Telangana State Industrial Infrastructure Corporation Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Industrial Infrastructure Corporation Limited - TSIIC Tender

Works
Civil And Construction
Road Construction
Opening Date6 Oct 2023
Closing Date13 Oct 2023
Tender Amount₹ 4,70,20,640 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road work sultanpur;Providing and laying dense graded bituminous macadam of 50mm thick with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.50 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH 5th specification clause No. 505 complete in all respects. (except GST & Seiniorage charges)

375

9045

3392118.75

... More
Road work sultanpur;Providing and applying Tack coat with Bitumen Emulsion rapid setting-1 over the prepared surface before laying DBM @2.5kg/10Sqm including cleaning the road surface with mechanical broom and air compressor and applying uniformity with the aid of emulsion pressure sprayer including cost and conveyance of bitumen emulsion, labour charges, cleaning, all taxes hire charges and operational charges of all T & P necessary to complete the finished item of work as directed by the Engineer-in-Charge as per MORT&H(5th Revision) specification503. excluding GST

7480

14

105767.2

... More
Road work sultanpur;Providing and applying Primer coat with bitumen emulsion(Bulk-Slow Setting-1) over the prepared surface of granular base as Wet Mix Macadam surface at the rate of 6kg /10sqm including cleaning the road surface with mechanical broom and air compressor and spraying uniformly with the aid of bitumen pressure sprayer including cost and conveyance of bitumen emulsion and water,labour charges,cleaning,all taxes hire charges and operational charges of all T&P necessary to complete the finished item of work as directed by the Engineer-in-Charge as per MORT&H(5th Revision) specification 502.excluding GST ,

7480

59

446556

... More
Road work sultanpur;Providing, laying, spreading and compacting graded stone aggregates to Wet Mix Macadam specification including cost & conveyance of all material, hire and operational charges of T&P, labour charges for all operations, premixing the material with water at OMC in mechanical mix plant, carriage of material by tipper to site, laying in uniform layers with paver finisher in subbase/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density, including lighting, grading, barricading and maintenance of diversion of trafic, etc., complete for finished item of work, as per table 400.13 of technical specification clause 406 MORTH(5th Revision). excluding GST & Seignoriage Charges

1970

2051

4040765.5

... More
Road work sultanpur;Construction of Granular sub-base by providing HBG/HBT material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage charges) and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401(5th revision) and as directed by the Engineer-in-charge. (Payment Based on Levels)

1580

1730

2734747.07

... More
Road work sultanpur;Formation of embankment with good gravel obtained from outside and spreading in layers not more than 200mm thick each or as directed by the Engineer-in-Charge including pre-watering soil, removal of top soil, excavation of soils, depositing the soils on the embankment, spreading soils, breaking clods, sectioning and consolidation with vibratory roller of 8 to 10 Tonnes capacity @ OMC compaction to meet requirement of table 300.1 and 300-2 of MORT&H including labour charges for all operations, hire and operational charges of T&P and , all water leads duly maintaining the required camber in the formation etc., complete for finished item of work as per MORTH Specification clause 305 (5th Revision) excluding GST & Seignoriage Charges.

9500

527

5015050

... More
Road work sultanpur;Formation of embankment / subbase with useful excavated soils obtained from Road, drains and Culverts by mechanical means and spreading in layers not more than 200mm thick each or as directed by the Engineer-in-Charge including pre-watering soil, removal of top soil, excavation of soils, depositing the soils on the embankment, spreading soils, breaking clods, sectioning and consolidation with vibratory roller of 8 to 10 Tonnes capacity @ OMC compaction to meet requirement of table 300.1 and 300-2 of MORT&H including labour charges for all operations, hire and operational charges of T&P, all water leads duly maintaining the required camber in the formation etc., complete for finished item of work as per MORTH Specification clause 305 (5th Revision) (Payment will be made based on level for finished item of work). Excluding GST

7700

142

1098020

... More
Road work sultanpur;Construction of rock fill embankment with broken hard rock fragments of size not exceeding 300mm laid in layers not exceeding 500mm thick including filling of surface voids with stone spalls, blinding top layers with granular material rolled with vibratory roller,all complete MORTH Specification clause 313 (5th Revision) including maintaining the required camber in the formation,labour charges for all operations and hire charges of equipment all water leads,cost of water, etc.,complete but excluding the cost of rock fragments and granular material(payment will be made on level basis).Excluding GST .

19150

89

1704350

... More
Road work sultanpur;Earth Work Excavation for Road way in hard rock(Blasting prohibited) by mechanical means including breaking rock and depositing on bank for all lifts and with an initial lead up to 1 Km including all operational,labour charges such as shoring,sheeting,planking, strutting etc.,for finished item of work excluding dewatering charges etc., as per technical specification clause 301MORTH (5th Revision) excluding GST

12750

1056

13470208.6

... More
Road work sultanpur;Excavation for roadway in hard rock (Control blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1km including all operational,labour charges such as shoring,sheeting,planking, strutting etc.,for finished item of work excluding dewatering charges etc., as per technical specification clause 301MORTH (5th Revision) excluding GST

25500

364

9301125

... More
Road work sultanpur;Excavation in soil with Dozer including cutting in roadway and pushing of the earth to site of embankment upto a distance of 100 M, staking on road side as instructed by Engineer-in-Charge, including trimming bottom and side slopes in accordance with requirement of lines, grades and crosssections, including all hire and operational charges of T&P, all labour charges, complete for finished item of work, as per MORTH 5th Spec No.301excluding GST

12750

130

1657500



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.