66534.6

... More
Road Narmala;Providing and laying dense graded bituminous macadam of 50mm thick grade-II material with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.50 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction including hire and operational charges of all T & P Cost and conveyance of all materials labour charges for all operations diversion of traffic, etc., complete (except GST & Seiniorage charges)for finished item of work as per MoRTH 5th revision specification clause No. 505 complete in all respects.

300

8299

2489763

... More
Road Narmala;Providing and applying Tack coat with bitumen emulsion (RS-1)(Rapid Setting) over the prepared surface before laying DBM at the rate of 2.5kg/10 sqm including cleaning the road surface with mechanical broom and air compressor and applying uniformly with the aid of emulsion pressure sprayer including cost and conveyance of bitumen emulsion, labour charges, cleaning, hire charges and operational charges of all T&P necessary to complete the finished item of work as directed by the Engineer-in-Charge as per MORTH (5th Revision) specification 503. excluding GST

5930

14

83138.6

... More
Road Narmala;Providing and applying Primer coat with bitumen emulsion(Bulk-Slow Setting-1) over the prepared surface of granular base as Wet Mix Macadam surface at the rate of 6kg /10sqm including cleaning the road surface with mechanical broom and air compressor and spraying uniformly with the aid of bitumen pressure sprayer including cost and conveyance of bitumen emulsion and water,labour charges,cleaning,all taxes hire charges and operational charges of all T&P necessary to complete the finished item of work as directed by the Engineer-in-Charge as per MORT&H(5th Revision) specification 502.excluding GST ,

5930

58

343999.3

... More
Road Narmala;Providing, laying, spreading and compacting graded stone aggregates to Wet Mix Macadam specification including cost & conveyance of all material, hire and operational charges of T&P, labour charges for all operations, premixing the material with water at OMC in mechanical mix plant, carriage of material by tipper to site, laying in uniform layers with paver finisher in subbase/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density, including lighting, grading, barricading and maintenance of diversion of trafic, etc., complete for finished item of work, as per table 400.13 of technical specification clause 406 MORTH(5th Revision). excluding GST & Seignoriage Charges

1240

2013

2497223.6

... More
Road Narmala;Construction of Granular sub-base by providing HBG/HBT material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage charges) and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401(5th revision) and as directed by the Engineer-in-charge. (Payment Based on Levels) excluding GST & Seigniorage charges

950

1753

1665673

... More
Road Narmala;Formation of embankment with good gravel obtained from outside and spreading in layers not more than 200mm thick each or as directed by the Engineer-in-Charge including pre-watering soil, removal of top soil, excavation of soils, depositing the soils on the embankment, spreading soils, breaking clods, sectioning and consolidation with vibratory roller of 8 to 10 Tonnes capacity @ OMC compaction to meet requirement of table 300.1 and 300-2 of MORT&H including labour charges for all operations, hire and operational charges of T&P and , all water leads duly maintaining the required camber in the formation etc., complete for finished item of work as per MORTH Specification clause 305 (5th Revision) (Payment will be made based on level for finished item of work). excluding GST & Seignoriage Charges.

3800

505

1919000

... More
Road Narmala;Formation of embankment / subbase with useful excavated soils obtained from Road, drains and Culverts by mechanical means and spreading in layers not more than 200mm thick each or as directed by the Engineer-in-Charge including pre-watering soil, removal of top soil, excavation of soils, depositing the soils on the embankment, spreading soils, breaking clods, sectioning and consolidation with vibratory roller of 8 to 10 Tonnes capacity @ OMC compaction to meet requirement of table 300.1 and 300-2 of MORT&H including labour charges for all operations, hire and operational charges of T&P, all water leads duly maintaining the required camber in the formation etc., complete for finished item of work as per MORTH Specification clause 305 (5th Revision) (Payment will be made based on level for finished item of work). Excluding GST

6620

142

940040

... More
Road Narmala;Conveyance of unuseful excavated earth/rock to out side with a lead upto 5.0 KM including loading, unloading, all labour charges, hire charges of T&P, complete excluding GST.

1670

116

194054

... More
Road Narmala;Excavation for roadway in hard rock (requiring blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres including all labour charges etc., complete for finished item of works as directed by Engineer-in-Charge as per Morth 301 (3.5) excluding GST.

1700

362

615468

... More
Road Narmala;Earthwork excavation for road way in soil up to SDR with Hydraulic Excavator of 0.9cum bucket capacity by mechanical means including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., and transporting to the embankment location within all lifts and leads upto 1000m complete for finished item of work for trench cutting as per MOR&H specification No.301 and as directed by the Engineer-in-Charge, excluding GST.

6650

136

907725



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.