Roads And Buildings Department Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
506036Bid Award Id
ViewTender No
NIT No. 7/13/2023-24 dt: 02.03.2024Tender Authority
Roads And Buildings Department ViewPurchaser Address
-Website
http://http://www.rnbgujarat.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Reconstruction of fallen down compound wall in the premises of (RB) Buildings Sub Division Office;Plastering 20mm thick. in CM (1:5) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., complete for finished item of work. (SS 901,903 & 904)
81
241
19521
... More
Reconstruction of fallen down compound wall in the premises of (RB) Buildings Sub Division Office;Brick masonry 230mm thick for panel walls in superstructure ,parapet walls with cement mortor (1:8) prop ( cement: Sand) using bricks second class of size (nonmodulor or traditional size) 23x11x7 cm from approved source having minimum crushing strength of not less than 3.50 n/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).
9
7676
69084
... More
Reconstruction of fallen down compound wall in the premises of (RB) Buildings Sub Division Office;Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard Granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand, water, stones etc., to site, labour for cutting stones to required size and shape, mixing of cement mortar, construction, curing etc.,complete for finished item of work in foundation and basement. (APSS No. 601 & 615).
10
4328
43280
... More
Reconstruction of fallen down compound wall in the premises of (RB) Buildings Sub Division Office;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed Granite metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, all charges for mixing, laying concrete in foundations , ramming, finishing top surface to the required level, curing etc., complete for finished item of work. (APSS No. 402) HAND MIXING
2.3
4562
10493
... More
Reconstruction of fallen down compound wall in the premises of (RB) Buildings Sub Division Office;Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mannual Means.
12
238
2856