For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
530620Bid Award Id
ViewTender No
Short NIT.No.1/EE/DB/HD/2024-2025/3 dt:15.07.2024Tender Authority
Roads And Buildings Department ViewPurchaser Address
-Website
http://http://www.rnbgujarat.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
OR work;Stripping the excess soil from the shoulder surface to achieve the approved level for sectioning the berms, shoulders as per MoRT&H specification No.3003 (As per E-in-C circular Memo No. Maintenance /EE(TEC) TA15/AE4/2005, dt: 25-04-2005) PWD road to Binola via Siranpally,in Nizampur road from km.0/0 to8/200
300
15
4500
OR work;Manufacturing Supply and fixing of K.M Stones of size 1110 x 400 x150mm made with VRCC M15 Grade using 3.843 kgs of steel duly excavated pit of size 0.70 x0.45 x0.60 mts using 40mm metal,providing in CC Bed (1:3:6) prop of size 0.70 x0.45 x0.60mts fixing in RCC collor of size 0.60mt dia and 0.15 mt heiht made with RCC including painting 3 coats (1.coat of cement enamel paint & 2 coats of synthetic Enamel paint ) numbering with synthetic enamel paint of approved colvour including cost and conveyance of all materials, seignorage charges and labour charges for curing and steel fabrication etc, complete as per standard specification., drawings & as directed by the Engineer-in-Charge for finished item of work.( Km.8/0 to 10/0) PWD road to Binola via Siranpally,in Nizampur road from km.0/0 to8/200
6
2474
14844
OR work;Manufacturing Supply and fixing of H.M Stones of size 900 x 225 x150mm made with VRCC M15 Grade using 2.445 kgs of steel duly excavated pit of size 0.525 x0.45 x0.60 mts using 40mm metal,providing in CC Bed (1:4:8) prop of size 0.525 x 0.45 x0.60mts fixing in RCC collor of size 0.45mt dia and 0.15 mt heiht made with RCC including painting 3 coats (1.coat of cement enamel paint & 2 coats of synthetic Enamel paint ) numbering with synthetic enamel paint of approved colvour including cost and conveyance of all materials, seignorage charges and labour charges for curing and steel fabrication etc, complete as per standard specification., drawings & as directed by the Engineer-in-Charge for finished item of work.( Km.8/200 to 15/500) PWD road to Binola via Siranpally,in Nizampur road from km.0/0 to8/200
33
1447
47751
OR work;5th Kilometer stone - Reinforced cement concrete M15 Grade Kilometer stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc.,
2
3685
7370
OR work;Providing, Laying,Sprading and compacting graded HBG crushed stone aggregat to Wet Mix Macadam specification including cost, (excluding seigniorage) of all materials and including prmixing themateirial with water at OMC in Machanical mix Plant carriage of mixed matrrial by tipper to site, laying in uniform layers with paver in base courses on wll prepared surface and compacting with vibratory roller to achieve the deisred density etc, as direted by the Engineer-in-Charge; and as per MoRT&H specification 406 (5th revision) for finihsed item of work (Payment will be made based on levels for finished item of work) (Broken edes, potholes and road cutings) PWD road to Binola via Siranpally,in Nizampur road from km.0/0 to8/200
15
2845
42675
OR work;Providing B.T Patch work for pot holes of depth ranging from 25 to 35mm Using 20-25 mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and (VG-10) grade Bitumen at 72Kgs/1Cum of work for filling the pot holes with a 15mm thick layer using 10-12mm HBG/HBT chips and VG-10 grade bitumen at 80/kgs/1cum., including removal of the loose meterial in the pot holes trimming the edges to provide firm verticle faces, cleaning applying tack coat, filling the pot holes compacting and finishing and blinding the surface using stone dust/sand , including cost of all materials T&P and labour charges for all operations etc, complete for finished item of work. (Broken edes, potholes and road cutings) PWD road to Binola via Siranpally,in Nizampur road from km.0/0 to8/200
125
241
30175
OR work;Providing B.T Patch work for pot holes of depth ranging from 50 to 70mm and above, Using 40 mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and (VG-10) grade Bitumen at 42 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG-10 grade bitumen at 72 Kg/1cum , including removal of the loose meterial in the pot holes, trimming the edges to provide firm verticle faces, cleaning applying tack coat, filling the pot holes compacting and finishing and blinding the surface using stone dust/sand, including cost of all materials T&P and labour charges for all operations etc, complete. (Broken edes, potholes and road cutings) PWD road to Binola via Siranpally,in Nizampur road from km.0/0 to8/200
75
392
29430
OR work;Providing B.T Patch work for pot holes of depth ranging from 70mm and above, Using 40 mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and (VG-10) grade Bitumen at 42 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG-10 grade bitumen at 72 Kg/1cum , including removal of the loose meterial in the pot holes, trimming the edges to provide firm verticle faces, cleaning applying tack coat, filling the pot holes compacting and finishing and blinding the surface using stone dust/sand, including cost of all materials T&P and labour charges for all operations etc, complete. (Broken edes, pot holes and road cutings) PWD road to Binola via Siranpally,in Nizampur road from km.0/0 to8/200
75
453
34035
OR work;Scarifying the existing B.T surface to a depth of 50mm by mechanical means and disposal of scarified material with all lifts up to 100m as per MoRT&H (5th Revision) specn) No.305.4.3.(Broken edes, potholes and road cutings) PWD road to Binola via Siranpally,in Nizampur road from km.0/0 to8/200
350
10
3640
