Telangana State Forest Development Corporation Limited Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 1,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
336175Bid Award Id
ViewTender No
TSFDC/Deve.of Virtual safari/ Night safari/2021-22Tender Authority
Telangana State Forest Development Corporation Limited ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Pathways for 3 km, laying of RCC Hume pipes (04 No.s) and Safari vehicle parking shelters (03 No.s);Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate ( sand (50% natural and 50% rock sand)) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR FOOTINGS, PEDESTALS, PLINTH BEAMS AND STEPS.
3.66
-
43223.54
... More
Pathways for 3 km, laying of RCC Hume pipes (04 No.s) and Safari vehicle parking shelters (03 No.s);Manufacturing supplying and fixing of MS tubes ,Angles, and square rods as per approved design and drawings including fixing in position, cost conveyance of all materials and labour charges for finished item of work
1343.64
-
149238.09
... More
Pathways for 3 km, laying of RCC Hume pipes (04 No.s) and Safari vehicle parking shelters (03 No.s);Painting to new Iron work with 2-coats of Synthatic enamail paint approved brand over a base coat Zinc Chromate Red Oxide Primer of approved brand, making 3- coats in all to give an even shade after thoroughly brushing the surfaces including c/c of all materials and all labour charges etc complete for finished item of work
150
-
33432
... More
Pathways for 3 km, laying of RCC Hume pipes (04 No.s) and Safari vehicle parking shelters (03 No.s);Manufacturing, Supplying and Fixing of Parking shelter by using PVC Coated plyster cloth, MS tubes, angles, and Square rods as per approved desig, drawings including fixing in position , cost conveyance of all materials and labour charges for finisheditem of work
136.68
-
104975.71
... More
Pathways for 3 km, laying of RCC Hume pipes (04 No.s) and Safari vehicle parking shelters (03 No.s);Construction of Embankment with approved material gravel obtained from borrow pits useful earth from outside boundary by mechanical means with all leads and lifts including transporting of soil to site, spreading, grading to required slope and consoldation with 8 to 10 tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MORT&H spefiction 305 (sl.no. 3.16) (5th revision).
2250
-
2070877.5
... More
Pathways for 3 km, laying of RCC Hume pipes (04 No.s) and Safari vehicle parking shelters (03 No.s);Construction of RCC Hume Pipe Culvert of 1 row of 1000mm Dia. NP3 Class
4
-
210008
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements