Sri Konda Laxman Telangana State Horticultural University Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Sri Konda Laxman Telangana State Horticultural University - SKLTSHU Tender

Works
Civil And Construction
Building Construction
Opening Date4 Apr 2025
Closing Date21 Apr 2025
Tender Amount₹ 3,45,19,440 
Notes
Download

AI Insights

Bid Capacity
... View More
The formula for bid capacity is: Available Bid Capacity = 2AN - B.
Technical Capacity
... View More
The bidder should have executed civil works during the last five financial years from 2020-21 to 2024-25 as a Prime Contractor. They should have satisfactorily completed similar works of value not less than Rs. 4,00,00,000 in any one financial year. The cost of completed works of previous years shall be given weightage of 10% per year to bring them to the current price level. Additionally, the bidder should have completed similar works in their own name during the last five financial years. The bidder is also required to submit a certificate showing work-wise/year-wise value of work done. For works costing more than Rs. 2.00 Crores, the Contractor shall submit a quality plan. However, specific information on the percentage of similar works completed is not mentioned, but a minimum physical quantity of work is required, although the specific quantity is not mentioned.

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Girls Hostel;Roof Beams - First Floor -Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER withnatural river sand , 20mm size graded machine crushed hard granite metal(coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , Steel scaffolding pipes, jack Props, Steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

21.5

13084

281347

... More
Construction of Girls Hostel;Watersupply & Sanitary Arrangements: Supplying, laying, filling, jointing and testing SWG SP-1 pipe conforming to ISI 651 & 4127 with air tight Cement joints in CM (1.5:1) prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) and refilling with watering and tamping to the required slope including cost and conveyance of all materials to site and all labour charges , overheads & contractor profit etc., complete for finished item of work (APSS NO 1301 & 1318)-152.40mm dia upto 1524.0mm (5') depth

300

1001

300300

... More
Construction of Girls Hostel;Earth work excavation for foundations (Mechanical Means) for buildings in ordinary soils and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

1566.69

123

193798

... More
Construction of Girls Hostel;First Floor: Risers: Providing 16 to 18mm thick high polished granite stone slabs other than black and regular colours (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick usingnatural river sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and all other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item of work for treads and risers (S.S.701 & special)

7.2

4958

35698

... More
Construction of Girls Hostel;54.00mm OD pipe: S&F premium of Ajay/ Ashirvad make CPVC Pipes - SDR 11 including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charge

180

1683

302940

... More
Construction of Girls Hostel;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing , overheads & contractors profit etc., complete for finished item of work as per Standard specification.

18

9959

179262

... More
Construction of Girls Hostel;bed blocks and hold fasts- Third Floor/Terrace Floor: Plain Cement Concrete (1:3:6) nominal mix usingnatural river sand and 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, including sales & other taxes on all materials and including all charges for mixing, laying concrete in position, curing etc., & lift charges , and overheads & contractors profit for Bed Blocks & Hold Fasts for finished item of work. (APSS No. 402)

1

5632

5632

... More
Construction of Girls Hostel;Roof Beams - Ground Floor -Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER withnatural river sand , 20mm size graded machine crushed hard granite metal(coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , Steel scaffolding pipes, jack Props, Steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

23

12578

289294

... More
Construction of Girls Hostel;Supply & Fixing of Electronic step type Fan Regulator.Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL including 2 way module box and Cover frame including all accessories and labour charges etc complete

110

505

55550

... More
Construction of Girls Hostel;25mm Nominal bore:-Supplying and fixing Gunmetal Gate (GM) Bronze Gate/ Globe valves as per IS-778 Class - I , Indian make heavy type including cost and conveyance of all materials, labour charges, overheads & contractors profit complete for finished item of work.

24

1538

36912

... More
Construction of Girls Hostel;RCM facia 50mm thick using screened sand for drop walls, fins with rabbit wire mesh & nomianl reinforcement as directred by Engineer - In - Charge with dubara sponge finishing,including cost and conveyance of all materials to site, sales & othertaxes on all materials,operationals &incidental,cost and conveyance of cement,wire mesh,water to work site,centering,scaffolding and form work,lift charges etc., and overheads & contractors profit complete for finished item of work but excluding cost of steel and its fabrication charges for finished item of work(APSS NO.403&903)

6

1716

10296

... More
Construction of Girls Hostel;Columns - First Floor-Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER withnatural river sand , 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials, centering using Steel scaffolding pipes, jack Props, Steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

31.05

14084

437308

... More
Construction of Girls Hostel;Supplying and fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 of size 550mm x 400mm with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make heavy duty complete with standard CI brackets including wooden blocks ,1 No.15mm PVC connection with brass union nuts CP coated , 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931, 30 mm nominal size dia PVC flexible waste pipe of 914.4 mm length of Ist quality including cost and conveyance of all materials to site, labour charges , overheads & contractors profit for finished item of work

24

3088

74112

... More
Construction of Girls Hostel;Third Floor/Terrace Floor: Reinforced Cement Concrete M 20 design mix using natural river sand and12mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete using WEIGH BATCHER / MIXER including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, laying concrete, lift charges, curing etc., and overheads & contractors profit complete for finished item of work (APSS No. 402 & 403) for sill slabs.

0.4

7305

2922

... More
Construction of Girls Hostel;Roof Slab 125mm thick - Second Floor -Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER withnatural river sand , 20mm size graded machine crushed hard granite metal(coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , Steel scaffolding pipes, jack Props, Steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

109

1597

174073

... More
Construction of Girls Hostel;75mmdia:- Supplying and fixing of SWR PVC pipes (Prince/Sudhakar/Kisan/Supreme or any ISI brand) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326)

270

243

65610

... More
Construction of Girls Hostel;Supplying and fixing of 101.60mm x 609.60mm white glazed porcelain channels 1st quality fixed in brick masonry to the required slopes, white cement pointing including cost and conveyance of all materials and labour charges, overheads & contractors profit complete for finished item of work for all floors.