OR work;White Washing Two Coats with best shell lime afer thoroughtly brusing the surface to remove all dirt and remain of loose icluding all taxes, cost and conveyance of all material to site and all labour charges for mixing paint, application, curing scaffolding charges lifts charges, etc. complete for finished item of work.(at km.0-0 to 6/250 four lane road) Sarangapur-Jannepally road from 12/0 to 14/600
50
36
1815
OR work;Clearing Juliflora (Prosafis) jungle including up-rooting and removing of Juliflora stumps including all labour charges etc.,complete for finished item of work. Sarangapur-Jannepally road from 12/0 to 14/600
2250
4
9000
OR work;Making up loss of material /irregularities on the shoulder to the design level by adding fresh approved soil and compacting with appropriate equipment as per MoRT&H Specification No 3003 (As per E-in-C circular Memo No.Maintenance/E.E (TEC) TA15/AE4/2005, dt: 25/04/2005) Sarangapur-Jannepally road from 12/0 to 14/600
300
38
11400
OR work;Stripping the excess soil from the shoulder surface to achieve the approved level for sectioning the berms, shoulders as per MoRT&H specification No.3003 (As per E-in-C circular Memo No. Maintenance /EE(TEC) TA15/AE4/2005, dt: 25-04-2005) Sarangapur-Jannepally road from 12/0 to 14/600
300
15
4500
OR work;Manufacturing Supply and fixing of K.M Stones of size 1110 x 400 x150mm made with VRCC M15 Grade using 3.843 kgs of steel duly excavated pit of size 0.70 x0.45 x0.60 mts using 40mm metal,providing in CC Bed (1:3:6) prop of size 0.70 x0.45 x0.60mts fixing in RCC collor of size 0.60mt dia and 0.15 mt heiht made with RCC including painting 3 coats (1.coat of cement enamel paint & 2 coats of synthetic Enamel paint ) numbering with synthetic enamel paint of approved colvour including cost and conveyance of all materials, seignorage charges and labour charges for curing and steel fabrication etc, complete as per standard specification., drawings & as directed by the Engineer-in-Charge for finished item of work.( Km.8/0 to 10/0) Sarangapur-Jannepally road from 12/0 to 14/600
2
2455
4910
OR work;Manufacturing Supply and fixing of H.M Stones of size 900 x 225 x150mm made with VRCC M15 Grade using 2.445 kgs of steel duly excavated pit of size 0.525 x0.45 x0.60 mts using 40mm metal,providing in CC Bed (1:4:8) prop of size 0.525 x 0.45 x0.60mts fixing in RCC collor of size 0.45mt dia and 0.15 mt heiht made with RCC including painting 3 coats (1.coat of cement enamel paint & 2 coats of synthetic Enamel paint ) numbering with synthetic enamel paint of approved colvour including cost and conveyance of all materials, seignorage charges and labour charges for curing and steel fabrication etc, complete as per standard specification., drawings & as directed by the Engineer-in-Charge for finished item of work.( Km.8/200 to 15/500) Sarangapur-Jannepally road from 12/0 to 14/600
11
1435
15785
OR work;Providing, Laying,Sprading and compacting graded HBG crushed stone aggregat to Wet Mix Macadam specification including cost, (excluding seigniorage) of all materials and including prmixing themateirial with water at OMC in Machanical mix Plant carriage of mixed matrrial by tipper to site, laying in uniform layers with paver in base courses on wll prepared surface and compacting with vibratory roller to achieve the deisred density etc, as direted by the Engineer-in-Charge; and as per MoRT&H specification 406 (5th revision) for finihsed item of work (Payment will be made based on levels for finished item of work) (Broken edes, potholes and road cutings) Sarangapur-Jannepally road from 12/0 to 14/600
10
2752
27520
OR work;Providing B.T Patch work for pot holes of depth ranging from 25 to 35mm Using 20-25 mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and (VG-10) grade Bitumen at 72Kgs/1Cum of work for filling the pot holes with a 15mm thick layer using 10-12mm HBG/HBT chips and VG-10 grade bitumen at 80/kgs/1cum., including removal of the loose meterial in the pot holes trimming the edges to provide firm verticle faces, cleaning applying tack coat, filling the pot holes compacting and finishing and blinding the surface using stone dust/sand , including cost of all materials T&P and labour charges for all operations etc, complete for finished item of work. (Broken edes, potholes and road cutings) Sarangapur-Jannepally road from 12/0 to 14/600
125
238
29825
OR work;Providing B.T Patch work for pot holes of depth ranging from 50 to 70mm and above, Using 40 mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and (VG-10) grade Bitumen at 42 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG-10 grade bitumen at 72 Kg/1cum , including removal of the loose meterial in the pot holes, trimming the edges to provide firm verticle faces, cleaning applying tack coat, filling the pot holes compacting and finishing and blinding the surface using stone dust/sand, including cost of all materials T&P and labour charges for all operations etc, complete. (Broken edes, potholes and road cutings) Sarangapur-Jannepally road from 12/0 to 14/600
45
387
17420
OR work;Providing B.T Patch work for pot holes of depth ranging from 70mm and above, Using 40 mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and (VG-10) grade Bitumen at 42 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG-10 grade bitumen at 72 Kg/1cum , including removal of the loose meterial in the pot holes, trimming the edges to provide firm verticle faces, cleaning applying tack coat, filling the pot holes compacting and finishing and blinding the surface using stone dust/sand, including cost of all materials T&P and labour charges for all operations etc, complete. (Broken edes, pot holes and road cutings) Sarangapur-Jannepally road from 12/0 to 14/600
40
447
17904
OR work;Scarifying the existing B.T surface to a depth of 50mm by mechanical means and disposal of scarified material with all lifts up to 100m as per MoRT&H (5th Revision) specn) No.305.4.3.(Broken edes, potholes and road cutings) Sarangapur-Jannepally road from 12/0 to 14/600