Telangana State Industrial Infrastructure Corporation Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Industrial Infrastructure Corporation Limited - TSIIC Tender

Opening Date29 Aug 2021
Closing Date1 Sep 2021
Tender Amount₹ 13,48,109 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
civil work;Earth work in excavation for culverts & drains by using Hydraulic excavator and depositing the earth on road side or as directed by the Engineer-in-Charge with an initial lead of 50mts in all soils upto SDR in all conditions including all operational, incidental and labour charges such as dry, wet, slushy, setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom, sheeting, planking, strutting, etc., complete for finished item of work excluding dewatering charges excluding GST & Seignoriage Chargesetc., complete as per MORTH (5th Revision) specification 304.

180

-

21904.2

... More
civil work;Conveyance of debries/dumps up to a distance of 5KM lead, for disposal including labour charges, lead and lifts of all material, hire and operational charges, T & P, etc., complete for finished item of work as directed by the Engineer-in-charge, excluding GST.

460

-

49569.6

... More
civil work;Providing gravel berms to the required thickness including spreading in layers of 150 mm thick with side slope of 2:1(2H:1V),sectioning each layer to proper camber, watering, consolidation of each layer with vibratory roller of 8 to10 tonnes capacity to achieve desired density at OMC including cost conveyance of gravel, water etc., to site, labour charges for all operations, hire and operational charges of vibratory roller and other T&P diversion of traffic, etc., complete for finished item of work, except GST& Seigniorage charges, as per MORT&H (5th Revision) Spc.No.401.

110

-

50935.5

... More
civil work;Supply and fixing of High Performance expansion joint filler board conforming to M.O.S.T " Silfex" Cpcell HD-100 of 25mm thick to a depth of 175mm for expansion joints including hipping clearing the expansion joint groove and pouring bitumen including heating, etc including cost and conveyance of all materials to site, all labour charges, as per direction of engineer in charge, complete for finished item of work, excluding GST

110

-

28985

... More
civil work;Construction of un-reinforced Plain Cement Concrete M30 grade over a prepared sub base, coarse aggregate (crushed stone well graded hard granite metal of 20mm size as per table 600-3) and fine aggregates (50% River sand, 50% Rock sand) conforming to IS:383, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design with minimum cement content of 350 Kg/Cum laid in alternate panels with approved fixed side formwork of steel channel, wedges, steel plates including levelling the formwork as per drawing, cleaning the surface with air compressor initially and finally, laying and fixing of 125 micron thick approved polythene film made of 100% virgin LDPE, laying and spreading the concrete with sholves, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation to lines and grade, curing of concrete slabs for 14 days including cost, and conveyance of all material to site, all labour charges for all operations, hire and operational charges of all T&P, diversion of traffic, etc., complete for finished item of work as per drawing and technical specification, excluding GST and segniorage charges.

100

-

623571

... More
civil work;Plain Cement Concrete(1:4:8) mix using 40mm size hard broken granite metal including cost and conveyance of all materials to site, seigniorage, machine mixing charges, labour charges, placing in position, levelling, vibrating, curing, etc. complete for finished item of work as directed by the Engineer-in-charge, excluding GST and Seigniorage charges as per technical specification clause No.2100 of Morth.

60

-

276055.8

... More
civil work;Providing, laying, spreading and compacting graded stone aggregates to Wet Mix Macadam specification including cost & conveyance of all material, hire and operational charges of T&P, labour charges for all operations, premixing the material with water at OMC in mechanical mix plant, carriage of material by tipper to site, laying in uniform layers with paver finisher in subbase/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density, including lighting, grading, barricading and maintenance of diversion of trafic, etc., complete for finished item of work, as per table 400.13 of technical specification clause 406 MORTH(5th Revision). excluding GST & Seignoriage Charges

60

-

115590

... More
civil work;Filling with good gravel brought from outside in Central Verge and filling in not more than 200mm thick in each layer with approved material spreaded, graded and compacted with plate compactor to achieve the desired density, including cost and conveyance of all material, seigniorage charges, labour charges for all operations, all other taxes except GST, hire and operational charges all T&P, diversion of traffic ect complete for finished item of work as per clause 407 MORTH.

100

-

60911

... More
civil work;Earth Work Excavation by mechanical means for road work with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with all lifts and lead upto 1000 m as directed by the Engineer-in-Charge including setting out, removal of stumps and all other deleterious matter, all operational & incidental charges, hire & operational charges of all T&P, all other taxes except GST etc., complete in all soils up to SDR as per Technical Specification Clause 301 MORTH .

260

-

30630.6



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.