3

1012

3036

... More
Construction of Girls Hostel;Ground Floor : Flooring with 16 to 18mm thick High Polished granite stone slabs other than black and regular colours (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:8) , 20mm thick using natural river sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, polishing charges and all other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item of work (S.S.701 & special)

10

5108

51080

... More
Construction of Girls Hostel;Providing 110 mm Dia ISI marked PVC down water take pipes with socket , 2.5mm thick 4.0 kg/sq.cm pressure of ISI marked including cost of necessary PVC Bends, shoes, iron / PVC clamps and all other accessories and fixing in position including cost and conveyance of all materials, sales & other taxes on materials to site, operational & incidental charges including all labour charges for fixing at site etc., and overheads & contractors profit complete for finished item of work. (APSS No. 1328)

108

335

36180

... More
Construction of Girls Hostel;Ground Floor : Plastering 20mm thick in two coats for weather exposed exterior walls usingnatural river sand with base coat of 16mm thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904)

373

477

177921

... More
Construction of Girls Hostel;Ground Floor : Providing Mild steel (MS) steel bars (Fe 250 grade as per IS 432) of different diameters including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work.( APSS No.126)

0.7

80409

56286

... More
Construction of Girls Hostel;Ground Floor :Risers: Providing 16 to 18mm thick high polished granite stone slabs other than black and regular colours (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick usingnatural river sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and all other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item of work for treads and risers (S.S.701 & special)

8

4912

39296

... More
Construction of Girls Hostel;Roof Slab 125mm thick - Ground Floor -Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER withnatural river sand , 20mm size graded machine crushed hard granite metal(coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , Steel scaffolding pipes, jack Props, Steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

109

1503

163827

... More
Construction of Girls Hostel;First Floor:Reinforced Cement Concrete M 20 design mix using 12mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete using WEIGH BATCHER / MIXER including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, labour charges such as weigh batching, machine mixing, laying concrete, lift charges, curing etc., and overheads & contractors profit complete for finished item of work (APSS No. 402 & 403) for platforms and shelves.

122.31

534

65314

... More
Construction of Girls Hostel;Supply, Transportation and Fixing of 12" (300mm) light duty exhaust fan with wire guard etc complete of makes Crompton / Havells Ventilair-DB /Orient hill air Make exhaust / Fresh Air fan with metallic body and blades including making hole in wall and masonary work and all labour charges etc., complete

15

3127

46905

... More
Construction of Girls Hostel;First Floor: Providing Mild steel (MS) steel bars (Fe 250 grade as per IS 432) of different diameters including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work.( APSS No.126)

0.92

81832

75526

... More
Construction of Girls Hostel;Painting to new wood work and flush shutters with lappam finish , over a primary coat and painting two coats of synthetic enamel paint Grade-I VOC (Volatile Organic Compound) content less than 50 grams/litre of approved shade including cost and conveyance of all materials to site cost of primer coat and all labour charges etc. complete including applying sand paper on lappam coats for neat finish including sales & other taxes on cost of all materials etc., and overheads & contractors profit complete in all floors (APSS No.1200, 1207 & 1211).

474.35

215

101984

... More
Construction of Girls Hostel;22.20mm OD pipe: S&F premium of Ajay/ Ashirvad make CPVC Pipes - SDR 11 including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charge

342

356

121752

... More
Construction of Girls Hostel;Supplying and fixing 15 mm brass body CP finish self closing tap push type conforming to IS 1711 as approved by the Engineer-In-Charge including cost and conveyance of all materials, labour charges, overheads & contractors profit complete for finished item of work in all floors.

54

343

18522

... More
Construction of Girls Hostel;Supply & application of one coat water based cement primer of interior grade I and two coats of acrylic emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for internal walls including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors.

6063.13

183

1109553

... More
Construction of Girls Hostel;Columns - Ground Floor-Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER withnatural river sand , 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials, centering using Steel scaffolding pipes, jack Props, Steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

48

13587

652176

... More
Construction of Girls Hostel;Supplying and fixing Chromium plated finish brass body quarter turn Bibcock cum Health Faucet with 1m long tube and wall hook with 7 - 10 years warranty with necessary fittings etc., complete including cost and conveyance of all materials, labour charges, overheads & contractor profit complete for finished item of work in all floors.

24

4008

96192

... More
Construction of Girls Hostel;Providing impervious coat to exposed RCC roof slab surfaces of sump , sump side wall,sump bottom slab,in side of septic tank , in sunken slabs etc. to required slopes with CM (1:3) prop. using screened sand 12mm thick mixed with integral cement water proofing liquid confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 200ml per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm where ever necessary including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

52

204

10608

... More
Construction of Girls Hostel;Construction of Brick masonry support for GI pipe of size 304.80mm x 228.60mm x 228.60 mm with Brick in CM (1:6) prop including plastering and finishing with 12mm thick in CM (1:5) including cost and conveyance of all materials and all labour charges, overheads & contractors profit complete for finished item of work for all floors.

75

107

8025

... More
Construction of Girls Hostel;bed blocks and hold fasts- First Floor: Plain Cement Concrete (1:3:6) nominal mix usingnatural river sand and 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, including sales & other taxes on all materials and including all charges for mixing, laying concrete in position, curing etc., & lift charges , and overheads & contractors profit for Bed Blocks & Hold Fasts for finished item of work. (APSS No. 402)

3.18

5780

18406

... More
Construction of Girls Hostel;For basement : Plastering 12mm thick single coat in CM(1:5) usingnatural river sand including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904)

74

147

10878

... More
Construction of Girls Hostel;Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber upto 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing , overheads & contractors profit etc., complete for finished item of work as per Standard specification.

24

4855

116520

... More
Construction of Girls Hostel;Supply and fixing of (8+12) 4 way TPN DB Harizontal with IP-43 Protection makes Legrand/Schneider suitable for with 1No 100A FP isolator and 12Nos 6-32A 10KA SP MCB,C/D Curve ISI Mark of make Legrand/Schneider , including internal connections and labour charges for Flush Mounting etc., complete.

6

14280

85680

... More
Construction of Girls Hostel;First Floor: Treads: Providing 16 to 18mm thick high polished granite stone slabs other than black and regular colours (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick usingnatural river sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and all other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item of work for treads and risers (S.S.701 & special)

13.2

6815

89958

... More
Construction of Girls Hostel;Second Floor: Flooring with non-skid full body ceramic floor tiles of size 300mm x 300mm and thickness between 7 - 8mm 1st quality conforming to IS: 13711, IS: 13712, IS: 13630(Part 1 to 15) of any colour and finish in all shades and designs as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick usingnatural river sand over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, screened sand , water and tiles etc., and overheads & contractors profit complete for finished item of work.( In toilets) (APSS No.701 & 707)

100.02

968

96820

... More
Construction of Girls Hostel;Second Floor: Providing dadooing to walls with glazed full body ceramic tiles of any size and thickness between 5 to 7mm 1st quality conforming to IS: 13711, IS: 13712, IS: 13630(Parts 1 to 15) of any colour and finish in all shades and designs with borders as approved by Engineer-in-Charge set over base coat of CM(1:5) 12 mm thick usingnatural river sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work.

