Public Health And Municipal Engineering Department Tender

... More
The PHMED has issued a formal invitation for competitive bids for the Public Health And Municipal Engineering Department project, for Construction Of Compound Wall To Children Home Building In Narayanpet Municipality in Mahabub Nagar, Telangana, with an estimated contract value of Rs. 8,30,444. The bid opening date for this tender is 30-06-2023 and the last date for bid submission is 07-07-2023. Interested bidders for Public Health And Municipal Engineering Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Public Health And Municipal Engineering Department - PHMED Tender

Civil And Construction
Building Construction
Opening Date30 Jun 2023
Closing Date7 Jul 2023
Tender Amount₹ 8,30,444 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Compound Wall;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site , sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 350Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted. Column(0.30x0.30) for Gate portion

1.42

13074

18565.08

... More
Compound Wall;BLD-CSTN-2-1 (9): Earth work excavation of Foundation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). Earthwork Excavation By Manual Mean

50.71

258

13086.22

... More
Compound Wall;Supplying and fixing of MS Gate using 45 x 45 x 6mm MS equal angle alround and 2 Nos 35x35x5mm Equal angles horizontal supports at 0.50m c/c, 2.00mm MS sheet at bottom 0.30m height and 12mm MS square bars Vertically at 125mm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and painting gate with one coat of red oxide primer including cost and conveyance of all materials,Locking arrangment, Ornamental pieces etc ,cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work. considering 2 Gates

365.39

118

43174.01

... More
Compound Wall;Damp proof course 50 mm thick with 1:2:4 cement concrete Nominal mix, using 12mm graded hard broken stone aggregate including cost of all materials, conveyance charges of materials and cost of machinery, labour charges, mixing, placing in position, leveling, vibrating, curing etc and overheads & contractors profit, complete for finished item of work. (Using concrete mixer) Over RR Masonry below Brick Masonry

67.13

296

19870.48

... More
Compound Wall;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 350Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the difference in cost shall be deducted Pedestals for Gate portion

0.24

10647

2555.42

... More
Compound Wall;BLD-CSTN-3-7-(24) Using Concrete mixture all works up to Plinth Level Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed. PCC for Compound Wall & PCC for Gate Footing

7.34

4369

32074.99

... More
Compound Wall;BLD-CSTN-5-11 (49) : 11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using second class traditional size bricks including cost of all materials, seigniorage charges, labour and all operations for constructing half brick masonry, mixing cement mortar, curing etc., complete for finished item of work, but excluding conveyance charges of materials. Horizontal elevation portion

192.6

969

186631.33

... More
Compound Wall;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work . PCC for Compound Wall

29.97

4189

125564.71

... More
Compound Wall;Painting to new walls with 2 coats of Plastic Emulsion paint of apporved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 Qty as per Plastering area excluding pillars

470.47

188

88810.62

... More
Compound Wall;BLD-CSTN-3-3: Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M15 (1:2.5:5) using coarse and fine aggregates including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges, for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement Over Brick walls with 0.025m bearing, Deduct Brick Pillars portion from walls

5.25

5330

27985.18

... More
Compound Wall;RBR-EECD-9 -ii : Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal with initial lift of 3 mts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.5 MORD / 301 MORTH - Mechanical Means (with all lifts). Earthwork Excavation By Hard Rock

2.67

1559

4162.77

... More
Compound Wall;BLD-CSTN-5-4-(42) ; Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc.including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

8.82

7756

68411.36

... More
Compound Wall;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 350Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the difference in cost shall be deducted Footings for Gate portion

0.85

10087

8574.32



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.