For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Roads And Buildings Department Tender
Civil And Construction
Civil Works Others
Building Construction
Opening Date18 Jun 2024
Closing Date21 Jun 2024
Tender Amount₹ 10,25,659
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
519789Bid Award Id
ViewTender No
01/1/TS/TO/EE/R&B/MBD/2024-25,Dt:12.06.2024,Tender Authority
Roads And Buildings Department ViewPurchaser Address
-Website
http://http://www.rnbgujarat.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
GI SHED AT COURT;Supplying and fixing Gyp Board Suspended regular single layer false ceiling (GS-MFSC-4.1 as per India Gypsum) using 12.5 mm thick Gyp Board conforming to IS 2095 - 1982 fixing to Gyp steel GI perimeter channels of size 20 mm x 27 mm x 30 mm(web) of 0.55 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using Intermediate channels (45 mm x 15mm x 15mm x 0.9 mm) from soffit at 1220 mm c/c with ceiling angle (25 mm x 10 mm x 0.55 mm) fixed with GI Cleat and steel expansion fasteners & connecting clip to the ceiling channels (with knurled web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm) fixed in direction perpendicular to the intermediate channel at 457 mm c/c and fixing the 12.5 mm tapered edge Gypboard with 25 mm drywall screws at 230 mm c/c & jointing and finishing using joint compound and paper tape to have a flush look including filling the tapered & square edges with jointing compound, two coats of drywall topcoat, overheads and contractors profit, etc. complete for finished item of work as per Idia Gypsum Ltd specification.
75.15
1290
96944
GI SHED AT COURT;Plastering 12mm thick in two coats using screened sand (with 100% river sand and 0% Manufactured sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding (with MS CUPLOCK SCAFFOLD SYSTEM USING MS STEEL PLATE SHUTTERS) , lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)
73.62
544
40049
GI SHED AT COURT;Masonry work in CM(1:6) prop (Cement : Screened sand) with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand , bricks, water etc., to site, labour charges, like mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds) , constructing masonry, lift charges, curing, cost of overheads and contractors profit etc., complete for finished item of work. (APSS No. 501 & 504).
5.67
8527
48348
GI SHED AT COURT;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats.
238.39
276
65796
GI SHED AT COURT;Painting to new iron works with 2 coats of Synthetic Enamel paints in all shades using ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit. over 1 coat of Red Oxide Primer Paint for iron works of Grade -1 of approved brand to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site including cost of primer coat and all operational, incidental, labour charges etc. complete etc., complete including cost of overheads & contractors profit (APSS No.1200, 1207 & 1211) in all floors.
172
199
34228
GI SHED AT COURT;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) MACHINE MIXING
18.79
5027
94458
GI SHED AT COURT;Supply and fixing of roofing with 0.5mm thick galvanized / pre painted G.I. profiled sheets fixed to the purlins with 14 size self drilling screws with neoprene washer. Side laps are stitched with self tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape. The sheets are provided with anti capillary grove, including cost and conveyance of all materials, all operational, incidental labour charges, overheads and contractor's profit complete for finished item of work.
331
923
305513
GI SHED AT COURT;Providing Mild Steel Tubes & pipes of all diameters as per IS-1161, of different diameters, cutting, placing in position, including cost and conveyance of all materials to work site and all operational, incidental, labour charges including cost of overheads & contractors profit complete for finished item of work for purlins of AC sheet roofing.
2726
93
253518