166.5

815

135698

... More
Construction of Girls Hostel;Second Floor: Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs as per the approved flooring pattern as directed by the Engineer-In -Charge, laying tiles using spacers of 2mm thick, set over a base coat of CM (1:8) prop. 12mm thick using natural river sand over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) including cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc.,and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707)

485.97

1138

553034

... More
Construction of Girls Hostel;First Floor - Reinforced Brick Masonry for partition walls (11.0 cm thick) in CM (1:4) prop. (Cement : Screened sand) using natural river sand(Screened sand) and common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sq.cm and placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, steel, sand, bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental charges such as labour charges for mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., and overheads & contractors profit but excluding cost of steel and its fabrication charges complete for finished item of work. (APSS No. of 501 & 509)

332.68

1156

384580

... More
Construction of Girls Hostel;Ground Floor : Providing skirting to internal walls to 10 cm height with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, length equal to flooring tiles, set over base coat of CM(1:5) 12 mm thick usingnatural river sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc.,and overheads & contractors profit complete for finished item of work.(APSS No.701 &707)

344

70

24080

... More
Construction of Girls Hostel;Roof Slab 175mm thick - Second Floor -Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER withnatural river sand , 20mm size graded machine crushed hard granite metal(coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , Steel scaffolding pipes, jack Props, Steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

24.73

1996

49368

... More
Construction of Girls Hostel;Wiring with run of 2 of 22/0.3mm (1.50 Sq.mm) FRLS/HFFR PVC insulated 1100V grade as per IS:694/1990 specification for copper cable of makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) /L&T / V-Guard (HFFR) make in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 6A/10A ISI Mark 1way Modular switch with cover frame of ISI Mark Legrand Myrius / Million Tap-Wood/ Anchor Roma viola / Havells Fabio / C&S Prime / CPL Vysma / Benlo Vesta / Polycab Levana makes with required cover frame to be fixed with Modular box in existing surface / consealed pipe wiring including cost and conveyance of all material and all labour charges etc., complete including cost and conveyance of all materials and all labour charges etc., complete for light and bell points in R.B

345

895

308775

... More
Construction of Girls Hostel;First Floor: Plastering 20mm thick in two coats for weather exposed exterior walls usingnatural river sand with base coat of 16mm thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904)

379.86

522

198288

... More
Construction of Girls Hostel;Supply and Run of 5 of 140/0.3mm (10.00 Sq.mm) FRLS PVC insulated 1100V grade as per IS:694/1990 specification for copper cable of makes Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) /L&T / V-Guard (HFFR). make in existing pipe for run of mains inlcuding all labour charges etc., completed

200

862

172400

... More
Construction of Girls Hostel;Electrification: Supply and fixing of 25mm outer dia Heavy(2.20mm thickness) grade with IS:9537 part 3 regid PVC pipe makes Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion. along with reinforcement is concealed in Roof Slabs with all required accessories including chiseling the wall whenever necessary including masonry work including all labour charges etc., complete and as directed by the department for fan point, light point and plug point including all labour charges.(for Slabs)

750

121

90750

... More
Construction of Girls Hostel;Second Floor :Plastering 20mm thick in two coats usingnatural river sand with base coat of 16mm thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904)

619.32

568

351772

... More
Construction of Girls Hostel;Supplying and fixing of 4" (101.6mm) multi floor trap with jali - UPVC/SWR pipe fittings as per site requirements with standard practice for all floors including cost and conveyance of all materials to site, labour charges , overheads & contractors profit etc., complete for finished item of work.

54

194

10476

... More
Construction of Girls Hostel;Spreading of stone dust in Road work with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work

108

949

102524

... More
Construction of Girls Hostel;First Floor: Flooring with 16 to 18 mm thick High Polished Granite stone slabs black colour as approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:8) , 20mm thick usingnatural river sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edge , polishing charges and all other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item of work for platforms (S.S.701 & special)

3.24

5455

17674

... More
Construction of Girls Hostel;Supply and fixing of ISI mark 16A 3pin / 6A 3 Pin Modular combi socket with 16 Amps Modular switch fixed on suitable size Modular box with required cover frame Makes : GM Four-Five /Legrand Myrius / Cabtree Verona/ Million Logus / Salzer including with connections, cost and conveyance of all material and all labour charges etc., complete in N.R.B. / R.B. (SD 2.1.6) (16 A Socket+ 16 A swith)

50

818

40900

... More
Construction of Girls Hostel;Ground Floor : Ornamental ceiling plastering 12mm thick two coats in CM (1:5) & CM (1:3) using natural river sand including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)

577

475

274075

... More
Construction of Girls Hostel;First Floor: Providing dadooing to walls with glazed full body ceramic tiles of any size and thickness between 5 to 7mm 1st quality conforming to IS: 13711, IS: 13712, IS: 13630(Parts 1 to 15) of any colour and finish in all shades and designs with borders as approved by Engineer-in-Charge set over base coat of CM(1:5) 12 mm thick usingnatural river sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work.

166.5

804

133866

... More
Construction of Girls Hostel;Ground Floor : Flooring with chequered cement concrete heavy duty tiles confirming to IS:13801 using aggregates, cement, pigments of size 300mm x 300mm and thickness 25mm of any shade as approved by Engineer - In - Charge set over base coat of cement mortar (1:6), 12 mm thick usingnatural river sand over CC bed alredy laid or RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm and jointed with neat white cement to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water and tiles etc.,and overheads & contractors profit complete for finished item of work.

22

851

18722

... More
Construction of Girls Hostel;Supply and fixing of 2nos 6A switch and 6A, 3/2 pin socket Modular type with 2nos 6A switch control and MS boxes with cover plate and GI switch box fixing on separate board including all labour charges etc., complete.Makes of wires : Polycab / HPL / RPG / Million / Gold Medal(SD 2.1.3)Makes of switches:- GM Four-Five /Legrand Myrius / Cabtree Verona/ Million Logus / Salzer.(Separate Socket (26A Switch +2 6Ascoket)

110

1370

150700

... More
Construction of Girls Hostel;First Floor - Brick masonry for panel walls in superstructure with CM (1:8) prop: (Cement : Screened sand) using natural river sand(Screened sand) common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, screened sand, bricks, water etc., to site, including sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 501 & 504).

