For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 77,000Document Cost
Refer DocumentsTender Fee
₹ 15,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
577048Tender No
08/PJTAU/EO/TPA/2024-25,Dt:19-02-2025Tender Authority
Professor Jayashankar Telangana State Agricultural University ViewPurchaser Address
-Website
http://https://pjtsau.edu.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of New Hostel building at EEI, Rajendranagar, Hyderabad.;Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand (with 50% river sand & 50% manufactured sand)), coarse aggregate, water etc. to site, all charges for mixing, laying concrete in position, curing & lift charges and cost of overheads & contractors profit etc., complete for Bed Blocks for finished item of work. (APSS No. 402): HAND MIXING: Basement Wall
31
8843
274133
... More
Construction of New Hostel building at EEI, Rajendranagar, Hyderabad.;Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers like TATA,SAIL,VSP, Jindal as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126)
30.1
78347
2358245
... More
Construction of New Hostel building at EEI, Rajendranagar, Hyderabad.;Plinth beams :-
35
16704
584640
... More
Construction of New Hostel building at EEI, Rajendranagar, Hyderabad.;Supply and laying of ISI 25mm outer dia heavy grade (2.10 mm thickness) IS 9537 part 3 regid PVC pipe cocealed in Roof slabs with all required metallic deep boxes including all labour charges etc complete makes Sudhakar/Finolex/VIP/Precision
550
126
69300
... More
Construction of New Hostel building at EEI, Rajendranagar, Hyderabad.;Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mannual Means.
555
583
323565
... More
Construction of New Hostel building at EEI, Rajendranagar, Hyderabad.;Filling with carted gravel in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work(APSS NO.309&310).
263
469
123347
... More
Construction of New Hostel building at EEI, Rajendranagar, Hyderabad.;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand) , coarse aggregate, water etc. to site, all charges for laying concrete under foundations and under flooring bed, finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402): HAND MIXING
41
5675
232675
... More
Construction of New Hostel building at EEI, Rajendranagar, Hyderabad.;Ground floor : Columns (Above plinth level)
21.3
17472
372154
... More
Construction of New Hostel building at EEI, Rajendranagar, Hyderabad.;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed Granite metal from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for mixing, laying concrete in foundations , ramming, finishing top surface to the required level, curing including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No. 402) HAND MIXING
39
5491
214149
... More
Construction of New Hostel building at EEI, Rajendranagar, Hyderabad.;150mm thick
54
2018
108972
... More
Construction of New Hostel building at EEI, Rajendranagar, Hyderabad.;125mm thick
478
1817
868526
... More
Construction of New Hostel building at EEI, Rajendranagar, Hyderabad.;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cms thick consolidating each deposit layer with watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P and cost of overheads & contractors profit etc., complete for finished item of work for (APSS NO.309&310)
421
62
26102
... More
Construction of New Hostel building at EEI, Rajendranagar, Hyderabad.;Footings :-
99
13188
1305612