For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
280048Bid Award Id
ViewTender No
46/SE/TUFIDC/Unit-III/JWN/Pkg-1/2021 Dt.27.11.2021Tender Authority
Public Health And Municipal Engineering Department ViewPurchaser Address
-Website
http://http://www.appublichealth.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
JWN PKG 1;Construction of sewer conical manhole as per type design using Fly ash cement/lime solid blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 - 225 x 100 x 60 and brick masonary in CM (1:5) prop; including CC (1:4:8) bed for foundation and of CC (1:2:4) prop; using 20mm HG metal for benching and channels, inside plastering 20 mm thick in single coat using sulphate resisting cement in CM (1:3) prop; and outside plastering 20 mm thick in single coat of OPC Cement in CM (1:3) prop; the foundation concrete in CC (1:4:8) prop; using 40mm nominal size hard broken granite stone and supporting incoming pipes with concrete block / masonary wherever necessary including finishing the gap with CM (1:3) prop; on both the sides including supply and fixing of manhole frame and cover (HD-35) and Plastic steps including cost and conveyance of all other incidental and operational charges etc., complete. for 1.20m dia manhole 1.65m depth
19
-
577252.87
... More
JWN PKG 1;Construction of sewer conical manhole as per type design using Fly ash cement/lime solid blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 - 225 x 100 x 60 and brick masonary in CM (1:5) prop; including CC (1:4:8) bed for foundation and of CC (1:2:4) prop; using 20mm HG metal for benching and channels, inside plastering 20 mm thick in single coat using sulphate resisting cement in CM (1:3) prop; and outside plastering 20 mm thick in single coat of OPC Cement in CM (1:3) prop; the foundation concrete in CC (1:4:8) prop; using 40mm nominal size hard broken granite stone and supporting incoming pipes with concrete block / masonary wherever necessary including finishing the gap with CM (1:3) prop; on both the sides including supply and fixing of manhole frame and cover (HD-35) and Plastic steps including cost and conveyance of all other incidental and operational charges etc., complete. for 0.90m dia manhole up to 1.10m
41
-
694303.84
... More
JWN PKG 1;PHE-LJSW-13: Lowering and laying in ready made trench true to alignment and gradient, jointing, and testing of stone ware pipes including cost of jointing material such as cement mortar (1:1) proportion and hemp yarn but excluding cost and conveyance of pipe. (Reference to specifications BIS No. 6530/72). for 250 mm dia SWG pipe.
754
-
299511.42
... More
JWN PKG 1;PHE-LJSW-13: Lowering and laying in ready made trench true to alignment and gradient, jointing, and testing of stone ware pipes including cost of jointing material such as cement mortar (1:1) proportion and hemp yarn but excluding cost and conveyance of pipe. (Reference to specifications BIS No. 6530/72). for 300 mm dia SWG Pipe.
920
-
409952
... More
JWN PKG 1;Manufacture, Supply of 250 mm SWG SP-1 pipes of ISI make conforming to ISI 651 including loading, unloading and transportation charges etc
754
-
869505.26
... More
JWN PKG 1;Manufacture, Supply of 300 mm dia SWG SP-1 pipes of ISI make conforming to ISI 651 including loading, unloading and transportation charges etc
920
-
1529214.8
... More
JWN PKG 1;Supply and laying of high performance expansion joint filler board confirming to IS:1838- 25 mm thick including cost and conveyance of all materials such as filler materials, labour charges etc complete.
46.48
-
56716.29
... More
JWN PKG 1;Carting of surplus excavated soil within a lead of 5Km from the site to a distance suitable including loading charges, cost & conveyance, dumping, labour charges and other incidental and operational charges etc., complete.
3500.41
-
235927.63
... More
JWN PKG 1;Saw cut joints for freshly laid concrete pavement including all material and labour charges (Grooves 2-3 mm)
11226.75
-
918348.15
... More
JWN PKG 1;Vaccum drying of freshly laid cement concrete floor using 100% air tight suction mat of suitable size and length, vaccum pump to maintain vaccum pressure 0.7-0.8 atmospheres as per the standard procedure floating with power floater, mechanical trawelling, finishing with sound edges and corners, including hire and operational charges of machinery, labour, fuel etc., complete for finished item of work as directed by Engineer-in-charge of the work. (As per Quotation)
13905
-
1042875
... More
JWN PKG 1;RBR-EECD-15: Construction of earthen shoulders with approved material obtained from roadway cutting with all leads and lifts including pre-watering of soil, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P etc., complete for finished item of work as per MoRT&H specification 305 (5th revision).
500.59
-
106200.17
... More
JWN PKG 1;RBR-CCPV-5-Construction of M30 grade plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement @ 400 kg per cum or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.
2085.76
-
15736078.89
... More
JWN PKG 1;RBR-FNDN-4 I(i) : Providing P.C.C grade M 10 concrete using 40 mm nominal size hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
1042.87
-
5356295.04
... More
JWN PKG 1;RBR-FNDN-22: Collection, Supply and filling with HBG Stone Chips 2.36 mm and below with intial lead in layers not excluding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidential, labour charges, hire charges of T & P etc. Complete for finished item of work. (APSS No. 309 & 310).
1464.67
-
1298268.84
... More
JWN PKG 1;RBR-EECD-5 i: Excavation for roadway in soil by manual means with initial lift of 3 mts and lead upto 50 m as per Technical Specification Clause 302.3 MORD including labour charges etc complete for finished item of work.
1714.8
-
465396.72
... More
JWN PKG 1;RBR-EECD-8(c) : Earthwork excavation for road way in soil by mechanical means including cutting and pushing the earth to side of embankment upto a lead of 100 metres including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete for finished item of work for trench cutting as per MOR&H specification No.301 and as directed by the Engineer-in-Charge.
4001.2
-
284565.34