108.63

8730

948371

... More
Construction of Girls Hostel;Providing and Placing on Terrace (at all floor levels) polyetheylene water storage tank with double layer approved brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and over flow pipes but without fittings and base support for tanks including cost and conveyance of all materials and labour charges, overheads & contractors profit complete for finished item of work.

12000

11

136338

... More
Construction of Girls Hostel;Roof Slab 175mm thick - Ground Floor -Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER withnatural river sand , 20mm size graded machine crushed hard granite metal(coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , Steel scaffolding pipes, jack Props, Steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

25

1853

46325

... More
Construction of Girls Hostel;Ground Floor : Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs as per the approved flooring pattern as directed by the Engineer-In -Charge, laying tiles using spacers of 2mm thick, set over a base coat of CM (1:8) prop. 12mm thick using natural river sand over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) including cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc.,and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707)

456

1050

478800

... More
Construction of Girls Hostel;Second Floor: Reinforced Cement Concrete M 20 design mix using 12mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete using WEIGH BATCHER / MIXER including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, labour charges such as weigh batching, machine mixing, laying concrete, lift charges, curing etc., and overheads & contractors profit complete for finished item of work (APSS No. 402 & 403) for platforms and shelves.

122.31

555

67882

... More
Construction of Girls Hostel;Third Floor/Terrace Floor: Providing Thermo Mechanically Treated (TMT) (from Primary Producers like TATA, SAIL, VSP, Jindal and Shyam Steel as approved by Ministry of Steel) (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work.( APSS No.126)

3.8

77520

294576

... More
Construction of Girls Hostel;Footings-Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER withnatural river sand , 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

172

10386

1786392

... More
Construction of Girls Hostel;Pedestals-Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER withnatural river sand , 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

25

11012

275300

... More
Construction of Girls Hostel;Supply and Run of No.8 SWG G.I wire including cost of all accessories and labour charges etc., complete. (0.104Kgs/1Mtr) (SD 5.2.1)

29.88

27

807

... More
Construction of Girls Hostel;Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/ liter for exterior walls including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors.

1665.89

264

439794

... More
Construction of Girls Hostel;Supply and Run of 2 of 56/0.3mm (4.00 Sq.mm) with Run 1 of 36/0.3mm(2.50Sqmm) FRLS PVC insulated 1100V grade as per IS:694/1990 specification for copper cable of makes Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) /L&T / V-Guard (HFFR). make in existing pipe for run of mains inlcuding all labour charges etc., completed

100

216

21600

... More
Construction of Girls Hostel;Columns - Second Floor-Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER withnatural river sand , 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials, centering using Steel scaffolding pipes, jack Props, Steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

28.57

14821

423377

... More
Construction of Girls Hostel;Filling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work (APSS NO.309&310)

452

350

158200

... More
Construction of Girls Hostel;Roof Beams - Terrace Floor -Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER withnatural river sand , 20mm size graded machine crushed hard granite metal(coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , Steel scaffolding pipes, jack Props, Steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

3

12578

37734

... More
Construction of Girls Hostel;Supplying and fixing 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931 as approved by the Engineer-In-Charge including cost and conveyance of all materials, labour charges , overheads & contractors profit complete for finished item of work in all floors.

24

312

7488

... More
Construction of Girls Hostel;Second Floor: Treads: Providing 16 to 18mm thick high polished granite stone slabs other than black and regular colours (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick usingnatural river sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and all other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item of work for treads and risers (S.S.701 & special)

13.2

6897

91040

... More
Construction of Girls Hostel;Providing independent earthing by exacavating a pit to a depth of 2.25Mtr in all soils as per size specified in the data for Sophisticated Electronic equipment with 600mm x 600mm x 3.15mm thick copper plate rigidly fixed to 40mm dia 'B' Class G.I Pipe of 2.5Mtr length as per National Electric Code and earth connection from electrode GI strip of 25mm x 5mm x 200mm length to be bolted with nut bolts to G.I.pipe including 25mm x 3mm copper strip of 6Mtrs length connected from plate to GI strip including filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder and providing brick masanary chamber of 450m x 450m x 400m with RCC slab cover including all accessories and labour charges etc complete as per IS specification 732/1982 (Part II). (SD 5.1.3) NOTE: In location where the full length of electrode is not possible due to meeting a water table /rock. The electrode may be reduced length and two earths may be done to meet earth resistance.

2

16670

33340

... More
Construction of Girls Hostel;Second Floor: Providing Mild steel (MS) steel bars (Fe 250 grade as per IS 432) of different diameters including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work.( APSS No.126)

0.92

83255

76840

... More
Construction of Girls Hostel;Ground Floor : Providing dadooing to walls with glazed full body ceramic tiles of any size and thickness between 5 to 7mm 1st quality conforming to IS: 13711, IS: 13712, IS: 13630(Parts 1 to 15) of any colour and finish in all shades and designs with borders as approved by Engineer-in-Charge set over base coat of CM(1:5) 12 mm thick usingnatural river sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work.

167

793

132431

... More
Construction of Girls Hostel;Supplying and fixing CP finish brass soap dish of approved make ISI quality with CP screws etc., complete including cost and conveyance of all materials, labour charges for fixing , overheads & contractors profit for finished item of work in all floors

24

716

17184

... More
Construction of Girls Hostel;Ground Floor : Plastering 20mm thick in two coats usingnatural river sand with base coat of 16mm thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904)

610

477

290970

... More
Construction of Girls Hostel;Ground Floor: Reinforced Cement Concrete M 20 design mix using natural river sand and12mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete using WEIGH BATCHER / MIXER including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, laying concrete, lift charges, curing etc., and overheads & contractors profit complete for finished item of work (APSS No. 402 & 403) for sill slabs.

0.5

7305

3653

... More
Construction of Girls Hostel;Supply and erecting PVC / GI / MS Galvanished fan hook box with hook in RCC slab including all Labour charges etc., complete.

