Roads And Buildings Department Tender
... More
The Roads And Buildings Department has issued a formal invitation for competitive bids for Laying Of New Drainage Pipe Line Place Of Damaged Lines, Certain Civil And Sanitary Works At Staff Quarters At Road No.13 Banjara Hills Hyderabad(under Turnkey) in K.V.Rangareddy, Telangana, with an estimated contract value of Rs. 38,62,134. The bid opening date for this tender is 28-05-2025 and the last date for bid submission is 16-06-2025. Interested bidders for Roads And Buildings Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Roads And Buildings Department Tender
Civil And Construction
Drainage Work
Opening Date28 May 2025
Closing Date16 Jun 2025
Tender Amount₹ 38,62,134
Costs
EMD
₹ 38,621Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
600425Tender No
NIT No. 19/E.E(R&B)/CBD/DB/HD/e-proc/25-26/ Date: 28.05.2025Tender Authority
Roads And Buildings Department ViewPurchaser Address
-Website
http://https://roadbuild.telangana.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Others;Providing 152.4 mm CC bed 1:2:4 Prop:using19.05mm gauge graded granite metal chips and cradling 152.4 mm SWG pipe line all round to have 75 mm nominal size thick cover over the sockets.TBSP-A.I-06.
165
288
47520
... More
Others;Providing and applying Brush bound (two componet acrylic polymer modified elastomericwaterproofing membrane which consists of Brush bound powder and Brush bound liquid acrylicemulsion)for aminimum 2mm thickness coating.(Work shall be executed as per manufacturer'sspercification and instructions.
1512.59
262
396298.58
... More
Others;Supply and laying of 20mm HBG metal for Rain Harvesting pits,including cost of material,labour,overheads &contractors profit,complete.
5
1423
7115
... More
Others;Supply and fixing of 50mm x 1½? PPR Female Threaded Adaptor conforming to DIN Standards 8077/8092 complete for finished item of work
20
729
14580
... More
Others;Supply and fixing of 110 mm dia - 45 Degree Bend - UPVC/SWR pipe fitting complete for finished item of work
10
84
840
... More
Others;Supply and fixing of 50mm x 1½? PPR Male Threaded Adaptor conforming to DIN Standards 8077/8092 complete for finished item of work
20
898
17960
... More
Others;Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete and cost of overheads and contractor profit for finished item of work. (APSS No.707 & 701
71
910
64653.31
... More
Others;Supply and laying of 40mm HBG metal for Rain Harvesting pits,including cost of material,labour,overheads &contractors profit,complete.
5
1226
6130
... More
Others;Disposal of useless soil/Debris to a distance of 20 Km I,e out side the municipal limits by mechanical means including loading,unloading charges etc complite for finished item of work. APPROVED RATE IN MINISTER QUARTER NO.30..Lift slab.
35
270
9475.9
... More
Others;Supply and laying of 110 mm dia 1219. mm (4'-0") Double Socket PVC/SWR pipe - 4 Kg/sq.cm complete for finished item of work
100
288
28800
... More
Others;Supply and laying of 160 mm dia 3 M Double Socket PVC/SWR pipe - 6 Kg/sq.cm complete for finished item of work
55
2213
121715
... More
Others;Plain Cement Concrete (1:3:6) nominal mix using 20mmsize graded machine crushed hard granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm 15%of 13.20 12.50mm,15%of 10mm and 10% of 6mm) from approvedquarry including cost and conveyance of all materoals like cement,fine aggrehate(sand) (with 50% river sand & 50% munufactured sand),coarse aggregete,water etc.to site centering using Steel scaffolding pipes, jack Props, wallers,Foot, plates, brackets, steel,Cectering Plates,etc.,all cgarges for mixing,laying concrete in position,curing & lift charges and cost of overheads & contractors profits etc.,complete for Bed Blocks for finished item of work. (APSS No. 402): HAND MIXING.
120.71
5281
637517.79
... More
Others;Plain Cement Concrete (1:5:10) (cement:fine aggregate:Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard,machine crushed hard granite metal from approved quarry including cost and conveyance of all materoals like cement,sand (with 50% river sand & 50% munufactured sand),coarse aggregete,water etc.to site all cgarges for mixing,mixing,laying concrete in foundations,ramming,finishing top surface to the required level,curing including cost of overheads & contractors profit etc.,complete for finished item of work. (APSS No. 402) HAND MIXING.
120.5
4606
555094.1
... More
Others;Supply and fixing of 110 mm dia - Plain Bend 87.5 Degree - UPVC/SWR Pipe fittings complete for finished item of work
30
100
3000
... More
Others;Dismantling Old cement mortar Plaster complete for finished item of work
285.99
9
2573.93
... More
Others;Supply and laying of premium make CPVC Pipes of 54.00mm OD PipeSDR 13.5 complete for finished item of work
193.44
577
111616.03
... More
Others;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding,lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., complete for finished item of work. (SS 901,903 & 904).
378.56
553
209697.31
... More
Others;Constructing 904.0 mm (3?0?) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of eringwith cementmortar1:3prop;½?thickbothinsideand outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.
12
8688
104256
... More
Others;Painting to walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC(Volatile Organic Compound) content less than 50gm/litre of approved brand and shade 2 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental cost and conveyance of all matetials to work site and all operational,incedental, labour charges etc. complete for finished item of work as per SS 912 -External Colouring- Plastic emulsion paint - 2 Coats.
3196.86
193
619231.78
... More
Others;Supply and laying of fine aggregate for Rain Harvesting pipes,including cost of material,labour,overheads &contractors profit,complete.
5
934
4670
... More
Others;Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI 651 & 4127 with C.I Grating & Cost. Brick masonry in CM 1:6 prop. Intermediate chamber and fitted with 304.8 mm x 288.6mm (12"x9") C.I Frame and hinged cover.
10
749
7490
... More
Others;Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Manual Means.
120.5
486
58566.62
... More
Others;Supply and fixing of 50mm PPR Elbow conforming to DIN Standards 8077/808 TBSP-J.complete for finished item of work
50
153
7650
... More
Others;Supply and fixing of 110 mm dia - Vent Cowl - UPVC/SWR pipe fittings complete for finished item of work
15
23
345
... More
Others;Supply and laying of premium make CPVC Pipes of 28.60mm OD PipeSDR 13.5 complete for finished item of work.
30.96
235
7275.6
... More
Others;Supply and fixing of 110 mm dia - Single 'Y' - UPVC/SWR pipe fittings complete for finished item of work
10
162
1620
... More
Others;Supply and fixing of 50mm PPR Ball Valve conforming to DIN Standards 8077/8092 complete for finished item of work
10
661
6610
... More
Others;Flooring with precast concrete blocks for paving of M-50 grade and thickness not less than 100mm for Heavy traffic areas conforming to IS:15658: 2006 in allshapes and designs as per the manufacturer's specification over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or R.C.C. roof slab, including near cement slurry of honey like consistency spread@ 3.3 kgs per sqm & jointed with neat cement to full depth mixed with pigment of matching shade,cost of all materials like cement, screened sand water and tiles etc., overheads and contractor profit for finished item of work.
535.5
1132
606432.33
... More
Others;Supply and fixing of 25mm PPR Ball Valve conforming to DIN Standards 8077/8092 complete for finished item of work
35
267
9345
... More
Others;Supply and fixing of 50mm x 1½? PPR Male Threaded Union conforming to DIN Standards 8077/8092 complete for finished item of work
20
2384
47680
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%