110

202

22220

... More
Construction of Girls Hostel;Third Floor/Terrace Floor: Ornamental ceiling plastering 12mm thick two coats in CM (1:5) & CM (1:3) using natural river sand including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)

33

475

15675

... More
Construction of Girls Hostel;Roof Slab 175mm thick - First Floor -Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER withnatural river sand , 20mm size graded machine crushed hard granite metal(coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , Steel scaffolding pipes, jack Props, Steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

24.73

1925

47612

... More
Construction of Girls Hostel;Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65 mm and ISI marked flush door shutters of 35 mm thick double shutters with bond wood solid block board type Core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS powder coated fixtures of 6 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 2 Nos. tower bolts (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150 mm long handles (IS:208), 2 Nos. door stoppers and 2 Nos. rubber bushes including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc., including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) (1200mm x 2100mm)

133.56

4099

547462

... More
Construction of Girls Hostel;Second Floor: Flooring with 16 to 18mm thick High Polished granite stone slabs other than black and regular colours (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:8) , 20mm thick using natural river sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, polishing charges and all other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item of work (S.S.701 & special)

9.7

5270

51106

... More
Construction of Girls Hostel;Columns - Terrace Floor-Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER withnatural river sand , 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials, centering using Steel scaffolding pipes, jack Props, Steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

4

12153

48612

... More
Construction of Girls Hostel;Ground Floor : Treads: Providing 16 to 18mm thick high polished granite stone slabs other than black and regular colours (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick usingnatural river sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and all other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item of work for treads and risers (S.S.701 & special)

14

6734

94276

... More
Construction of Girls Hostel;Roof Beams - Second Floor -Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER withnatural river sand , 20mm size graded machine crushed hard granite metal(coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , Steel scaffolding pipes, jack Props, Steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

21.5

13589

292206

... More
Construction of Girls Hostel;Supplying and fixing approved make wash down European Water Closet of 1st quality conforming to IS:2556-Part-2-2004 of white glazed with 'S' trap,supplying and fixing best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996 and 10 litres capacity single flush PVC low level cistern with internal components and fixed using required size of nails and screws, 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931, 15mm PVC connections with brass union nuts CP coated including cost and conveyance of all materials to site, overheads & contractors profit etc., complete for finished item of work for all floors.

24

6415

153960

... More
Construction of Girls Hostel;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter ? (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (94 mm x 45 mm)/(80 mm x 52 mm) x 2.20 mm for outer frames, (58 mm x 39 mm)/(54 mm x 38 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 4 mm thick pinheaded glass of reputed make and mesh shutter frame shall be (42 mm x 25 mm)/(52 mm x 21.5 mm) x 2.0 mm fitted with Vinyl Coated Fiber mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site, overheads and contractors profit etc., complete for finished item of work

107.74

8088

871361

... More
Construction of Girls Hostel;First Floor: Flooring with 16 to 18mm thick High Polished granite stone slabs other than black and regular colours (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:8) , 20mm thick using natural river sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, polishing charges and all other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item of work (S.S.701 & special)

9.7

5189

50321

... More
Construction of Girls Hostel;34.90mm OD pipe: S&F premium of Ajay/ Ashirvad make CPVC Pipes - SDR 11 including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charge

240

714

171360

... More
Construction of Girls Hostel;Roof Slab 150mm thick - terrace Floor -Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER withnatural river sand , 20mm size graded machine crushed hard granite metal(coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , Steel scaffolding pipes, jack Props, Steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

49

1669

81781

... More
Construction of Girls Hostel;Second Floor - Reinforced Brick Masonry for partition walls (11.0 cm thick) in CM (1:4) prop. (Cement : Screened sand) using natural river sand(Screened sand) and common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sq.cm and placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, steel, sand, bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental charges such as labour charges for mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., and overheads & contractors profit but excluding cost of steel and its fabrication charges complete for finished item of work. (APSS No. of 501 & 509)

332.68

1235

410862

... More
Construction of Girls Hostel;Second Floor: Providing skirting to internal walls to 10 cm height with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, length equal to flooring tiles, set over base coat of CM(1:5) 12 mm thick usingnatural river sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc.,and overheads & contractors profit complete for finished item of work.(APSS No.701 &707)

381.54

72

27471

... More
Construction of Girls Hostel;Second Floor : Risers: Providing 16 to 18mm thick high polished granite stone slabs other than black and regular colours (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick usingnatural river sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and all other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item of work for treads and risers (S.S.701 & special)

7.2

5005

36036

... More
Construction of Girls Hostel;Filling with carted gravel in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work(APSS NO.309&310)

983

321

315543

... More
Construction of Girls Hostel;Second Floor - Brick masonry for panel walls in superstructure with CM (1:8) prop: (Cement : Screened sand) using natural river sand(Screened sand) common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, screened sand, bricks, water etc., to site, including sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 501 & 504).

108.63

9138

992694

... More
Construction of Girls Hostel;Third Floor/Terrace Floor: Plastering 12mm thick in two coats usingnatural river sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)

95

461

43795

... More
Construction of Girls Hostel;Sunshades - Ground Floor-Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with natural river sand , 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials , centering using Casurina Ballies , Bamboos , Wooden Reapers , Runners , Wood Posts , Wall Plates etc., for 60cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing, overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402, 403 & 903)

37

553

20461

... More
Construction of Girls Hostel;Supply and fixing of 4 Way VTPN DB accomodating 125A 4 Pole MCCB as incomer and 4 Nos(40-63)A TP MCBs as outgoing and with IP 43 Protection of makes Legrand / Schneider. , including internal connections and labour charges for Flush Mounting etc., complete(conseling)

3

46434

139302

... More
Construction of Girls Hostel;Lintels - Third Floor-Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER withnatural river sand , 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials, centering using Steel scaffolding pipes, jack Props, Steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

1

12633

12633

... More
Construction of Girls Hostel;Supply and fixing of ISI mark batten holder / slanting holder Makes : Anchor / Gold Medal Olive / Million Zoom in lieu of ceiling rose of light point complete with all connections and all labour charges with 9.0W LED Lamp Make:Phillips / OSRAM / GE / Crompton / VIN / Bajaj / Havells /HPL/Surya. (SD 2.1.7)

60

417

25020

... More
Construction of Girls Hostel;Second Floor: Flooring with 16 to 18 mm thick High Polished Granite stone slabs black colour as approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:8) , 20mm thick usingnatural river sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edge , polishing charges and all other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item of work for platforms (S.S.701 & special)

3.24

5536

17937

... More
Construction of Girls Hostel;Supply and fixing of ISI mark with 16 Amps Modular switch fixed on suitable size Modular box with required cover frame Makes : GM Four-Five /Legrand Myrius / Cabtree Verona/ Million Logus / Salzer including with connections, cost and conveyance of all material and all labour charges etc., complete in N.R.B. / R.B. (SD 2.1.6) (16 A swith)

30

536

16080

... More
Construction of Girls Hostel;Second Floor : Plastering 12mm thick in two coats usingnatural river sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)

928.97

552

512794

... More
Construction of Girls Hostel;Lintels - Second Floor-Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER withnatural river sand , 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials, centering using Steel scaffolding pipes, jack Props, Steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

3.05

13789

42077

... More
Construction of Girls Hostel;Supply and Run of 5 of 86/0.3mm (6.00 Sq.mm) FRLS PVC insulated 1100V grade as per IS:694/1990 specification for copper cable of makes Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) /L&T / V-Guard (HFFR). make in existing pipe for run of mains inlcuding all labour charges etc., completed

200

536

107200

... More
Construction of Girls Hostel;First Floor: Providing skirting to internal walls to 10 cm height with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, length equal to flooring tiles, set over base coat of CM(1:5) 12 mm thick usingnatural river sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc.,and overheads & contractors profit complete for finished item of work.(APSS No.701 &707)

381.54

71

27089

... More
Construction of Girls Hostel;Roof Slab 150mm thick - First Floor -Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER withnatural river sand , 20mm size graded machine crushed hard granite metal(coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , Steel scaffolding pipes, jack Props, Steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

508.3

1734

881390

... More
Construction of Girls Hostel;Supply and fixing of 10A 3/2 pin 2 module modular Socket with 10A 1 Way 1 module Modular Switch of Legrand Myrius / Million mway /Goldmedal Curve/ Anchor Roma viola /Havells Fabio / Panasonic Vision / Hager Insista / Benlo Vesta / C&S Primo / CPL Vysma / Polycab Levana make make with suitable cover frame and Modular box and earth connections including cost and conveyance of all material and all labour charges etc., complete in commom socket

108

693

74844

... More
Construction of Girls Hostel;First Floor: Providing Thermo Mechanically Treated (TMT) (from Primary Producers like TATA, SAIL, VSP, Jindal and Shyam Steel as approved by Ministry of Steel) (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work.( APSS No.126)

18

74674

1344132

... More
Construction of Girls Hostel;110mmdia:- Supplying and fixing of SWR PVC pipes (Prince/Sudhakar/Kisan/Supreme or any ISI brand) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326)

270

346

93420

... More
Construction of Girls Hostel;Supplying and fixing of SWG Gully traps 150mm x 100mm of ISI make confirming to IS 651 & 4127 with C.I grating & constructing cement brick masonry in CM (1:6) prop., intermediate chamber and fitted with 304.8 mm X 288.6 mm (12"x9") C.I Frame with hinged cover of standard make as approved including cost and conveyance of all materials to site, labour charges, overheads & contractors profit etc., complete for finished item of work.

24

806

19344

... More
Construction of Girls Hostel;Supply and fixing of 25 Sqmm 4 CoreXLPE insulated, 1100Vgrade armoured alluminium cable with ISI markas per specification confirming to IS:7098 (Part- I) Makes : Torrent / Unicab / Universal /Polycab / Havells / Gloster / KEI / Finolex /Payal / RR kable / Beljin / Ollvin / Finecab /RPG / V - Guard / Orbit / Fortune Arrt /Gemscab / Bonton / SPM / Unistar / Windsor/Avocab / Pawancab / Nakoda / Suncab including with required cable glands, Lugs complete with all required accessories as directed by the department including cost and conveyance Makes : Finolex / Havells / Polycab

100

1095

109500

... More
Construction of Girls Hostel;Supply, Transportation and Fixing of energy efficient decorative fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current(BLDC)motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle kit, safety rope, copper winding, Power Factor greater than 0.90,Service Value (CMM/W) greater than 8.5,Air delivery minimum 235 CMM, 350 RPM (tolerance as per IS:374-2019), THD less than 10%, remote or compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise = 75 degree C (max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., complete.Makes :Atomberg (Efficio + ) / Havells / Orient /RR / Halonix including all labour charges etc., complete.

110

3712

408320

... More
Construction of Girls Hostel;First Floor: Ornamental ceiling plastering 12mm thick two coats in CM (1:5) & CM (1:3) using natural river sand including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)

430.02

198

85143

... More
Construction of Girls Hostel;Second Floor: Reinforced Cement Concrete M 20 design mix using natural river sand and12mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete using WEIGH BATCHER / MIXER including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, laying concrete, lift charges, curing etc., and overheads & contractors profit complete for finished item of work (APSS No. 402 & 403) for sill slabs.

0.38

7932

3039

... More
Construction of Girls Hostel;Third Floor/Terrace Floor: Plastering 20mm thick in two coats for weather exposed exterior walls usingnatural river sand with base coat of 16mm thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904)

379

477

180783

... More
Construction of Girls Hostel;Ground Floor : Providing Thermo Mechanically Treated (TMT) (from Primary Producers like TATA, SAIL, VSP, Jindal and Shyam Steel as approved by Ministry of Steel) (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work.( APSS No.126)

25

73251

1831275

... More
Construction of Girls Hostel;bed blocks and hold fasts- ground Floor: Plain Cement Concrete (1:3:6) nominal mix usingnatural river sand and 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, including sales & other taxes on all materials and including all charges for mixing, laying concrete in position, curing etc., & lift charges , and overheads & contractors profit for Bed Blocks & Hold Fasts for finished item of work. (APSS No. 402)

3.3

5632

18586

... More
Construction of Girls Hostel;Supply and fixing of 25mm outer dia Heavy(1.50mm thickness) grade with IS:9537 part 3 regid PVC pipe makes Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold / Polycab / DEC / Beljin / Champion / along with reinforcement is concealed in wall with all required accessories including chiseling the wall whenever necessary including masonry work including all labour charges etc., complete and as directed by the department for fan point, light point and plug point including all labour charges.

250

106

26500

... More
Construction of Girls Hostel;Ground Floor : Flooring with non-skid full body ceramic floor tiles of size 300mm x 300mm and thickness between 7 - 8mm 1st quality conforming to IS: 13711, IS: 13712, IS: 13630(Part 1 to 15) of any colour and finish in all shades and designs as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick usingnatural river sand over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, screened sand , water and tiles etc., and overheads & contractors profit complete for finished item of work.( In toilets) (APSS No.701 & 707)

101

879

88779

... More
Construction of Girls Hostel;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed usingnatural river sand , coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 402)

81

4281

346761

... More
Construction of Girls Hostel;Ground Floor - Plain Cement Concrete M 20 design mix using WEIGH BATCHER / MIXER,natural river sand and 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, overheads & contrctors profit etc., complete for finished item of work (APSS No. 402 & 403) for steps

1

6998

6998

... More
Construction of Girls Hostel;Supply and fixing of 25mm outer dia medium(1.50mm thickness) grade with IS:9537 part 3 regid Surface PVC pipe makes Sudhakar / GM / Modi / AKG along with all accessories fixing on chromium plated metallic base saddles etc, complete and as directed by the department for fan point, light point and plug point including all labour charges(Surface Conduit)

50

99

4950

... More
Construction of Girls Hostel;Roof Slab 125mm thick - First Floor -Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER withnatural river sand , 20mm size graded machine crushed hard granite metal(coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , Steel scaffolding pipes, jack Props, Steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

109

1563

170367

... More
Construction of Girls Hostel;Roof Slab 125mm thick - Terrace Floor -Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER withnatural river sand , 20mm size graded machine crushed hard granite metal(coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , Steel scaffolding pipes, jack Props, Steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

32.4

1629

52780

... More
Construction of Girls Hostel;Second Floor - Plain Cement Concrete M 20 design mix using WEIGH BATCHER / MIXER,natural river sand and 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, overheads & contrctors profit etc., complete for finished item of work (APSS No. 402 & 403) for steps

0.99

7519

7444

... More
Construction of Girls Hostel;Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand, water, stones etc., from approved quarry, to site, sales & other taxes on all materials including labour for cutting stones to required size and shape, mixing, of cement, mortar, construction, curing etc.,and overheads & contractors profit complete for finished item of work in foundation and basement. (APSS No. 601 & 615)

22

3438

75636

... More
Construction of Girls Hostel;Roof Slab 150mm thick - Ground Floor -Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER withnatural river sand , 20mm size graded machine crushed hard granite metal(coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , Steel scaffolding pipes, jack Props, Steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

315

1669

525735

... More
Construction of Girls Hostel;First Floor: Plastering 20mm thick in two coats usingnatural river sand with base coat of 16mm thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904)

723.42

522

377627

... More
Construction of Girls Hostel;Second Floor: Providing Thermo Mechanically Treated (TMT) (from Primary Producers like TATA, SAIL, VSP, Jindal and Shyam Steel as approved by Ministry of Steel) (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work.( APSS No.126)

18

76097

1369746

... More
Construction of Girls Hostel;Lintels - Ground Floor-Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER withnatural river sand , 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials, centering using Steel scaffolding pipes, jack Props, Steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

3

12633

37899

... More
Construction of Girls Hostel;First Floor: Reinforced Cement Concrete M 20 design mix using natural river sand and12mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete using WEIGH BATCHER / MIXER including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, laying concrete, lift charges, curing etc., and overheads & contractors profit complete for finished item of work (APSS No. 402 & 403) for sill slabs.

0.41

7618

3091

... More
Construction of Girls Hostel;Supply and Run of 2 of 36/0.3mm (2.50 Sq.mm) with Run 1 of 22/0.3mm(1.50Sqmm) FRLS PVC insulated 1100V grade as per IS:694/1990 specification for copper cable of makes Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) /L&T / V-Guard (HFFR). make in existing pipe for run of mains inlcuding all labour charges etc., completed

900

140

126000

... More
Construction of Girls Hostel;bed blocks and hold fasts- Second Floor: Plain Cement Concrete (1:3:6) nominal mix usingnatural river sand and 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, including sales & other taxes on all materials and including all charges for mixing, laying concrete in position, curing etc., & lift charges , and overheads & contractors profit for Bed Blocks & Hold Fasts for finished item of work. (APSS No. 402)

3.18

5928

18877

... More
Construction of Girls Hostel;Supplying and fixing of 25 mm nominal size dia and 609.6mm long aluminium anodized towel rod with brackets and aluminium screws including cost and conveyance of all materials, labour charges, overheads & contractors profit for finished item of work.

24

207

4968

... More
Construction of Girls Hostel;First Floor: Plastering 12mm thick in two coats usingnatural river sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)

1085.14

507

550164

... More
Construction of Girls Hostel;Ground Floor - Brick masonry for panel walls in superstructure with CM (1:8) prop: (Cement : Screened sand) using natural river sand(Screened sand) common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, screened sand, bricks, water etc., to site, including sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 501 & 504).

108

8323

898884

... More
Construction of Girls Hostel;Plinth Beam-Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER withnatural river sand , 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

22.5

13359

300578

... More
Construction of Girls Hostel;Ground Floor : Flooring with 16 to 18 mm thick High Polished Granite stone slabs black colour as approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:8) , 20mm thick usingnatural river sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edge , polishing charges and all other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item of work for platforms (S.S.701 & special)

4

5374

21496

... More
Construction of Girls Hostel;Providing, supplying & fixing of Fixed Louvered Ventilator made out of multi chambered uPVC sections with Glazing bead shall be co-extruded with Grey colour soft PVC. having isolated drainage and reinforced with Galvanized Iron profiles throughout the window. The outer frame having an overall size of 60 mm x 55 mm x 2.40 with reinforcement of 1 mm thickness and Mullion with overall size of 74 mm x 60 mm x 2.40 mm with reinforcement of 1 mm thickness. (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin).Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware. Wall thickness of frame & Mullion shall be 2.4 mm.,including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site, overheads and contractor profit etc., complete for finished item of work

23.04

7279

167708

... More
Construction of Girls Hostel;Roof Slab 150mm thick - Second Floor -Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER withnatural river sand , 20mm size graded machine crushed hard granite metal(coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , Steel scaffolding pipes, jack Props, Steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

508.3

1800

914938

... More
Construction of Girls Hostel;Supply andlaying of P.V.C casing and caping of ISI mark of make Modi with double locking arrangements with groover trunking of size not below 12.5mm height 25mm size with all accessroies duly sealed at points and erecting on wall/ceiling including cost of all materials and labour charges etc.,complete including all labour charges etc., complete

50

75

3750

... More
Construction of Girls Hostel;First Floor : Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs as per the approved flooring pattern as directed by the Engineer-In -Charge, laying tiles using spacers of 2mm thick, set over a base coat of CM (1:8) prop. 12mm thick using natural river sand over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) including cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc.,and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707)

485.97

1094

531651

... More
Construction of Girls Hostel;Ground Floor - Reinforced Brick Masonry for partition walls (11.0 cm thick) in CM (1:4) prop. (Cement : Screened sand) using natural river sand(Screened sand) and common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sq.cm and placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, steel, sand, bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental charges such as labour charges for mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., and overheads & contractors profit but excluding cost of steel and its fabrication charges complete for finished item of work. (APSS No. of 501 & 509)

333

1077

358641

... More
Construction of Girls Hostel;Sunshades - Second Floor-Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with natural river sand , 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials , centering using Casurina Ballies , Bamboos , Wooden Reapers , Runners , Wood Posts , Wall Plates etc., for 60cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing, overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402, 403 & 903)

33.32

604

20125

... More
Construction of Girls Hostel;Sunshades - First Floor-Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with natural river sand , 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials , centering using Casurina Ballies , Bamboos , Wooden Reapers , Runners , Wood Posts , Wall Plates etc., for 60cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing, overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402, 403 & 903)

35.28

579

20427

... More
Construction of Girls Hostel;Supplying and fixing TV shape mirror with plastic frame of size 609.6mm x 457.2mm, plywood back with NP screws 1st quality including cost and conveyance of all materials, labour charges, overheads & contractors profit for finished item of work in all floors.

24

641

15384

... More
Construction of Girls Hostel;Ground Floor :Reinforced Cement Concrete M 20 design mix using 12mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete using WEIGH BATCHER / MIXER including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, labour charges such as weigh batching, machine mixing, laying concrete, lift charges, curing etc., and overheads & contractors profit complete for finished item of work (APSS No. 402 & 403) for platforms and shelves.

124

512

63488

... More
Construction of Girls Hostel;Supply,fixing and Transportation of 22W, +/ 10% , >/ 2300 lumens, 1200mm length LED light housing made with alluminium anodised body, wide operating voltage with PF=0.9, Surge protection: >2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI=80 etc., complete with 5 years warranty with BIS certification with BIS Certification.LUMINAIRE MAKE: Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj /Havells / Jaquar / IB LED / Panasonic /Halonix / HPL / Syska / Eveready / Surya /Keselec/ FIEM.LED MAKE : PHILIPS LUMILEDS / CREE /NICHIA / OSRAM / SAMSUNG / LG LEDs including all accessories and labour charges etc complete

200

1878

375600

... More
Construction of Girls Hostel;Second Floor : Plastering 20mm thick in two coats for weather exposed exterior walls usingnatural river sand with base coat of 16mm thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904)

379.86

568

215762

... More
Construction of Girls Hostel;Sunshades - Terrace Floor-Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with natural river sand , 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials , centering using Casurina Ballies , Bamboos , Wooden Reapers , Runners , Wood Posts , Wall Plates etc., for 60cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing, overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402, 403 & 903)

2

553

1106

... More
Construction of Girls Hostel;Supply and fixing of 3 Nos 6A ISI mark Modular type switch with 3 Nos 6A 3/2 pin wall plug socket on suitable size Modular box with required cover frame Makes : GM Four-Five /Legrand Myrius / Cabtree Verona/ Million Logus / Salzer including cost and coveyance of all material and all labour charges etc., complete for Computers in N.R.B. / R.B.(SD 2.1.4 ) 6A Switches - 3 Nos & 6A Sockets - 3 Nos

20

1943

38860

... More
Construction of Girls Hostel;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with integral cement water proofing liquid confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 200ml per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

643

492

316356

... More
Construction of Girls Hostel;Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65 mm and ISI marked flush door shutters of 35 mm thick double shutters with bond wood solid block board type Core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS powder coated fixtures of 6 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 2 Nos. tower bolts (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150 mm long handles (IS:208), 2 Nos. door stoppers and 2 Nos. rubber bushes including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc., including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) (1200mm x 2100mm)

87.15

3407

296920

... More
Construction of Girls Hostel;Supply and fixing of doors as per approved drawings with medium teak wood frame of section 100mm x 65 mm with fixed fan light of 500mm at the top fixed with 4mm thick pin headed glass using 12mm x 12mm Teak Wood beading and 2 Nos. of 10mm MS Square bars and ISI marked flush door shutter of 35mm thick double shutters with bond wood solid block board type core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS powder coated fixtures of 6 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 2 Nos. tower bolts - 10mm (IS:204) of 200 mm long at top, 2 Nos. 150mm long handles (IS:208), 2 Nos. door stoppers and 2 Nos. rubber bushes including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame, fixing glass in fan light portion etc., including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) (1800mm x 2600mm)

4.68

3642

17045

... More
Construction of Girls Hostel;First Floor - Plain Cement Concrete M 20 design mix using WEIGH BATCHER / MIXER,natural river sand and 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, overheads & contrctors profit etc., complete for finished item of work (APSS No. 402 & 403) for steps

0.99

7259

7186

... More
Construction of Girls Hostel;Supplying and fixing of stainless steel ( grade 304 ) hand railing as per approved drawing with top rail of 50mm dia pipe and 2mm thick medium class and vertical posts of 25mm dia and 1.6mm thick medium class 2 Nos for each step fixed with base plate of 75mm dia using bonding agent and anchor fastner and welding, drilling of 20mm dia holes with pneumatic compressor for fixing railing, buffing, polishing all members of the railing thouroughly , lacquer finishing to present seamless finish including cost and conveyance of all materials, electrodes, welding charges, cost of all consumables, labour charges , overheads & contractors profit etc., complete for finished item of work.

20.53

5992

123030

... More
Construction of Girls Hostel;Terrace Floor - Brick masonry for panel walls in superstructure with CM (1:8) prop: (Cement : Screened sand) using natural river sand(Screened sand) common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, screened sand, bricks, water etc., to site, including sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 501 & 504).

36

8323

299628

... More
Construction of Girls Hostel;Lintels - First Floor-Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER withnatural river sand , 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials, centering using Steel scaffolding pipes, jack Props, Steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

3.05

13212

40317

... More
Construction of Girls Hostel;28.60mm OD pipe: S&F premium of Ajay/ Ashirvad make CPVC Pipes - SDR 11 including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charge

162

466

75492

... More
Construction of Girls Hostel;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing , overheads & contractors profit etc., complete for finished item of work as per Standard specification.

12

14212

170544

... More
Construction of Girls Hostel;Painting two coats with synthetic enamel paint Grade-I VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxide to new iron work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).

106.19

183

19433

... More
Construction of Girls Hostel;First Floor: Flooring with non-skid full body ceramic floor tiles of size 300mm x 300mm and thickness between 7 - 8mm 1st quality conforming to IS: 13711, IS: 13712, IS: 13630(Part 1 to 15) of any colour and finish in all shades and designs as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick usingnatural river sand over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, screened sand , water and tiles etc., and overheads & contractors profit complete for finished item of work.( In toilets) (APSS No.701 & 707)

100.02

923

92319



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.